Personnel and materials hoist SWMS, drafted for your job

Start with your job

Which state is the site in?

Preview from a reviewed example. No account needed.

A site hoist puts people and pallets in a cage at open landing edges, where an unlatched gate or a load past the cage lip turns a routine ride into a fall. Describe your work area and method when you start. Your SWMS is drafted for those details, then checked against the site before work begins.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Personnel and materials hoist

Site Your site address

Law Your state

High-risk construction work

  • Work where someone could fall from height

Job steps, hazards and controls

1Inspect hoist and gatesFaulty interlocks and damageHighCheck before first ride; report faults
2Call and level the cageGap at the landingMediumWait for the level stop before opening the gate
3Load people and materialsOverload and protruding itemsHighRespect capacity; keep loads inside
4Travel to the floorCrush at interfacesHighGates closed; hands and gear inside
5Unload and clear the landingDropped and shifting materialsMediumUnload to the landing, not the edge
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your personnel and materials hoist SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where someone could fall from height
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a personnel and materials hoist job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Worker falling through an open landing gate

    High
    • Keep landing gates closed and latched until the cage is level at that floor
    • Report faulty gates and interlocks and take the hoist out of use
  2. 2

    Hoist overloaded with workers and materials

    High
    • Load to the posted capacity and count people and weight together
    • Run separate trips for people and heavy materials where loads combine
  3. 3

    Materials protruding and catching on ties or landings

    High
    • Keep every load fully inside the cage before travelling
    • Restrain loose and long items and send oversize loads another way
  4. 4

    Crush injuries at the cage and landing gap

    High
    • Wait for the cage to level before opening gates and stepping across
    • Keep hands and feet out of the gap while the cage settles
  5. 5

    Dropped materials onto workers at the hoist base

    High
    • Barrier the base area and keep loose items inside the cage
    • Unload onto the landing floor, never onto an open edge
  6. 6

    Workers trapped mid-travel after power loss

    Medium
    • Stay in the cage and use the emergency call to raise the alarm
    • Only trained personnel run the emergency lowering procedure
  7. 7

    Strains loading pallets and materials into the cage

    Medium
    • Roll loads in on trolleys over the landing plate
    • Team lift awkward items and stack the cage so nothing shifts

How the job usually runs

  1. 1Inspect hoist and gatesFaulty interlocks and damage → Check before first ride; report faults
  2. 2Call and level the cageGap at the landing → Wait for the level stop before opening the gate
  3. 3Load people and materialsOverload and protruding items → Respect capacity; keep loads inside
  4. 4Travel to the floorCrush at interfaces → Gates closed; hands and gear inside
  5. 5Unload and clear the landingDropped and shifting materials → Unload to the landing, not the edge
  6. 6Respond to a stoppageEntrapment mid-travel → Stay in the cage; use the emergency plan

PPE for this job

  • Safety helmet
  • Safety boots
  • High-visibility clothing
  • Work gloves

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Personnel and materials hoist SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Does it cover carrying people and materials together?

Yes. Describe the loads you run. The draft covers the posted capacity, counting workers and materials together, and running separate trips when combined loads get close to the limit.

What happens if the hoist stops between floors?

A stopped cage is handled through the hoist emergency plan. The draft covers staying inside, calling for help and leaving emergency lowering to personnel trained for that hoist.

Can long materials hang out of the cage?

No. The draft keeps every load inside the cage before travel. Describe oversize items so the draft can address a separate planned lifting method, such as a crane lift.

How much does a personnel and materials hoist SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS