Comprehensive SWMS for Installing Display Cabinets, Storage Units, and Commercial Joinery in Retail and Commercial Environments

Cabinet Installation Safe Work Method Statement

2,000+ Australian Businesses Trust OneClickSWMS

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Cabinet installation in shop fitting environments involves the precise measurement, positioning, and securing of retail display cabinets, storage units, reception desks, point-of-sale fixtures, and commercial joinery systems within operational or soon-to-be-operational retail and commercial premises. This specialised work occurs in shopping centres, retail stores, offices, medical practices, hospitality venues, and commercial facilities where custom cabinetry forms an essential component of the business presentation and functionality. Shop fitting cabinet installers must coordinate with multiple trades, work within tight timeframes, manage heavy and often custom-built units in confined spaces, and maintain high aesthetic standards while operating near the public. This SWMS addresses the specific safety requirements for cabinet installation in shop fitting projects in accordance with Australian WHS legislation, providing detailed hazard controls, inspection procedures, and step-by-step installation methods for retail and commercial environments.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Cabinet installation in shop fitting projects encompasses the specialised work of installing custom-designed and manufactured cabinetry systems within retail and commercial premises. This work includes retail display cabinets with glass fronts and internal lighting, point-of-sale counters integrating cash registers and payment systems, reception desks forming the focal point of business entrances, storage units concealing stock and equipment, shelving systems for product display, and specialist joinery for specific retail functions such as pharmacy dispensaries or jewellery displays. Retail display cabinets represent highly specialised installations requiring precision alignment, secure wall fixing for units that may be fully glazed, integration of electrical services for internal LED lighting, and coordination with security systems for locking mechanisms. These cabinets often feature toughened or laminated glass requiring careful handling and precise installation tolerances. Wall-mounted display cabinets must be secured to structural framing capable of supporting substantial loads, particularly when fully stocked with merchandise. Free-standing display cabinets require stable floor fixing and often incorporate anti-tip devices to prevent customer injury. Point-of-sale installations involve complex joinery incorporating electrical outlets for registers and EFTPOS terminals, cable management systems for IT equipment, drawer systems for cash handling, and surfaces resistant to high-frequency use and cleaning. These installations occur at critical business locations and often require after-hours installation to avoid trading disruption. Reception desk installations similarly require integration of multiple services including data cabling, telephone systems, under-desk electrical outlets, and often architectural features such as logo panels or feature lighting. Shop fitting cabinet work differs substantially from residential cabinetry in several key aspects. Work typically occurs in operational buildings with customer traffic requiring physical barriers and exclusion zones. Time constraints are more severe with retail clients demanding rapid turnaround to minimise lost trading time. Access restrictions apply with limited loading dock availability and designated access routes through shopping centres. Custom cabinetry is often manufactured to exacting specifications with limited ability to modify on-site, requiring precise measurement verification. Materials tend toward commercial-grade products including melamine-faced board, high-pressure laminates, and engineered stone, each with specific handling and installation requirements. The work frequency involves multiple small to medium installations across different sites rather than single large residential projects, requiring efficient logistics and workforce coordination.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Cabinet installation in shop fitting environments presents acute manual handling risks that account for the majority of workers' compensation claims in the fit-out sector. Retail display cabinets weighing 40-80kg, reception desks exceeding 100kg in sections, and stone-topped point-of-sale counters present extreme manual handling demands in confined retail spaces with limited mechanical assistance options. The combination of load weight, awkward access through shopping centre corridors and service lifts, time pressure to complete installations outside trading hours, and precision positioning requirements creates conditions for severe musculoskeletal injury. Lower back injuries from lifting heavy units, shoulder strains from holding cabinets during fixing, and knee damage from prolonged awkward postures during installation work represent the most common injury types requiring extended recovery periods. Australian WHS legislation specifically addresses manual handling risks through the Work Health and Safety Regulation 2011 which requires persons conducting a business or undertaking to manage risks to health and safety associated with hazardous manual handling. For shop fitting work, this mandates identifying hazardous manual handling tasks, assessing risks, implementing control measures following the hierarchy of control, and reviewing controls when circumstances change. SafeWork authorities increasingly prosecute shop fitting businesses where inadequate manual handling controls contribute to worker injuries, with penalties exceeding $100,000 for companies and $50,000 for officers demonstrating reckless conduct. Working in operational retail environments creates unique hazards from public proximity and building management requirements. Shopping centre policies typically require comprehensive SWMS as a condition of site access, with immediate site exclusion for non-compliance. Physical barriers must prevent public access to work areas where cabinet installation creates overhead work, power tool operation, and manual handling activities. After-hours installation work introduces additional hazards including reduced lighting conditions, limited availability of emergency services, coordination with security personnel, and fatigue from night shift schedules disrupting normal sleep patterns. Workers operating in shopping centres must understand building-specific emergency procedures including evacuation routes, assembly points, and communication protocols with centre management. Power tool hazards during cabinet installation include circular saw use for on-site modifications, jigsaw operation for service penetrations, drill and driver use for assembly and fixing, and router use for edge profiling. These tools operating in confined retail spaces with hard floor surfaces create noise levels frequently exceeding 85dB requiring hearing protection. Dust generation from cutting melamine and engineered materials in poorly ventilated enclosed tenancies creates respiratory hazards requiring on-tool extraction or respiratory protection. Electrical safety concerns arise from multiple extension leads, work near electrical distribution boards in service areas, and integration of cabinet electrical systems with building services requiring coordination with licensed electricians. Exposure to hazardous substances occurs through adhesives for benchtop installation, silicone sealants for waterproofing and finishing, contact adhesives for edge banding, and surface coatings for touch-ups. In poorly ventilated retail tenancies, particularly those not yet commissioned with operational HVAC systems, vapour concentrations can exceed exposure standards. Acetic acid from silicone sealants causes respiratory and eye irritation in confined spaces. Volatile organic compounds from adhesives and coatings create headaches, dizziness, and nausea during extended exposure. Proper SWMS implementation requires forced ventilation using portable extraction fans, vapour monitoring where high exposure potential exists, and respiratory protection when engineering controls cannot adequately reduce exposure.

