Skip to content
OneClickSWMS
EarthmovingHigh-risk work

Remote control trench roller SWMS, drafted for your job

Start with your job

Which state is the site in?

Preview from a reviewed example. No account needed.

A remote trench roller can crush someone against a trench wall without an operator in the cab, and the person holding the controller can lose sight of the edge. Tell us the job and the site: your SWMS is drafted around them, and you check it with the crew before work starts.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Remote control trench roller

Site Your site address

Law Your state

High-risk construction work

  • Work where powered mobile plant is moving
  • Work in or near a deep trench, shaft or tunnel

Job steps, hazards and controls

1Check roller and remote controlsFailed stop or lost signalExtremeTest movement, emergency stop and signal-loss response in a clear area
2Prepare trench and operator positionUnprotected edges and unstable wallsExtremeConfirm trench protection and a firm viewing position
3Lower roller into the trenchSuspended compacting machineHighUse designated lifting points and clear the landing zone
4Compact backfill in sequenceCrushing and excavator interactionExtremeKeep people out and separate filling from roller operation
5Stop, recover and secure rollerUnexpected movement during retrievalHighIsolate the machine before connecting lifting gear or approaching
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your remote control trench roller SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where powered mobile plant is moving
  • Work in or near a deep trench, shaft or tunnel
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a remote control trench roller job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Trench roller continuing to move after remote control signal loss

    Extreme
    • Test signal-loss stopping and emergency controls in a clear area before use
    • Stop work if commands fail or the roller responds unpredictably
  2. 2

    Operator stepping backwards over the trench edge while watching the roller

    High
    • Set a firm protected operating position away from the edge
    • Keep the machine visible without walking backwards along an unprotected trench
  3. 3

    Workers trapped between the remote roller and trench walls

    Extreme
    • Keep people out of the trench while the roller travels or vibrates
    • Isolate the roller before anyone approaches for inspection or retrieval
  4. 4

    Roller vibration loosening trench walls and undermining nearby edges

    Extreme
    • Confirm trench protection and ground suitability before compaction starts
    • Stop if cracking, slumping or movement develops around the trench
  5. 5

    Dropped trench roller during lowering or recovery by excavator

    High
    • Use the designated lifting points and a planned mechanical lifting arrangement
    • Keep workers outside the lift path and machine landing area
  6. 6

    Excavator bucket entering the trench while roller compaction continues

    High
    • Separate fill placement and roller operation into distinct work periods
    • Park the roller clear and confirm crews are out before the excavator places fill

How the job usually runs

  1. 1Check roller and remote controlsFailed stop or lost signal → Test movement, emergency stop and signal-loss response in a clear area
  2. 2Prepare trench and operator positionUnprotected edges and unstable walls → Confirm trench protection and a firm viewing position
  3. 3Lower roller into the trenchSuspended compacting machine → Use designated lifting points and clear the landing zone
  4. 4Compact backfill in sequenceCrushing and excavator interaction → Keep people out and separate filling from roller operation
  5. 5Stop, recover and secure rollerUnexpected movement during retrieval → Isolate the machine before connecting lifting gear or approaching

PPE for this job

  • Safety boots
  • High visibility clothing
  • Head protection
  • Safety glasses
  • Hearing protection
  • Handling gloves

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Remote control trench roller SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Where should the operator stand with the roller remote?

Stand in a firm protected position with the roller and trench edge visible. The draft includes selecting that position before compaction and stopping to reposition rather than following the machine backwards along an open edge.

Can the excavator add fill while the trench roller runs?

Separate those activities. The draft includes parking the roller clear, confirming people are outside the trench and handing the area over before the excavator places the next layer of fill.

How much does a remote control trench roller SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS