Comprehensive SWMS for Installing AV Systems in Commercial and Retail Environments

Audio Visual Installation Safe Work Method Statement

2,000+ Australian Businesses Trust OneClickSWMS

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Audio visual installation in commercial shop fitting involves mounting and connecting display screens, projectors, sound systems, and control equipment to create presentation, entertainment, or information display systems in retail stores, corporate offices, conference rooms, and entertainment venues. Installation work encompasses wall and ceiling mounting of heavy screens and projectors, cable routing through concealed pathways, electrical connections coordinated with licensed electricians, integration with building control systems, and commissioning of complete AV systems. This SWMS addresses comprehensive safety requirements for AV installation including work at heights, electrical hazards, manual handling of equipment, working in ceiling voids, and coordination with other trades in accordance with Australian WHS legislation and electrical safety regulations.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Audio visual installation in commercial environments creates sophisticated integrated systems combining visual displays, sound reinforcement, control interfaces, and signal processing equipment. These installations serve diverse purposes from retail digital signage attracting customers and promoting products, to corporate boardroom presentation systems supporting business meetings, conference room installations enabling video conferencing and collaborative work, entertainment venue systems providing concert-quality sound and video, and educational facility installations supporting teaching and learning activities. Each application presents unique technical requirements and corresponding safety considerations for installation personnel. Visual display installation represents a primary component of AV work. Large-format LED displays ranging from 55 to 98 inches dominate corporate and retail applications, with weights from 30kg to over 100kg creating significant manual handling and mounting challenges. Projector installations involve ceiling-mounted units weighing 10-30kg requiring secure suspension capable of supporting equipment weight plus safety factors. Video walls comprising multiple screens in arrays create substantial combined weight requiring engineered mounting systems and precise alignment. Interactive displays including touchscreens and interactive whiteboards integrate display technology with input detection, requiring careful mounting ensuring stable operation under user contact forces. Digital signage includes both standalone displays and window-mounted units viewable from exterior, creating specific installation challenges in active retail environments. Sound system installation encompasses speaker placement, amplifier installation, and acoustic treatment integration. Ceiling-mounted speakers require penetrating ceiling tiles, routing cables through ceiling voids, and securing speakers to structural elements capable of support loads. Wall-mounted speakers involve fixing to wall structure, concealing cables, and achieving specified coverage patterns. Subwoofer installation for low-frequency reinforcement typically positions equipment in concealed locations requiring coordination with architectural finishes. Distributed audio systems common in retail environments distribute sound to multiple zones requiring complex cable routing and zone control installation. Public address and voice evacuation systems in larger venues must meet stringent fire safety requirements including fire-rated cabling and battery backup systems. Cable infrastructure supporting AV installations involves extensive routing of HDMI, network, audio, power, and control cables through building spaces. Concealed cable installation routes cables through ceiling voids, wall cavities, floor ducts, and purpose-built cable trays maintaining separation between low-voltage signal cables and electrical power cables to prevent interference. Proper cable management prevents tripping hazards, maintains fire ratings in penetrations through fire-rated walls, and facilitates future maintenance and upgrades. Installation in ceiling voids creates confined space hazards, exposes workers to insulation fibres and dust, and requires navigation of building services including electrical conduits, HVAC ducts, plumbing, and fire protection piping. Working in these concealed spaces above occupied areas below creates fall-through risks if installers step on unsupported ceiling areas. Electrical coordination forms a critical safety element of AV installation. While low-voltage signal connections may be performed by AV technicians, all electrical power connections must be completed by licensed electricians per Australian electrical safety regulations. AV equipment requires dedicated electrical circuits preventing interference and ensuring adequate power capacity. Installations often involve numerous wall plates, floor boxes, and equipment racks requiring electrical connections. Coordination between AV installers and electricians ensures correct sequencing—structural mounting and cable routing by AV installers precedes electrical connection work. Testing and commissioning involves energising equipment requiring electrical safety procedures including lockout/tagout during installation, verification of correct voltage and polarity before connecting equipment, and RCD protection during commissioning activities. The complexity of modern integrated AV systems, combined with work at heights, manual handling challenges, and electrical hazards, necessitates comprehensive safety planning and coordination across multiple trades to protect workers and ensure quality installations meeting client technical and functional requirements.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Audio visual installation work in commercial environments presents multiple serious safety hazards that have caused significant injuries in the shop fitting and construction industries. Falls from ladders and scaffolding during screen and projector mounting, electric shock during electrical connection work, manual handling injuries from lifting heavy display equipment, and injuries from working in ceiling voids all contribute to incident rates requiring comprehensive safety management. Beyond worker safety, the increasing sophistication of commercial AV systems means installation errors can result in expensive equipment damage, project delays, and client dissatisfaction emphasising importance of proper installation procedures. Work at heights represents the primary safety hazard in AV installation as most equipment mounts at elevated positions. Display screens install at heights from 2 to 4 metres requiring stepladders, platform ladders, or mobile scaffolds for access. Ceiling-mounted projectors may install at heights up to 6 metres in retail spaces with high ceilings requiring scaffolding or elevated work platforms. Ceiling speaker installation involves working from stepladders while performing overhead work including drilling, pulling cables, and securing speakers—this combination of elevated position and overhead work creates particular fall risk. Workers operating from stepladders while handling heavy equipment occupy both hands with equipment preventing handrail grip. Overreaching to position equipment or route cables causes overbalancing. Working near unprotected ceiling openings or building edges during installation near shopfront glazing creates additional fall hazards. Falls from heights between 2-3 metres, common in commercial fit-out work, frequently result in fractures, head injuries, and soft tissue damage requiring hospitalisation and extended recovery periods. Australian WHS regulations classify work at heights above 2 metres as high-risk construction work requiring specific controls and Safe Work Method Statement preparation. Electrical hazards during AV installation create both shock and fire risks. AV equipment requires electrical power connections that must be performed by licensed electricians, but AV installers work in close proximity to electrical equipment and may inadvertently contact energised conductors. Drilling or cutting into walls and ceilings for mounting and cable routing risks striking concealed electrical cables creating shock hazards and potential arc flash injuries. Working with metal mounting brackets, tools, and ladders near electrical equipment increases shock risk if equipment becomes energised through faults. Using portable electrical tools during installation requires RCD protection and proper equipment inspection. AV installations often occur in occupied buildings where existing electrical systems remain energised creating proximity hazards. Fire risks arise from inadequate separation between power and low-voltage cables, creating interference and potential ignition sources, overloading electrical circuits with AV equipment drawing substantial current, and inadequate equipment ventilation causing overheating. Recent electrical safety incidents in the construction industry have resulted in fatalities when workers contacted energised equipment or struck concealed cables, emphasising critical importance of electrical hazard controls and coordination with licensed electricians. Manual handling injuries from lifting heavy AV equipment are common in installation work. Modern large-format displays weigh 30-100kg with awkward dimensions and no integral lifting points. Display mounting requires lifting equipment to installation height, holding in position while securing mounting brackets, and maintaining precise alignment during fixing—often performed by only two installers. Projectors weighing 10-30kg must be held overhead during ceiling mounting while aligning with ceiling brackets and making connections. Speaker installation involves repetitive overhead work creating cumulative shoulder strain. Equipment is often unpacked and positioned in confined shopfront spaces limiting safe body positioning during manual handling. Working from elevated access equipment while handling heavy equipment compounds injury risk as stable footing may be compromised. Back injuries, shoulder strains, and dropped equipment causing foot injuries all result from inadequate manual handling controls. Australian guidelines specify manual handling controls must be implemented when loads exceed safe limits—for most workers, sustained overhead holding of loads exceeding 5kg or manual lifting of loads exceeding 16kg creates significant injury risk requiring mechanical aids or additional personnel. Confined space hazards arise when AV installers work in ceiling voids for cable routing and speaker installation. Ceiling spaces often meet confined space criteria with limited entry and egress through ceiling tiles or access hatches, inadequate ventilation creating dust accumulation and potential airborne fibre exposure, and work requiring awkward postures in cramped conditions. Working above suspended ceilings creates fall-through risk as ceiling grid and tiles are not designed to support human weight. Stepping on unsupported ceiling areas causes falls into occupied spaces below with combined risks from fall itself and impacting furniture, equipment, or people below. Ceiling voids contain numerous hazards including electrical cables, sharp metal edges from ceiling framework, thermal insulation fibres causing skin and respiratory irritation, accumulated dust from building operation, and restricted lighting creating visibility problems. Heat accumulation in ceiling voids particularly in summer months creates heat stress risk during extended work periods. These combined hazards necessitate specific controls including atmospheric testing if conditions suggest contamination, mandatory fall protection using crawl boards or temporary platforms, adequate lighting for all ceiling work, respiratory protection if dust or fibre exposure is significant, and limited work duration in ceiling spaces with mandatory rest breaks. Implementing comprehensive SWMS for AV installation demonstrates regulatory compliance, protects workers from serious injuries, and ensures quality installations meeting technical specifications and client expectations for performance and reliability of commercial AV systems.

