Professional SWMS for safe decoration, artwork, and fixture installation and removal work

Decoration Installation-Removal Safe Work Method Statement

2,000+ Australian Businesses Trust OneClickSWMS

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Decoration installation and removal involves mounting and dismantling artwork, fixtures, lighting, and decorative elements, requiring careful management of working at heights, manual handling, and electrical safety.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Decoration installation and removal involves mounting artwork, fixtures, and decorative elements at various heights, requiring careful management of fall hazards, heavy lifting, and electrical safety for lighting installations.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Decoration work involves working at heights, manual handling, and tool use that can cause falls, strains, and injuries. Australian standards require proper fall protection, lifting techniques, and electrical safety measures.

Reinforce licensing, insurance, and regulator expectations for Decoration Installation-Removal Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Working at Heights

High

Installing decorations on walls and ceilings requires ladders where falls can cause severe injury.

Consequence: Falls from 2-4 meters causing fractures, head injuries, or fatality. Ladder instability major risk.

Manual Handling Injuries

Medium

Heavy artwork, fixtures, lighting require lifting and positioning, especially overhead.

Consequence: Back injuries, shoulder strain, hernias, or dropped objects causing injury.

Electrical Hazards

Medium

Installing lighting fixtures involves wiring and proximity to live electrical systems.

Consequence: Electric shock, burns, or fire from faulty connections or improper wiring.

Tool and Equipment Hazards

Medium

Using ladders, drills, hammers, cutting tools creates risks from sharp edges and misuse.

Consequence: Lacerations, puncture wounds, eye injuries from flying debris or tool failure.

Slips, Trips, Falls

Medium

Working on ladders, carrying materials creates slip and trip hazards in occupied spaces.

Consequence: Sprains, fractures, head injuries from falls on same level.

Structural Damage

Low

Improper mounting can damage walls/ceilings, causing structural failure or falling hazards.

Consequence: Wall damage, fixture failure leading to injury. Legal liability for property damage.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Elimination - Low-Level Work

Elimination

Select installation methods eliminating working at heights by using ground-based access.

Implementation

1. Plan low-level installations. 2. Use extendable tools. 3. Pre-assemble on ground. 4. Limit heights under 2m.

Engineering - Safe Access

Engineering

Provide stable ladders and platforms for elevated decoration work.

Implementation

1. Use AS 1892 compliant ladders. 2. Provide guard rails. 3. Inspect equipment. 4. Use mechanical aids.

Administrative - Procedures

Administrative

Develop procedures for ladder safety, manual handling, electrical work.

Implementation

1. Create work procedures. 2. Implement buddy system. 3. Develop lifting plans. 4. Establish emergency response.

PPE - Protection

PPE

Provide PPE for elevated work, electrical safety, general activities.

Implementation

1. Issue harnesses for heights over 2m. 2. Provide safety glasses. 3. Use cut-resistant gloves. 4. Provide helmets.

Personal protective equipment

Requirement: Type 1 hard hat with chin strap

When: All work activities, especially overhead

Requirement: Clear safety glasses with side protection

When: All work activities, especially drilling

Requirement: Full-body harness with double lanyards

When: Heights over 2 meters or fall risk

Requirement: Cut-resistant work gloves

When: All decoration handling and tools

Requirement: Steel-capped boots with non-slip soles

When: All work activities

Inspections & checks

Before work starts

  • Inspect ladders and access equipment
  • Check mounting surfaces integrity
  • Verify electrical isolation
  • Inspect tools and decorations
  • Check work area for hazards
  • Confirm emergency communication
  • Check weather conditions
  • Verify PPE availability

During work

  • Monitor ladder stability regularly
  • Check harness attachments
  • Verify electrical isolation
  • Inspect mounting during installation
  • Monitor fatigue signs
  • Check decoration stability
  • Verify work zone security
  • Monitor weather conditions

After work

  • Test decoration stability
  • Verify electrical functionality
  • Check for wall/ceiling damage
  • Inspect work area cleanliness
  • Document installations
  • Verify client satisfaction
  • Clean work area
  • Report incidents

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready
1

Site Assessment and Planning

Assess location, check structural integrity, plan access methods, prepare equipment.

2

Equipment Setup and Access

Set up ladders/platforms according to specifications. Establish stable platforms.

3

Material Preparation and Handling

Prepare decorations, check damage, organize tools, plan lifting sequences.

4

Mounting and Installation

Install mounting hardware, secure decorations using appropriate fasteners.

5

Electrical Connections

Install electrical connections for lighting following standards. Test continuity.

6

Adjustment and Testing

Adjust positioning, test stability, verify functionality. Make final alignments.

7

Removal and Cleanup

Remove decorations safely, repair damage, clean areas, dispose of waste.

Frequently asked questions

What height requires fall protection in decoration work?

Fall protection required for work at 2 meters or more. For decoration work, harnesses needed for ceiling installations over 2 meters. Standard wall work under 2 meters may not require full fall arrest.

How do I safely handle heavy decorative items?

Use mechanical lifting aids for items over 15kg. Work in teams. Plan sequences to minimize height lifting. Use proper manual handling techniques. Consider pre-positioning.

What electrical safety precautions are needed for lighting fixtures?

Licensed electricians only. Isolate power supplies. Install RCD protection. Use proper earthing. Test systems before handover. Never work on live systems near water.

How do I ensure wall mounts support decoration weight?

Check wall construction (brick, plasterboard). Use appropriate fasteners. Calculate loads. Test mounting strength. Consult owner for structural concerns.

What safety considerations apply to occupied buildings?

Establish exclusion zones. Use warning signs. Work during off-hours. Maintain communication with occupants. Have evacuation procedures.

Related SWMS documents

Browse all documents

Decoration installation and removal involves the mounting, adjustment, and dismantling of decorative elements including artwork, fixtures, lighting, mirrors, shelving, and ornamental features in residential, commercial, and hospitality settings. This work includes mechanical fastening, electrical connections for lighting, and safe removal procedures. Typical activities include picture hanging, fixture mounting, lighting installation, decorative panel attachment, and safe removal of existing decorations. Work occurs in homes, offices, hotels, restaurants, and public buildings, with varying complexity from simple wall hangings to complex multi-piece installations. This SWMS applies to all decoration installation and removal activities, including equipment setup, mounting procedures, electrical connections, and dismantling operations.

Decoration work involves working at heights, heavy lifting, and tool use that can cause falls, strains, and injuries. Safe Work Australia reports show that home renovation and decoration work contributes to workplace incidents, with falls from ladders and manual handling injuries being common. Australian WHS Regulations require specific controls for working at heights, manual handling, and electrical work. Improper decoration installation can result in falling objects, electrical faults, or structural damage that endangers occupants. The combination of elevated work, manual handling, and precision tool use creates complex safety challenges that require systematic risk management and compliance with safety standards.

Trusted by 1,500+ Australian construction teams

Decoration Installation-Removal SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.