Reinforce licensing, insurance, and regulator expectations for Cabinet Installation Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Manual Handling of Heavy Display Cabinets and Reception Desks

High

Shop fitting cabinet installation involves repeated lifting and positioning of heavy retail display cabinets (40-80kg), reception desk sections (50-120kg), and point-of-sale counters with stone tops (80-150kg sections). These loads must be transported through shopping centre corridors, service lifts with dimensional restrictions, and into retail tenancies with limited manoeuvring space. Wall-mounted display cabinets require holding at shoulder height or above during fixing to structural supports. Floor-standing units must be precisely positioned and levelled in confined spaces. The combination of extreme load weights, awkward access routes, sustained holding during fixing, and work in cramped retail spaces creates severe musculoskeletal injury risk affecting lower back, shoulders, and knees.

Consequence: Acute lower back strain requiring surgical intervention, chronic shoulder impingement from overhead work, herniated lumbar discs causing permanent disability, soft tissue tears requiring extended rehabilitation, and knee cartilage damage from prolonged kneeling during installation work leading to long-term mobility restrictions and potential early retirement from the trade.

Glass Handling and Breakage During Display Cabinet Installation

High

Retail display cabinets frequently incorporate large glass panels including toughened glass doors, laminated glass display surfaces, and glass shelving systems. These panels weigh 15-40kg each, have smooth surfaces providing poor grip, and require precise handling to avoid edge damage. Installation requires supporting glass weight while aligning into metal or timber framing channels. Toughened glass can spontaneously fracture if edge damage occurs, creating explosive fragmentation into small cube-shaped pieces. Laminated glass develops sharp edges when cracked. Workers face laceration risks from handling broken glass, and glass fragments can cause severe eye injuries if protective eyewear is not worn during installation and cleaning.

Consequence: Deep lacerations to hands, wrists, and forearms from broken glass requiring emergency department treatment and possible tendon repair surgery, eye injuries from glass fragments potentially causing permanent vision impairment, puncture wounds to feet and legs if glass falls, and psychological trauma from sudden glass failure events creating ongoing safety concerns for workers.

Working Near Public in Operational Retail Environments

High

Shop fitting cabinet installation frequently occurs in shopping centres and retail premises during trading hours or in operational buildings with customer access to adjacent tenancies. Power tool operation, manual handling of heavy cabinets, and overhead work create hazards for members of the public who may inadvertently enter work areas. Children present particular risk as they may not read warning signs or understand construction hazards. Inadequate physical barriers allow public proximity to falling object hazards from cabinet installation, power tool operation, and manual handling activities. After-hours work reduces public presence but creates different risks from reduced lighting, minimal security presence, and worker fatigue from night shift schedules.

Consequence: Members of public struck by falling cabinets or glass panels causing head injuries or fractures, children accessing work areas and suffering injuries from power tools or materials, public slip and fall incidents on construction debris, noise complaints and trading disruption from inadequate planning, and potential prosecution under WHS legislation for failing to protect public health and safety in areas under PCBU control.

Power Tool Injuries During Cabinet Modification and Assembly

High

Cabinet installation in shop fitting requires various power tools including circular saws for trimming cabinet sections, jigsaws for service penetrations and cut-outs, routers for edge profiling and modifications, drills and drivers for assembly and wall fixing, and nail guns for securing panels and trim. Work occurs in confined retail tenancies with limited workspace for safe tool operation. Extension leads create trip hazards and electrical risks. Dust from cutting melamine, MDF, and engineered stone generates fine particulates in poorly ventilated spaces. Noise from multiple power tools operating simultaneously in hard-surfaced retail environments frequently exceeds 85dB. Rushed work under tight deadlines increases risk of contact injuries from rotating blades, puncture wounds from nail guns, and inadequate pre-start tool inspections.

Consequence: Severe lacerations to hands and fingers from circular saw or router contact requiring microsurgery and extended recovery, puncture wounds from nail gun misfires potentially penetrating hands or feet, eye injuries from flying debris during cutting operations, hearing damage from prolonged noise exposure without adequate protection, and respiratory sensitisation from inhaling fine dust particulates leading to occupational asthma.

Falls from Stepladders During Wall Cabinet Installation

Medium

Installing wall-mounted display cabinets and upper storage units at heights of 1800-2400mm above floor level requires stepladders or platform ladders in retail environments where floor space limitations prevent larger access equipment. Workers must hold heavy glass-fronted cabinets with both hands while positioning against walls and securing to framing. This creates overbalancing risk particularly when working alone due to labour cost pressures. Cluttered work areas from packaging materials and stored cabinets reduce safe ladder placement options. Retail floor surfaces including polished tiles and vinyl create slip risks for ladder feet. Rushed installation to meet retail opening deadlines encourages unsafe shortcuts including overreaching from ladders rather than repositioning.

Consequence: Falls from 1.5-2.5 metre heights causing head injuries including concussion and skull fractures, wrist and forearm fractures from impact, shoulder dislocations from landing on extended arms, spinal compression injuries, and soft tissue trauma to hips and lower back requiring extended recovery and potentially permanent mobility limitations affecting ongoing work capacity in the trade.

Adhesive and Sealant Vapour Exposure in Enclosed Retail Spaces

Medium

Cabinet installation involves silicone sealant application for waterproofing and aesthetic finishing, construction adhesives for benchtop bonding, contact adhesives for edge banding and laminate application, and polyurethane sealers for exposed timber or composite surfaces. These products release vapours including acetic acid from silicone sealants, volatile organic compounds from solvent-based adhesives, and isocyanates from two-part polyurethane products. Work occurs in retail tenancies often not yet commissioned with operational HVAC systems, creating poor natural ventilation particularly in interior tenancies without external windows. Prolonged exposure during extended installation work in confined spaces creates cumulative vapour concentration exceeding workplace exposure standards.

Consequence: Acute respiratory irritation including coughing, throat irritation, and breathing difficulty requiring medical assessment, severe headaches and dizziness affecting work performance and potentially causing accidents, nausea and vomiting from high vapour concentrations, skin sensitisation and contact dermatitis from direct contact with uncured products, and potential long-term respiratory sensitisation creating allergic reactions to future chemical exposures that may prevent continued work in the shop fitting industry.

