Mould remediation clean SWMS, drafted for your job
Removing mouldy linings releases spores and dust, while damp floors, weakened materials and water-damaged wiring can make the work area unsafe to enter. Tell us the job and the site: your SWMS is drafted around them, and you check it with the crew before work starts.
A$39per job
However many high-risk activities it covers.
- However many high-risk activities it covers.
- 3 for A$99
- 10 for A$249
- Yearly A$129 for 120
- Monthly A$60 for 10
You review it on site before work starts.
Your Business
Safe Work Method Statement
Version 1
Draft
Mould remediation clean
Site Your site address
Law Your state
High-risk construction work
- Work where the air may be contaminated or flammable
Job steps, hazards and controls
| 1 | Assess moisture and building condition | Wet wiring and weak materials | High | Arrange isolation and assess damaged structures before opening linings |
| 2 | Build the containment zone | Spores entering occupied rooms | High | Seal boundaries and set suitable filtered extraction |
| 3 | Remove damaged porous materials | Mould dust release | High | Use controlled removal and bag waste inside containment |
| 4 | Clean surfaces and dry the area | Chemical splash and continuing dampness | Medium | Use suitable products and address the moisture source |
| 5 | Inspect and remove containment | Residual mould debris transfer | Medium | Complete filtered cleaning and check conditions before opening the area |
Illustrative first page. Yours carries your business name only.
What you get
What your mould remediation clean SWMS will contain
An A4 document your crew can read on site, a PDF for the builder and a sign-on register.
- Job and site detailsYour business, the site, the principal contractor, the dates.
- High-risk construction workThe categories your job involves, ticked.
- Step-by-step methodEach step with its hazards, risk rating and controls.
- How controls are checkedWho puts each control in place, monitors and reviews it.
- PPE, plant and permitsEquipment and training the job needs.
- Emergency planAssembly point, first aid, nearest hospital to confirm on site.
- Consultation and reviewWho was consulted, when it is reviewed.
- Sign-on registerYour crew signs by QR or on paper.
High-risk construction work
Categories this task often involves
You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.
- Work where the air may be contaminated or flammable
State notes
Rules depend on your state
Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.
Hazards and controls
What goes wrong on a mould remediation clean job, and how the SWMS controls it
These rows are written for this task. Your draft adds the ones your site and method need.
- 1
Mould spores released while damaged plasterboard and insulation are removed
High- Isolate the affected area and use suitable filtered extraction before disturbing material
- Dampen materials where suitable and bag them at the removal point
- 2
Mould dust escaping through doors and shared ventilation ducts
High- Seal the work boundary and isolate shared air paths before removal
- Check containment and filtered airflow; stop if the boundary is damaged
- 3
Falls through water-weakened floors beneath mould damaged linings
High- Inspect damp structures and barrier areas that cannot support the crew
- Arrange structural assessment before removing damaged supporting material
- 4
Shock from water-damaged wiring behind mould affected walls
Extreme- Have affected electrical circuits isolated and tested before opening wet linings
- Keep cleaning water and extraction equipment clear of exposed electrical parts
- 5
Cleaning solution splashing while mouldy surfaces are scrubbed overhead
Medium- Choose a suitable lower hazard product and use controlled application
- Wear splash protection and avoid mixing cleaning products
- 6
Mould debris spreading along the waste route to the skip
Medium- Seal waste inside containment and clean bag exteriors before transfer
- Use a designated waste route separated from occupied clean areas
How the job usually runs
- 1Assess moisture and building conditionWet wiring and weak materials → Arrange isolation and assess damaged structures before opening linings
- 2Build the containment zoneSpores entering occupied rooms → Seal boundaries and set suitable filtered extraction
- 3Remove damaged porous materialsMould dust release → Use controlled removal and bag waste inside containment
- 4Clean surfaces and dry the areaChemical splash and continuing dampness → Use suitable products and address the moisture source
- 5Inspect and remove containmentResidual mould debris transfer → Complete filtered cleaning and check conditions before opening the area
PPE for this job
- Fitted particulate respirator
- Disposable protective clothing
- Chemical resistant gloves
- Splash goggles
- Safety boots
Your draft lists the PPE your site and method need.
After you finalise
Brief your crew and send it to your builder
Crew signs by QR
Send to my builder
PDF and register
Builder sent it back?
Make their changes and re-issue the same job free. Workers re-sign the new version.
Questions
Mould remediation clean SWMS questions
- Last reviewed
- 21 October 2026
- How
- Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
- Next review
- Every six months, or when the method or rules change
Does the draft cover removing mouldy plasterboard?
Yes. Describe the affected materials and occupied areas nearby. The draft includes containment, filtered extraction, controlled removal and sealing waste before it moves through the building.
Can the room reopen while the wall is still damp?
The moisture source and remaining dampness need assessment before the area is handed back. The draft includes drying and checking the work area, rather than relying on the disappearance of visible mould alone.
How much does a mould remediation clean SWMS cost?
One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.
Is this a template?
No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.
Who checks the SWMS?
You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.
My builder sent it back. What now?
Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.
How does my crew sign it?
Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.