Reinforce licensing, insurance, and regulator expectations for Audio Visual Installation Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Falls from Heights During Equipment Mounting

High

AV equipment installation requires working at elevated heights from 2 to 6 metres to mount displays, projectors, and speakers. Workers operate from stepladders, platform ladders, mobile scaffolds, or elevated work platforms while handling heavy equipment occupying both hands. Mounting displays involves positioning equipment at precise heights and alignments while securing brackets requiring both hands, preventing handrail grip. Ceiling projector installation involves overhead work from platforms creating overbalancing risk. Working near unprotected edges during installation in shopfronts or near glazing creates fall hazards. Overreaching to route cables or adjust equipment causes stability loss. Congested work areas in confined retail spaces limit safe positioning of access equipment. Temporary removal of edge protection to allow equipment installation exposes workers to falls.

Consequence: Serious fractures to arms, legs, pelvis, and spine, head injuries including skull fractures and traumatic brain injury, spinal cord injuries potentially causing permanent paralysis, internal organ damage, and fatal injuries from falls at height even from relatively low elevations of 2-4 metres common in commercial fit-outs.

Electric Shock from Electrical Equipment and Concealed Cables

High

AV installation involves work near electrical equipment and energised conductors. Drilling into walls and ceilings for mounting brackets and cable routing risks striking concealed electrical cables creating shock hazards. Contact with energised equipment during installation or commissioning causes electrocution. Using metal ladders and conductive hand tools near electrical equipment increases shock risk if faults energise equipment frames. Inadequate coordination with electricians results in work near energised circuits without proper isolation. Moisture in walls or ceilings increases conductivity. Using portable electrical tools without proper RCD protection creates shock risks. Working in occupied buildings with existing electrical systems energised creates proximity hazards during installation.

Consequence: Electrocution causing cardiac arrest and death, serious burns from electrical arcing, electric shock causing falls from height with secondary injuries, permanent neurological damage from electric shock, and psychological trauma from shock events.

Manual Handling of Heavy Display and Audio Equipment

Medium

Large-format displays weigh 30-100kg with awkward dimensions creating substantial manual handling challenges. Equipment must be lifted to installation height, positioned precisely, and held in place during mounting bracket securing. Projectors weighing 10-30kg require overhead holding during ceiling mounting. Speaker enclosures and amplifiers add additional manual handling requirements. Equipment dimensions and lack of integral handles create awkward grip and unbalanced loads. Working at height while handling equipment limits safe body positioning. Confined shopfront spaces restrict approach paths and body positioning during equipment handling. Repetitive overhead work installing multiple speakers creates cumulative shoulder and upper back strain.

Consequence: Lower back injuries including disc herniation and muscle strains, shoulder injuries and rotator cuff damage from overhead work, hernias from excessive lifting, crush injuries to feet if equipment dropped, and chronic musculoskeletal disorders from repeated heavy manual handling.

Fall Through Ceiling During Cable Routing and Speaker Installation

High

Cable routing and speaker installation in ceiling voids requires accessing above suspended ceilings. Ceiling grid systems and tiles are not designed to support human weight. Stepping on unsupported ceiling areas or weak ceiling tiles causes fall-through into occupied spaces below. Working in confined ceiling voids requires awkward positioning increasing likelihood of misstep. Poor lighting in ceiling spaces reduces visibility of structural supports. Installers may attempt to reach across ceiling spaces without proper support. Ceiling penetrations for services create openings that may not be visible. Falls into spaces below create combined injury from fall itself plus impact with furniture, equipment, or people below.

Consequence: Fractures and soft tissue injuries from falls of 3-4 metres into rooms below, head injuries from impacting furniture or equipment, injuries to building occupants if installers fall onto people, ceiling system damage requiring expensive repairs, and project delays from incident investigations.

Exposure to Dust, Insulation Fibres, and Poor Air Quality in Ceiling Voids

Medium

Working in ceiling voids exposes installers to accumulated dust from building operations, insulation fibres from thermal or acoustic insulation materials, and poor air quality from inadequate ventilation. Drilling into ceilings and walls generates silica dust from concrete or plasterboard dust. Disturbing existing insulation releases fibres into air. Ceiling spaces in older buildings may contain asbestos insulation materials. Inadequate ventilation in confined ceiling voids concentrates airborne contaminants. Extended work periods increase exposure duration. Respiratory irritation from dust and fibres, skin irritation from insulation contact, and eye irritation from airborne particles all result from ceiling void work.

Consequence: Acute respiratory irritation and coughing, skin irritation and dermatitis from insulation fibre contact, eye irritation and conjunctivitis, asbestos exposure if materials are disturbed, and chronic respiratory conditions from repeated dust exposure including potential for silicosis from crystalline silica.

Struck by Falling Equipment During Installation

Medium

Heavy AV equipment positioned at height creates struck-by hazards if mounting fails or equipment is dropped during installation. Display screens weighing 30-100kg falling from mounting height cause catastrophic impact injuries. Projectors, speakers, and mounting hardware falling from ceilings create head injury risks. Inadequate mounting bracket strength, incorrect fixing into substrate, or installation errors cause equipment to fall after installation. Tools and components dropped from height during installation strike workers or public below. Work in operational retail spaces or occupied buildings places people in proximity to overhead work creating public safety risks.

Consequence: Serious head injuries or fatalities if heavy equipment strikes workers or public, fractures and soft tissue injuries from falling components, equipment damage requiring replacement, legal liability for public injuries, and project delays from incident investigations and equipment replacement.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Scaffolding and Elevated Work Platform Access with Fall Protection

Engineering Control

Provide scaffolding with full guardrails or elevated work platforms with edge protection for all AV equipment installation at heights above 2 metres. Select access equipment providing adequate working platform size for two installers plus equipment. Ensure platform height allows work to be performed without overreaching. Provide scissor lifts or boom lifts for high ceiling installations. Eliminate stepladder use for equipment mounting work where both hands must hold equipment—stepladders acceptable only for light tasks such as cable pulling or inspection.

Implementation

1. Assess installation height requirements during planning stage and select appropriate access equipment 2. Provide scaffolding with full guardrails (1000mm height), mid-rails (500mm height), and toe boards for display mounting work 3. Ensure scaffold platform width minimum 600mm providing adequate space for two installers working together 4. Use mobile elevating work platforms (scissor lifts) for ceiling projector installation allowing precise height positioning 5. For installations above 4 metres or complex access requirements, use boom-type EWPs providing horizontal reach capability 6. Verify all installers using EWPs hold current high-risk work licences for equipment class 7. Ensure EWP platforms have edge protection preventing falls—never work from EWP without edge protection 8. Position access equipment before lifting equipment to height—never carry heavy equipment while climbing access equipment 9. Maintain three points of contact when using ladders for light tasks

Cable Detection and Electrical Coordination Procedures

Elimination

Eliminate electrical shock risks by detecting and marking concealed electrical cables before drilling or cutting. Use electronic cable detectors to identify electrical cable locations in walls and ceilings. Coordinate all work with licensed electricians ensuring electrical systems properly isolated before AV installation commences. Implement electrical isolation and lockout procedures for work near energised equipment. Engage electricians for all electrical power connections to AV equipment.

Implementation

1. Use calibrated electronic cable detector to scan all wall and ceiling areas before drilling for mounts or cable routing 2. Mark detected cable locations clearly on surface using tape or marker 3. Maintain minimum 150mm clearance from detected cables when drilling or routing cables 4. If drilling cannot avoid cable locations, coordinate with electrician to verify cable identity and obtain isolation 5. Engage licensed electrician for all electrical power connections to displays, projectors, amplifiers, and control equipment 6. Implement electrical isolation using lockout/tagout procedures when working on energised circuits 7. Verify all portable electrical tools used during installation connect through 30mA RCD protection 8. Conduct pre-start electrical safety briefing covering shock hazards and emergency response procedures

Team Lifting and Mechanical Handling for Heavy Equipment

Engineering Control

Implement mandatory team lifting for all displays exceeding 30kg and projectors exceeding 15kg. Provide mechanical lifting aids including equipment hoists, panel lifters, and overhead crane systems for heavy installations. Plan installation sequences positioning equipment and materials to minimise manual handling distances. Use trolleys and dollies for horizontal equipment transport. Brief teams on lift coordination, hand signals, and communication before handling heavy equipment.

Implementation

1. Assess equipment weights during planning stage identifying items requiring team lifting or mechanical aids 2. Assign minimum three persons for display mounting—two to position and hold equipment, one to secure mounting hardware 3. Provide material hoist or goods lift for multi-level installations transporting equipment to working level 4. Use wheeled trolleys or A-frame carts for horizontal transport from delivery point to installation location 5. Position equipment staging areas at base of scaffolding or access equipment minimising carrying distances 6. Brief teams before each equipment lift covering roles, hand signals, and emergency procedures 7. For displays exceeding 60kg, use mechanical panel lifters providing powered height adjustment 8. Never attempt single-person installation of wall-mounted displays—always use team approach 9. Take regular breaks during repetitive speaker installation preventing cumulative fatigue

Crawl Boards and Ceiling Work Platforms

Engineering Control

Provide crawl boards or temporary platforms for all work above suspended ceilings distributing worker weight across ceiling grid structure. Prohibit stepping directly on ceiling tiles or unsupported ceiling areas. Install temporary decking over ceiling grid for extensive ceiling work providing continuous safe working surface. Ensure adequate lighting in ceiling voids for clear visibility of structural supports and hazards.

Implementation

1. Provide crawl boards minimum 600mm wide by 2.4 metres long rated for 150kg load 2. Position crawl boards across ceiling grid joists distributing load to multiple structural members 3. Never step on ceiling tiles—always position crawl boards before accessing ceiling void 4. For extensive ceiling work, install temporary plywood decking over ceiling grid providing continuous safe work surface 5. Use portable LED work lights providing adequate illumination in ceiling voids—minimum 300 lux at work surface 6. Inspect ceiling grid structure before working above confirming structural adequacy and identifying damaged areas 7. Mark ceiling penetrations and openings clearly preventing missteps in confined spaces 8. Limit ceiling void work duration to maximum 1 hour periods with mandatory rest breaks 9. Provide two-way communication for workers in ceiling voids maintaining contact with person at ground level

Respiratory Protection and Dust Control for Ceiling Work

Administrative Control

Provide respiratory protection for work in dusty ceiling voids and when drilling generates dust. Use P2 particulate respirators protecting against dust and insulation fibres. Implement dust control measures including on-tool dust extraction for drilling, wet cutting methods where applicable, and ventilation of ceiling spaces. Conduct pre-work asbestos assessment for work in older buildings.

Implementation

1. Provide P2 disposable respirators (AS/NZS 1716) for all workers accessing ceiling voids or conducting drilling work 2. Ensure respirators properly fitted—conduct fit testing for workers who will use respirators regularly 3. Use on-tool dust extraction attachments for drilling into concrete or masonry reducing airborne dust 4. Ventilate ceiling voids before and during work using portable fans positioned to create airflow 5. For buildings constructed before 1990, conduct asbestos survey before disturbing ceiling materials 6. If asbestos materials present, engage licensed asbestos removalist—do not disturb asbestos-containing materials 7. Provide barrier cream or protective gloves preventing skin contact with insulation fibres 8. Brief workers on insulation hazards and importance of washing exposed skin after ceiling work

Secure Equipment Mounting and Load Verification

Engineering Control

Ensure all equipment mounting systems designed and installed to support equipment weight plus safety factors. Verify mounting surface structural adequacy before installation. Use appropriate fixings for substrate type achieving specified pull-out resistance. Conduct load testing of mounting systems before equipment installation. Provide safety cables as secondary support preventing equipment fall if primary mounting fails.

Implementation

1. Verify wall or ceiling structure capable of supporting equipment weight before installation—engage structural engineer if doubt exists 2. Use mounting brackets specifically designed for equipment model and weight 3. Install fixings achieving minimum 4:1 safety factor above equipment weight—typically 200kg capacity for 50kg display 4. For concrete or masonry substrates, use expansion anchors or chemical anchors achieving specified pull-out resistance 5. For timber framing, ensure fixings penetrate minimum 35mm into solid timber studs or joists 6. For ceiling-mounted projectors, fix to structural ceiling joists, not suspended ceiling grid 7. Install safety cables as secondary suspension connecting equipment to independent structural point 8. Test mounting system before placing equipment by applying load equal to equipment weight and verifying no movement 9. Document mounting methods and load capacities for client records and future maintenance

Public Exclusion Zones During Installation in Operational Areas

Administrative Control

Establish exclusion zones preventing public or building occupant access to areas where equipment installation, overhead work, or cable pulling occurs. Use physical barriers that cannot be easily moved. Install warning signage at barriers. Coordinate with building management and security. Schedule high-risk work outside operating hours where practicable reducing public exposure.

Implementation

1. Install temporary barriers creating minimum 3-metre exclusion zone around all overhead installation work 2. Use solid barriers or fencing preventing public access—witches hats and tape are insufficient in occupied buildings 3. Install signage warning of construction work and overhead hazards in plain language 4. Coordinate with building security ensuring barriers remain in place throughout work period 5. Schedule equipment installation and heavy lifting outside building operating hours minimising public exposure 6. Assign workers to monitor public safety during work in operational areas briefing on procedures if public approaches work area 7. Wear high-visibility vests allowing clear distinction between workers and building occupants 8. Remove exclusion barriers only after installation complete and area made safe

Personal protective equipment

Requirement: Medium impact rated per AS/NZS 1337, clear lens with side protection

When: During all drilling, cutting, working overhead, and when working in ceiling voids with overhead hazards

Requirement: Category 1 impact protection per AS/NZS 2210.3, slip-resistant sole

When: Throughout all installation activities providing foot protection from dropped equipment and tools

Requirement: P2 class per AS/NZS 1716, disposable or reusable

When: When working in dusty ceiling voids, during drilling creating dust, or when insulation fibres present

Requirement: Level 2-3 cut resistance per AS/NZS 2161.4

When: When handling equipment with sharp edges, cutting cable, or working with metal framing in ceiling voids

Requirement: Class D day/night per AS/NZS 1906.4

When: When working in areas with public access, operational retail environments, or where visibility to others required

Requirement: Class 2-3 per AS/NZS 1270

When: During extended drilling operations, when working near noisy building equipment

Requirement: Type 1 per AS/NZS 1801

When: When working in areas with overhead work by other trades or potential for falling objects

Inspections & checks

Before work starts

  • Review installation plans and equipment specifications confirming mounting locations, cable routes, and power requirements
  • Verify all AV equipment delivered matches specifications including models, quantities, and accessories
  • Inspect equipment for shipping damage before unpacking and installation
  • Confirm mounting surfaces are structurally adequate—engage structural engineer if substrate capacity uncertain
  • Verify electrical supply locations align with equipment power requirements
  • Check access equipment appropriate for installation height and platform size adequate for task
  • Confirm ceiling void access points adequate for cable routing and speaker installation
  • Verify portable cable detector is calibrated and operational for locating concealed electrical cables
  • Ensure all required PPE available including safety glasses, respirators, cut-resistant gloves, and safety boots
  • If working in older buildings, confirm asbestos survey completed for areas to be disturbed

During work

  • Monitor workers on elevated access equipment ensuring three points of contact maintained and no overreaching
  • Verify cable detection conducted before any drilling or cutting into walls or ceilings
  • Check team lifting protocols followed for heavy equipment with adequate personnel assigned
  • Monitor crawl board positioning in ceiling voids—ensure workers not stepping on unsupported ceiling areas
  • Verify electrical work performed by licensed electrician only and coordination maintained with AV installers
  • Check mounting bracket installation using correct fixings for substrate achieving specified pull-out resistance
  • Monitor public exclusion zones remain intact with barriers preventing access to overhead work areas
  • Verify adequate ventilation and lighting in ceiling voids during cable routing work
  • Check workers use appropriate PPE for tasks—respirators when required, safety glasses throughout, gloves as needed
  • Monitor for signs of worker fatigue during extended ceiling work—enforce mandatory rest breaks

After work

  • Inspect all equipment mounting systems confirming secure attachment with no movement when tested
  • Verify safety cables installed on all ceiling-mounted equipment providing secondary suspension
  • Test equipment operation confirming displays, projectors, and audio systems function correctly
  • Check all cables properly secured and routed preventing trip hazards or damage from traffic
  • Verify fire-rated penetrations properly sealed maintaining building fire rating where cables pass through fire walls
  • Confirm electrical connections completed by licensed electrician with compliance certificates issued
  • Test all system functions including inputs, switching, volume controls, and automated sequences
  • Clean all equipment removing installation debris, fingerprints, and packaging materials
  • Remove all tools, access equipment, and construction materials from installation areas
  • Document installation including photographs, cable routing diagrams, and equipment serial numbers
  • Provide client with system documentation including operating instructions and warranty information

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready

Site Survey and Installation Planning

Conduct comprehensive site survey before equipment delivery assessing installation locations, mounting surface conditions, cable routing paths, electrical supply availability, and access requirements. Measure exact mounting positions confirming dimensions match design documentation. Check ceiling heights and viewing angles for displays and projectors. Assess structural adequacy of mounting surfaces—masonry, concrete, timber framing, or steel structure. Identify concealed services including electrical cables, plumbing, HVAC ducts that may affect mounting or cable routing. Verify electrical supply locations provide required power capacity and voltage. Check if existing electrical circuits can accommodate additional AV equipment load or if new dedicated circuits required. Identify ceiling void access points for cable routing. Assess access equipment requirements based on installation heights and space constraints. Plan cable routing paths selecting routes minimising cable lengths, avoiding conflict with other services, and maintaining aesthetic appearance. Consider cable protection requirements for areas where damage risk exists. Coordinate with building management regarding work schedules, access restrictions, noise limitations, and any building-specific safety requirements. Plan material delivery timing ensuring equipment arrival coordinates with installation schedule and adequate secure storage available. Brief installation team on site conditions, specific hazards, and installation sequence.

Safety considerations

Use stable ladder or access equipment during site survey when inspecting ceiling areas or high mounting positions. Verify no energised electrical equipment in areas being surveyed—coordinate with electrician if access near electrical systems required. Check ceiling void conditions for hazards including poor lighting, accumulated dust, insulation materials, and structural obstructions. Identify confined space hazards and implement entry controls if required. Plan safe access and egress routes for all installation work areas.

Access Equipment Setup and Pre-Installation Preparation

Position and set up access equipment providing safe elevated work platforms for equipment mounting. For display installation at 2-3 metre heights, set up scaffolding with full guardrails, mid-rails, and toe boards providing stable work platform. Ensure scaffold platform width adequate for two installers plus equipment—minimum 600mm preferred width. For ceiling projector installation or work above 3 metres, position scissor lift or boom-type elevated work platform ensuring all stabilisers deployed and level verification completed before use. Verify all workers using EWPs hold current high-risk work licences appropriate for equipment class. Position equipment staging areas at scaffold base or adjacent to EWP reducing manual handling distances during equipment positioning. Establish work area boundaries using barriers preventing public or worker access to areas beneath overhead work. Install warning signage at barriers. Set up material hoists or goods lifts for multi-level installations transporting equipment and materials to working levels safely. Ensure adequate task lighting in all work areas particularly in ceiling voids where ambient lighting may be inadequate. Position portable work lights providing minimum 300 lux illumination. Prepare all mounting hardware, fixings, and tools before commencing work reducing time at height.

Safety considerations

Inspect scaffolding before use confirming guardrails secure, platform boards properly positioned without gaps, and access ladder properly attached. For EWPs, complete pre-start inspection including emergency lowering function test, outrigger deployment verification, and platform controls operation check. Ensure stable ground conditions under EWP outriggers—use outrigger mats if ground is soft or uneven. Position barriers minimum 3 metres from base of elevated work to account for potential falling objects. Verify exclusion zone maintained throughout installation work. Do not position scaffolding or EWPs over unprotected floor openings or edges.

Mounting Bracket Installation and Surface Preparation

Install mounting brackets for displays, projectors, and speakers ensuring secure fixing to structural elements. For display wall mounting, mark bracket positions using level and measuring tools achieving specified heights and horizontal alignment. Verify mounting surface is structural—locate studs or structural framing behind finished surfaces using electronic stud finder. Mark fixing positions on bracket corresponding to structural support locations. Drill pilot holes through finished surface into structural substrate using appropriate drill bit for material—masonry bits for concrete or brick, wood bits for timber framing. For masonry substrates, drill holes minimum 10mm deeper than fixing penetration allowing dust clearance. Clean holes using vacuum or compressed air. Install expansion anchors or chemical anchors following manufacturer instructions. For ceiling projector mounting, locate structural ceiling joists or beams capable of supporting projector weight. Never mount projectors to suspended ceiling grid. Install mounting plate or bracket to structural ceiling elements using appropriate fixings achieving minimum 4:1 safety factor. For ceiling speaker installation in suspended ceiling, install speaker mounting brackets bearing on ceiling grid but with safety cables connecting speakers to structural ceiling above preventing fall if grid fails. Verify all fixings achieve specified pull-out resistance by testing with applied load before mounting equipment.

Safety considerations

Use electronic cable detector scanning all drilling areas before drilling confirming no concealed electrical cables in drilling path. Maintain minimum 150mm clearance from any detected cables. Wear safety glasses with side shields during all drilling operations. Use hearing protection for extended masonry drilling. Ensure stable body position when drilling from elevated access equipment—never lean beyond platform edge. For overhead drilling, use dust containment attachments preventing debris falling into eyes. Verify RCD protection on all portable power tools. Do not overload electrical circuits with multiple power tools operating simultaneously.

