Skip to content
OneClickSWMS
EarthmovingHigh-risk work

Soil compaction equipment SWMS, drafted for your job

Start with your job

Which state is the site in?

Preview from a reviewed example. No account needed.

Compacting fill puts vibrating rollers, plates and rammers beside soft edges and workers guiding the finish, with jolting transmitted through seats and handles. Tell us the equipment and site: your SWMS is drafted around the compaction passes, and you check it on site before work starts.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Soil compaction equipment

Site Your site address

Law Your state

High-risk construction work

  • Work where powered mobile plant is moving

Job steps, hazards and controls

1Inspect machine and fill areaDefective controls and unsupported edgesHighCheck equipment condition and mark suitable compaction routes
2Set passes and worker separationReversing rollers beside ground crewsHighSeparate walking routes and agree approach signals
3Compact open fill areasRollover dust and whole-body joltingHighKeep to supported routes and condition dry fill
4Compact edges with smaller equipmentRammer pinch points and handle vibrationHighChoose suitable equipment and keep a clear operator position
5Stop load and secure equipmentDropped plates and hot enginesHighIsolate the machine and use designated lifting points
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your soil compaction equipment SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where powered mobile plant is moving
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a soil compaction equipment job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Soil roller overturning beside unsupported fill edges and batters

    Extreme
    • Prepare a supported compaction route suited to the machine and ground
    • Keep rollers off weak edges and stop if fill slumps or cracks
  2. 2

    Ground workers struck by reversing rollers during soil compaction

    High
    • Separate compaction passes from survey and ground crew access
    • Stop the roller before anyone approaches the working area
  3. 3

    Feet trapped beneath bouncing rammers beside trench walls

    High
    • Choose compaction equipment that fits the space without trapping the operator
    • Keep feet clear of the rammer plate and stop before repositioning
  4. 4

    Hand and back strain using soil plates rammers and rollers

    Medium
    • Use maintained vibration controls and suitable seats or isolated handles
    • Plan task rotation and breaks to limit jolting exposure; stop and report discomfort
  5. 5

    Crushing while lifting vibrating plates onto transport trailers

    High
    • Use the designated lifting point and a suitable mechanical lifting aid
    • Secure the machine on the trailer before removing the lifting connection
  6. 6

    Soil dust surrounding operators during dry fill compaction

    High
    • Condition fill to the planned moisture before compacting
    • Keep others clear and use respiratory protection for remaining dust
  7. 7

    Compactor exhaust collecting in poorly ventilated foundation excavations

    High
    • Use equipment suited to the excavation and avoid combustion engines where ventilation is poor
    • Assess the work area and stop if exhaust cannot disperse

How the job usually runs

  1. 1Inspect machine and fill areaDefective controls and unsupported edges → Check equipment condition and mark suitable compaction routes
  2. 2Set passes and worker separationReversing rollers beside ground crews → Separate walking routes and agree approach signals
  3. 3Compact open fill areasRollover dust and whole-body jolting → Keep to supported routes and condition dry fill
  4. 4Compact edges with smaller equipmentRammer pinch points and handle vibration → Choose suitable equipment and keep a clear operator position
  5. 5Stop load and secure equipmentDropped plates and hot engines → Isolate the machine and use designated lifting points

PPE for this job

  • Safety boots
  • High-visibility clothing
  • Safety glasses
  • Hearing protection
  • Work gloves
  • Respiratory protection selected for soil dust

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Soil compaction equipment SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Can it cover rollers and plate compactors on one job?

Yes. List each machine and the areas it will compact. The draft separates roller travel from plate or rammer work, with ground support, access and vibration controls suited to each machine.

Does it include loading a vibrating plate onto a trailer?

Yes. Describe the lifting aid and trailer access. The draft includes stopping the machine, using its designated lifting point and securing it for transport before the lifting connection is released.

How much does a soil compaction equipment SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS