Working in plumbing risers SWMS, drafted for your job

Start with your job

Which state is the site in?

Preview from a reviewed example. No account needed.

Open riser floors create a fall path through the building, and a loose pipe or tool can strike crews working beneath the same shaft. Tell us the riser and site: your SWMS is drafted around the access and pipework, and you check it on site before work starts.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Working in plumbing risers

Site Your site address

Law Your state

High-risk construction work

  • Work where someone could fall from height

Job steps, hazards and controls

1Inspect riser and coordinate levelsOpen shafts and workers belowExtremeClose affected levels and inspect access and ventilation
2Protect floor openingsFalls through riser penetrationsExtremeInstall secured covers or edge protection before work
3Install supports and pipe sectionsSlipping pipes and bracket accessHighUse a guarded platform and restrain each pipe section
4Connect and seal penetrationsLive services and sealing productsHighVerify isolation and use controlled seal application
5Inspect and close the riserLoose items and incomplete opening protectionHighCheck supports remove loose items and restore covers
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your working in plumbing risers SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where someone could fall from height
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a working in plumbing risers job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Falls through uncovered plumbing riser floor penetrations

    Extreme
    • Fit secured covers or edge protection before opening riser access
    • Keep protection in place and close openings whenever work pauses
  2. 2

    Tools and pipe fittings falling down an occupied riser shaft

    High
    • Separate work levels and keep people outside the area below
    • Contain tools and small fittings and secure items beside openings
  3. 3

    Vertical pipe sections slipping before riser brackets hold

    High
    • Support each section with lifting equipment and temporary restraint
    • Check permanent supports before releasing the pipe from lifting gear
  4. 4

    Falls reaching pipe brackets from narrow riser access platforms

    High
    • Use a designed work platform suited to the shaft and fixing positions
    • Keep the platform clear and avoid climbing pipework or brackets
  5. 5

    Dust and fumes collecting in poorly ventilated plumbing risers

    High
    • Assess shaft ventilation and avoid entry where work can be done externally
    • Control dust and arrange a separate entry assessment where conditions need it
  6. 6

    Unexpected discharge from existing services inside plumbing risers

    High
    • Identify and isolate affected services before altering riser pipework
    • Protect neighbouring services and confirm isolation with building management
  7. 7

    Skin and eye contact installing riser penetration seal products

    Medium
    • Choose a controlled application method suited to the penetration
    • Wear product selected protection and keep seal materials clear of access

How the job usually runs

  1. 1Inspect riser and coordinate levelsOpen shafts and workers below → Close affected levels and inspect access and ventilation
  2. 2Protect floor openingsFalls through riser penetrations → Install secured covers or edge protection before work
  3. 3Install supports and pipe sectionsSlipping pipes and bracket access → Use a guarded platform and restrain each pipe section
  4. 4Connect and seal penetrationsLive services and sealing products → Verify isolation and use controlled seal application
  5. 5Inspect and close the riserLoose items and incomplete opening protection → Check supports remove loose items and restore covers

PPE for this job

  • Safety boots
  • Safety helmet
  • Safety glasses
  • Work gloves
  • Respiratory protection selected for riser dust
  • Chemical-resistant gloves for sealing products

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Working in plumbing risers SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Does it cover several crews working in the same riser?

Yes. Describe the work levels and trades sharing the shaft. The draft includes coordinating access, separating work above and below, and keeping tools and pipe sections restrained near openings.

Can the draft include pipe installation without entering the shaft?

Yes. Describe the landing access and lifting method. The draft can centre on work from outside the shaft, with opening protection, supported pipe sections and checks before supports are released.

How much does a working in plumbing risers SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.