Cable Routing and Infrastructure Installation

Route cables from equipment locations to connection points using concealed paths through walls, ceiling voids, and cable management systems. For ceiling void cable routing, position crawl boards before accessing above suspended ceiling distributing weight across ceiling grid structure. Never step directly on ceiling tiles. Use portable work lights providing adequate illumination in ceiling voids. Pull cables through existing conduits or cable trays where available. For new cable runs, install cable support systems at maximum 1.5 metre intervals preventing cable sag. Maintain separation between low-voltage AV cables and electrical power cables—minimum 300mm separation preventing electromagnetic interference. Group cables by function—HDMI cables together, audio cables together, network cables together. Label cables at both ends identifying source and destination using durable labels. Protect cables where they pass through metal framing using grommets preventing abrasion damage. Install fire-rated penetration seals where cables pass through fire-rated walls maintaining building fire compartmentation. Verify adequate cable slack at equipment locations allowing future equipment removal and reconnection. Secure cables using tie-wraps or velcro straps avoiding over-tightening that damages cable insulation. For floor boxes or wall plates, route cables to appropriate termination points. Coordinate with electrician regarding power cable installation to equipment locations—all electrical power connections must be performed by licensed electrician.

Safety considerations

Ensure adequate respiratory protection when working in dusty ceiling voids—use P2 respirators. Maintain communication with person at ground level when working in ceiling spaces. Limit ceiling void work duration to maximum 1 hour periods with mandatory rest breaks in ventilated areas. Do not work alone in ceiling voids—maintain two-way communication throughout. Use crawl boards or temporary platforms preventing fall through ceiling. Ensure adequate lighting preventing missteps in confined ceiling spaces. If asbestos materials encountered, stop work immediately and report—do not disturb asbestos-containing materials. Wear long sleeves and barrier cream preventing skin contact with insulation fibres. Wash exposed skin after completing ceiling work.

Equipment Mounting and Securing

Mount AV equipment to installed brackets using team lifting protocols and proper manual handling techniques. For wall-mounted displays, assign minimum three persons—two to position and hold display, one to secure mounting hardware. Lift display from packaging using team lift with clear communication and coordinated movement. Position display at mounting height aligning with installed bracket. One installer guides display position while second installer engages mounting mechanism securing display to bracket. Third installer verifies security and installs locking screws preventing accidental disengagement. Never release display weight until mounting confirmed secure and tested. For ceiling-mounted projectors, position EWP platform allowing installer to work at comfortable height with projector position at chest level rather than overhead. Lift projector to platform using hoist or manual lifting with assistance. Attach projector to mounting bracket following manufacturer instructions. Install safety cable connecting projector to independent structural point providing secondary suspension. For ceiling speakers, position speaker in ceiling tile opening or mounting bracket, connect speaker cables, and secure speaker using appropriate mounting method. Install safety cables on all speakers preventing fall if primary mounting fails. Test all mounted equipment for security by applying moderate hand pressure confirming no movement.

Safety considerations

Never attempt single-person mounting of displays exceeding 30kg—always use team approach. Ensure all installers understand lift plan and communication signals before handling equipment. Maintain stable footing on access equipment during equipment positioning—never lean beyond platform edge. Wear cut-resistant gloves when handling equipment with sharp edges or metal frames. If display or equipment is dropped, evacuate area immediately and assess for damage—never attempt to catch falling equipment. Verify safety cables installed on all ceiling-mounted equipment before final securing. Test mounting security before removing temporary support. Do not work beneath equipment being mounted until secure mounting confirmed.

Electrical Connections and System Integration

Coordinate electrical connection work with licensed electrician ensuring all power connections to AV equipment comply with Australian electrical safety regulations. AV installers prepare for electrical work by positioning cables to connection points, installing wall plates or floor boxes for power and signal connections, and verifying all low-voltage signal connections ready for integration after power available. Licensed electrician performs all electrical power connections including installing new circuits if required for AV equipment, making final connections to displays, projectors, amplifiers, and control systems, installing and testing RCD protection devices, verifying correct voltage and polarity at all equipment power points, and issuing electrical compliance certificates documenting installation compliance. AV installers make low-voltage signal connections including HDMI cables to displays and projectors, audio cables to speakers and amplifiers, network cables to control systems and streaming devices, USB and control cables to interactive equipment, and integration with building automation systems if required. Configure equipment settings including display resolution and picture settings, audio levels and equalization, control system programming, and automated sequence operation. Test all system functions verifying displays show correct inputs, audio systems produce clear sound from all speakers, control interfaces operate all equipment functions, and automated sequences execute correctly.

Safety considerations

Verify all electrical power isolated using lockout procedures before making any connections to equipment with exposed terminals. Confirm electrician has completed and tested all power connections before energising AV equipment. Use RCD-protected power supply for all portable equipment during commissioning. Do not work on energised equipment—implement isolation procedures for any troubleshooting or modification work. Verify correct voltage before connecting equipment—wrong voltage damages equipment and creates fire risks. Label all cables clearly identifying voltage and function preventing accidental cross-connection. If equipment shows signs of electrical faults including burning smells, sparking, or unusual heat, isolate power immediately and investigate before proceeding.

System Testing, Documentation, and Client Handover

Conduct comprehensive system testing verifying all equipment operates correctly and meets design specifications. Test each display confirming power-on function, input switching from all sources, image quality and resolution settings, and audio output if display has internal speakers. Test projectors confirming image focus and alignment, keystone correction, lamp operation, and cooling fan function. Test audio systems including individual speaker operation verifying all speakers produce sound, audio level consistency across zones, amplifier power and protection circuits, and subwoofer output if present. Test control systems confirming all programmed functions operate correctly, interface responsiveness, preset recall, and automated sequence execution. Demonstrate system operation to client covering power-on/off procedures, source selection, volume control, preset operation, and troubleshooting for common issues. Provide comprehensive documentation including system schematic showing all equipment locations and cable routes, equipment serial numbers and warranty information, operating instructions for all equipment, maintenance recommendations including lamp replacement schedules for projectors, and emergency contact information for technical support. Conduct final inspection of installation ensuring all cables properly secured and concealed, mounting hardware tight and secure, equipment surfaces clean without fingerprints or marks, and surrounding areas cleaned removing all construction debris. Document installation with photographs showing equipment installation, cable management, mounting details, and completed system. Obtain client sign-off confirming installation completion and satisfaction with system operation.

Safety considerations

Ensure all temporary barriers and work area protection removed only after installation completion and area verified safe. Verify no trip hazards from cables in areas accessible to public or building occupants. Check all equipment securely mounted with safety cables installed preventing equipment fall. Educate client on safe equipment operation including not exceeding volume limits that may damage speakers, not attempting equipment removal or modification without qualified technician, and maintaining adequate ventilation around equipment preventing overheating. Provide emergency shutdown procedures if equipment malfunction occurs. Remove all tools and construction equipment preventing public access to potentially dangerous items.

Frequently asked questions

What qualifications and licences are required for audio visual installation work in commercial buildings?

Audio visual installation in commercial buildings requires specific qualifications and licences ensuring worker competency and legal compliance. Workers must hold Construction Induction Card (White Card) for any work on construction sites. While no specific national AV installation trade qualification is mandatory, competency can be demonstrated through Certificate III in Live Production and Technical Services, Certificate IV in Audio Visual Technology, or equivalent trade qualifications combined with manufacturer-specific training for equipment being installed. Workers operating elevated work platforms must hold high-risk work licences specific to equipment class—WP licence for boom-type EWPs, WP licence for scissor lifts depending on platform height. If installation involves working in confined spaces including ceiling voids meeting confined space criteria, workers require confined space entry training. All electrical work must be performed by licensed electricians holding appropriate electrical licence for jurisdiction—AV installers cannot make electrical power connections, install power points, or work on electrical circuits. Cable installation including low-voltage AV cabling may be performed by qualified AV technicians but must comply with AS/CA S009 for structured cabling installations. Asbestos awareness training is required for workers in buildings constructed before 1990 where asbestos materials may be encountered. First aid training should be available on site with minimum one trained first aider per installation crew. Employers must verify all qualifications and licences before assigning work, maintain training records, and provide task-specific training on equipment operation, safe work procedures, and SWMS requirements. Many commercial clients require additional qualifications such as specific manufacturer certifications for installed equipment brands ensuring competent installation and maintaining equipment warranties. Ongoing professional development in AV technology keeps installers current with rapidly evolving equipment and integration methods.

How should AV installers coordinate with electricians to maintain electrical safety during installation?

Electrical safety coordination between AV installers and electricians is critical as installations involve proximity to electrical equipment and require clear role definitions. Planning coordination begins with joint site review identifying electrical work scope, power supply locations, circuit capacities, and coordination points between trades. Establish clear responsibility boundaries with electricians performing all electrical power work including installing new circuits, making connections to equipment power points, testing and tagging electrical installations, and issuing compliance certificates, while AV installers prepare for electrical work by positioning cables to connection points, installing wall plates and floor boxes, making all low-voltage signal connections, and configuring equipment after power available. Scheduling coordination sequences work with AV installers completing mounting bracket installation and cable routing before electrical work commences, electricians then making power connections to prepared equipment locations, and AV installers completing system integration and testing after power verified safe. Communication protocols include daily coordination meetings discussing work sequences and any conflicts, exchanging contact details for immediate communication if issues arise, and establishing procedures if either trade encounters hazards affecting the other. Safety protocols require cable detection before any drilling or cutting with both trades using cable detectors confirming no concealed electrical cables in working paths, electrical isolation using lockout/tagout when working on energised circuits with proper communication of isolation status, RCD protection on all portable electrical equipment used during installation, and verification of correct voltage before connecting AV equipment preventing damage from incorrect power connections. Documentation requirements include electricians providing circuit diagrams showing power connections to AV equipment, compliance certificates for electrical installations, and testing records for all circuits. AV installers maintain cable routing diagrams, equipment connection lists, and system documentation. Both trades should participate in pre-start meetings reviewing electrical hazards and emergency procedures ensuring all workers understand electrical safety requirements and their role in maintaining safe working conditions. If conflicts arise during installation such as insufficient electrical capacity, circuit faults, or installation errors, stop work and conduct joint investigation resolving issues before proceeding prevents equipment damage and safety incidents.

What are the key differences in safety requirements between installing AV equipment in new construction versus occupied buildings?

AV installation in occupied buildings creates substantially different and more complex safety challenges compared to new construction requiring additional controls and procedures. Public safety considerations in occupied buildings require comprehensive exclusion zones with substantial physical barriers preventing public access to work areas, barriers designed to prevent climbing particularly where children may be present, and installation of clear signage warning of construction hazards. Work scheduling should occur outside operating hours where practicable minimising public exposure to overhead work and noise. Security coordination involves obtaining building access cards and security clearance, signing in/out with security enabling emergency roll call, and coordinating work timing with building operations. In new construction these public safety issues generally do not exist as sites are closed to public. Electrical safety differs substantially as new construction typically has power isolated to work areas with temporary construction power used, while occupied buildings have existing electrical systems energised creating proximity hazards requiring strict isolation procedures, cable detection before any drilling or cutting, and coordination with building electrical maintenance staff. Fire safety systems in occupied buildings remain operational requiring hot work permits for any activities creating ignition sources, prohibition against disabling smoke detectors or interfering with sprinkler systems, and maintaining clear access to fire exits and emergency equipment. New construction fire systems are typically not yet operational. Noise and dust control are critical in occupied buildings limiting high-noise activities to specified hours, using dust containment measures preventing contamination of occupied areas, and scheduling dust-generating work outside operating hours. Building operations are not affected by construction noise and dust in new buildings. Access and logistics differ with occupied buildings requiring material deliveries coordinated with building management, use of service elevators during specified hours, designated material storage areas, and restricted access routes avoiding public areas. New construction sites offer unrestricted access and material handling. Working hours in occupied buildings are often restricted to evenings, nights, or weekends increasing fatigue risks requiring fatigue management procedures, adequate lighting in all work areas, and potentially security presence during after-hours work. New construction typically occurs during standard working hours. Insurance and liability considerations are elevated in occupied buildings with potential for property damage to tenant equipment and furnishings requiring protective coverings and care, third-party injury risks if public enters work areas despite barriers, and business interruption risks if building operations are affected. These combined factors require more extensive safety planning, stricter control implementation, and comprehensive coordination for occupied building installations compared to new construction work.

