Concrete pool construction SWMS, drafted for your job
Pool construction puts steel fixers and shotcrete crews inside a backyard excavation, often close to house footings and restricted plant access. Tell us the pool and site: your SWMS is drafted around the shell and finishing work, and you check it on site before work starts.
A$39per job
However many high-risk activities it covers.
- However many high-risk activities it covers.
- 3 for A$99
- 10 for A$249
- Yearly A$129 for 120
- Monthly A$60 for 10
You review it on site before work starts.
Your Business
Safe Work Method Statement
Version 1
Draft
Concrete pool construction
Site Your site address
Law Your state
High-risk construction work
- Work in or near a deep trench, shaft or tunnel
- Work where powered mobile plant is moving
- Work in or near water where someone could drown
Job steps, hazards and controls
| 1 | Inspect access and locate services | Restricted plant routes and hidden services | High | Prove services and plan separate worker and excavation routes |
| 2 | Excavate and secure the pool | Ground collapse and unprotected edges | Extreme | Install ground support and maintain pool work area barriers |
| 3 | Fit reinforcement and plumbing | Projecting steel and awkward shell access | High | Protect bar ends and provide stable access |
| 4 | Spray or place the shell | Hose whip and concrete rebound | High | Separate the nozzle zone and check hose connections |
| 5 | Waterproof finish and fill | Coating vapours and accumulated water | High | Ventilate the shell and maintain barriers and water rescue arrangements |
Illustrative first page. Yours carries your business name only.
What you get
What your concrete pool construction SWMS will contain
An A4 document your crew can read on site, a PDF for the builder and a sign-on register.
- Job and site detailsYour business, the site, the principal contractor, the dates.
- High-risk construction workThe categories your job involves, ticked.
- Step-by-step methodEach step with its hazards, risk rating and controls.
- How controls are checkedWho puts each control in place, monitors and reviews it.
- PPE, plant and permitsEquipment and training the job needs.
- Emergency planAssembly point, first aid, nearest hospital to confirm on site.
- Consultation and reviewWho was consulted, when it is reviewed.
- Sign-on registerYour crew signs by QR or on paper.
High-risk construction work
Categories this task often involves
You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.
- Work in or near a deep trench, shaft or tunnel
- Work where powered mobile plant is moving
- Work in or near water where someone could drown
State notes
Rules depend on your state
Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.
Hazards and controls
What goes wrong on a concrete pool construction job, and how the SWMS controls it
These rows are written for this task. Your draft adds the ones your site and method need.
- 1
Pool excavation walls collapsing beside house footings and boundary fences
Extreme- Assess ground and nearby structures and install planned excavation support
- Keep spoil and plant outside the supported excavation edge
- 2
Falls into the unfinished pool shell during steel fixing
High- Fence the pool work area and provide stable access into the excavation
- Keep shell edges protected while trades move between work levels
- 3
Impalement on pool shell reinforcement around steps and wall returns
High- Fit suitable impalement protection or barrier exposed steel ends
- Stage reinforcement so access does not cross projecting bars
- 4
Shotcrete rebound and cement spray inside the pool shell
High- Separate the spray zone and use suitable ventilation and dust control
- Keep nonessential workers outside and use spray task respiratory and splash protection
- 5
Shotcrete hose whip at the pool shell nozzle station
High- Inspect and secure hose couplings before pressurising the shotcrete line
- Stop pumping and relieve pressure before clearing a blockage
- 6
Vapours from pool waterproofing products collecting inside the shell
High- Select lower hazard products and ventilate the pool shell
- Control application and wear protection selected for the coating
- 7
Drowning in rainwater or filling water inside an unfinished pool
Extreme- Keep pool barriers secure and control access before water accumulates
- Arrange drainage and a rescue method before filling or work near water
How the job usually runs
- 1Inspect access and locate servicesRestricted plant routes and hidden services → Prove services and plan separate worker and excavation routes
- 2Excavate and secure the poolGround collapse and unprotected edges → Install ground support and maintain pool work area barriers
- 3Fit reinforcement and plumbingProjecting steel and awkward shell access → Protect bar ends and provide stable access
- 4Spray or place the shellHose whip and concrete rebound → Separate the nozzle zone and check hose connections
- 5Waterproof finish and fillCoating vapours and accumulated water → Ventilate the shell and maintain barriers and water rescue arrangements
PPE for this job
- Safety boots
- Waterproof gloves
- Safety glasses
- Face shield for spray work
- Hearing protection
- Respiratory protection selected for shotcrete and coatings
- Protective clothing
Your draft lists the PPE your site and method need.
After you finalise
Brief your crew and send it to your builder
Crew signs by QR
Send to my builder
PDF and register
Builder sent it back?
Make their changes and re-issue the same job free. Workers re-sign the new version.
Questions
Concrete pool construction SWMS questions
- Last reviewed
- 21 October 2026
- How
- Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
- Next review
- Every six months, or when the method or rules change
Does it cover a sprayed concrete pool shell?
Yes. Describe the shotcrete pump, nozzle arrangement and backyard access. The draft includes hose checks, rebound control, respiratory protection and keeping other trades outside the spray zone.
Can it include waterproofing and tiling after the shell is cast?
Yes. Describe those finishing stages and the products used. The draft can cover shell access, coating ventilation and keeping the pool isolated while finishing and filling work take place.
How much does a concrete pool construction SWMS cost?
One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.
Is this a template?
No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.
Who checks the SWMS?
You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.
My builder sent it back. What now?
Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.
How does my crew sign it?
Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.
Does it work in my state?
Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.