What specific mounting and structural considerations apply to large format displays weighing over 50kg?

Heavy display mounting requires rigorous structural verification and engineered mounting systems ensuring safe installation preventing catastrophic equipment failure. Structural assessment begins with identifying mounting surface type and load-bearing capacity—concrete or masonry walls generally provide adequate strength, timber-framed walls require locating solid framing members, steel-framed walls need connection to structural steel elements, and plasterboard-only walls are unsuitable for heavy displays requiring installation of structural backing. For displays exceeding 50kg, engage structural engineer to verify wall or ceiling capacity particularly if substrate composition is uncertain or if existing structural elements show signs of degradation. Mounting bracket selection must use commercial-grade brackets specifically rated for display weight and size with minimum 4:1 safety factor—if display weighs 60kg, bracket system must be rated minimum 240kg capacity. Verify bracket design suits display mounting pattern (VESA standard patterns) and provides adequate adjustment range for final positioning. Fixing method depends on substrate with concrete or masonry requiring expansion anchors or chemical anchors achieving specified pull-out resistance typically minimum 200kg per fixing point, timber framing requiring fixings penetrating minimum 35mm into solid timber studs with multiple fixings distributing load across several studs, and steel framing requiring appropriate self-drilling screws or bolted connections to structural steel members. Installation procedures for heavy displays mandate minimum three-person team with two installers positioning and holding display while third installer secures mounting hardware, mechanical lifting aids such as panel lifters providing powered height adjustment for displays exceeding 60kg, and progressive securing starting with top mounting points before releasing manual support. Safety systems include installing safety cables or chains as secondary support connecting display to independent structural point separate from main mounting, using anti-tip straps preventing display tipping if mounting partially fails, and installing seismic restraints in earthquake-prone areas. Testing requirements include loading mounting system before installing display by applying weight equal to display mass and verifying no movement or fixing slippage, monitoring mounting points for first 24 hours after installation checking for any movement or settling, and periodic re-inspection particularly in high-vibration environments such as retail areas with heavy foot traffic. Documentation should record substrate type, fixing method, bracket specifications, and load testing results for future maintenance and liability protection. Warranty considerations require following manufacturer mounting instructions explicitly as deviations void equipment warranties, using only approved brackets and mounting hardware, and maintaining documentation of installation methods.

How should AV installers manage cable routing to maintain fire ratings and comply with building fire safety requirements?

Cable routing in commercial buildings must maintain fire compartmentation integrity preventing fire spread through cable penetrations while providing proper cable support and protection. Fire-rated wall penetrations require identifying all fire-rated walls, smoke barriers, and fire compartment boundaries before commencing cable routing—building plans show fire-rated elements but site verification ensures accuracy. When cables must pass through fire-rated walls, install approved fire-rated penetration seals maintaining wall fire rating—intumescent seals, fire-rated caulk, or mechanical fire stop systems appropriate for cable quantity and types. Seal manufacturer specifications must be followed exactly as improper installation negates fire rating. Group cables together before penetrating walls minimising number of penetrations and simplifying sealing. Never leave unsealed penetrations as this creates fire spread paths violating building codes. Fire-rated ceiling requirements recognise ceiling voids often form part of return air pathways requiring plenum-rated cables that produce minimal smoke and toxic gases when burned. AS/CA S009 specifies cable types for different applications—CMR (riser) rated cables minimum for vertical cable runs, CMP (plenum) rated cables for installation in return air pathways, and fire-rated cables for specific high-risk applications. Check local regulations as requirements vary by jurisdiction. Cable support systems must comply with building codes typically requiring cable support at maximum 1.5 metre intervals preventing cable sag, using cable trays or J-hooks rated for cable mass, and maintaining separation from electrical power cables preventing electromagnetic interference and fire risk. Documentation requirements include recording locations of all fire-rated penetrations with photographs showing penetration details before and after sealing, maintaining certificates for fire-rated sealing products demonstrating compliance, and updating building fire safety documentation showing cable penetration locations. Inspection and maintenance require periodic inspection of fire seals checking for damage, degradation, or separation, particularly after any building modifications or additional cable installations, and re-sealing if integrity is compromised. Building authorities can require fire seal testing during occupancy inspections with non-compliant installations requiring rectification before occupation certificates are issued. Penalties for non-compliant installations include building notices requiring remediation, fines for building code violations, and potential prosecution if fire incidents occur and non-compliant cable installations contributed to fire spread. The critical importance of fire safety makes proper cable routing and penetration sealing an essential aspect of commercial AV installation requiring knowledge of building codes, proper materials, and rigorous installation practices.

Related SWMS documents

Browse all documents

shop-fitting

Aluminium Window Door Frame Installation Safe Work Method Statement

Comprehensive SWMS for installing aluminium window and door frames including shopfronts, internal partitions, and commercial entrances with manual handling and glass safety controls.

View document

shop-fitting

Awnings Blinds Curtains Installation Safe Work Method Statement

Comprehensive SWMS for installing commercial awnings, blinds, and curtain systems including external awnings, motorised blinds, and heavy commercial curtains with work at heights and fixing safety controls.

View document

shop-fitting

Cabinet Installation Safe Work Method Statement

Comprehensive SWMS for installing retail display cabinets, storage units, reception desks, and commercial joinery in shop fitting projects including manual handling controls and coordination protocols.

View document

shop-fitting

Glass Whiteboard Installation Safe Work Method Statement

Comprehensive SWMS for installing glass whiteboards and writable glass surfaces in office fit-outs including glass handling procedures, wall fixing methods, and elevated work controls.

View document

shop-fitting

Glazing Safe Work Method Statement

Comprehensive SWMS for shopfront glazing and internal glass partition installation in shop fitting including glass handling, framing systems, and structural glass installation controls.

View document

shop-fitting

Handrail Installation Safe Work Method Statement

Comprehensive SWMS for installing handrails and balustrades in shop fitting including wall-mounted handrails, glass balustrades, metal railing systems, and fall protection controls.

View document
Trusted by 1,500+ Australian construction teams

Audio Visual Installation SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.