Sustained Awkward Postures During Installation and Adjustment

Medium

Cabinet installation requires prolonged awkward postures including kneeling and squatting during floor-level fixing and adjustment, overhead reaching during wall cabinet installation, sustained stooping during benchtop alignment and securing, working inside cabinet frames to drill service penetrations, and repetitive bending during hardware installation. Retail environments often lack adequate workspace requiring installers to adopt cramped positions in corners and alcoves. Precision alignment requirements for high-quality commercial installations demand sustained static postures while making fine adjustments. Time pressures to complete installations within allocated windows encourage working through discomfort rather than taking adequate breaks. Repetitive fixing operations using cordless drivers create hand-arm vibration exposure and repetitive strain injuries to wrists and forearms.

Consequence: Chronic knee pain and progressive cartilage degeneration from sustained kneeling on hard retail floor surfaces, lower back pain and disc degeneration from prolonged stooping and twisting, shoulder impingement syndrome from overhead work installing wall cabinets, neck strain from working in confined positions inside cabinets, hand-arm vibration syndrome from repetitive power tool use, and carpal tunnel syndrome from repetitive gripping and tool operation requiring extended treatment and possible surgical intervention.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Mechanical Lifting Aids and Team Lifting Protocols for Heavy Cabinets

Engineering Control

Eliminate solo manual handling of heavy cabinets through provision of mechanical lifting aids and mandatory team lifting protocols. Use adjustable cabinet jacks to support wall-mounted cabinets at height during fixing, eliminating the need for workers to hold loads while securing fixings. Provide furniture dollies and panel carriers for transporting cabinets through shopping centres. Implement mandatory two-person or three-person lift requirements based on load weight and dimensions. Use furniture sliders to reposition heavy floor-standing cabinets, reducing manual handling effort.

Implementation

1. Supply adjustable cabinet jacks capable of supporting loads to 100kg at heights from 1200mm to 2400mm for all wall cabinet installations 2. Provide furniture dollies rated to 200kg capacity with soft non-marking wheels suitable for retail floor surfaces 3. Issue panel carriers with secure grip handles for two-person transport of large glass panels and cabinet doors 4. Establish mandatory team lift requirements: two persons for cabinets 15-50kg, three persons for units exceeding 50kg or 1800mm in any dimension 5. Use furniture sliders under heavy floor-standing units to enable repositioning without full lifting 6. Pre-position cabinets close to final installation location using mechanical aids before commencing installation 7. Schedule adequate workforce to ensure team lift protocols can be maintained throughout installation work

Glass Handling Procedures and Protective Equipment

Administrative Control

Implement specific glass handling procedures to minimise breakage risk and protect workers from laceration injuries. Require suction lifters for handling large glass panels to provide secure grip and controlled placement. Mandate cut-resistant gloves rated for glass handling during all glass panel installation. Establish procedures for inspecting glass for edge damage before installation. Require edge protection on all glass during transport and storage. Implement immediate cleanup protocols if glass breakage occurs to prevent secondary injuries.

Implementation

1. Provide dual-cup suction lifters rated to 50kg for handling glass panels exceeding 800mm in any dimension 2. Require cut-resistant gloves rated to Level 5 per AS/NZS 2161.4 during all glass handling operations 3. Inspect all glass panel edges for chips, cracks, or damage before installation; reject damaged units for replacement 4. Maintain edge protection (foam or rubber guards) on all glass panels until immediately before installation 5. Store glass panels vertically on padded supports, never flat stacked which creates edge stress 6. If glass breakage occurs, establish immediate exclusion zone, distribute heavy-duty gloves and safety glasses to cleanup crew 7. Use vacuum cleaners with HEPA filtration for fine glass fragment removal from retail floor surfaces 8. Document all glass breakage incidents including probable cause and photographs for supplier claims

Physical Barriers and Public Exclusion Zones in Operational Retail Areas

Engineering Control

Establish substantial physical barriers creating complete exclusion zones between cabinet installation work and public access areas in shopping centres and operational retail premises. Use solid hoarding panels extending floor to ceiling or minimum 2 metres height to prevent public entry. Install horizontal overhead protection where cabinet installation creates falling object hazards over public areas. Coordinate with shopping centre management regarding barrier specifications, placement, and signage requirements. Schedule high-hazard work outside trading hours where practicable.

Implementation

1. Install solid panel hoarding at all work zone boundaries extending minimum 2 metres height or floor-to-ceiling in shopping centres 2. Secure hoarding panels to structural elements ensuring panels cannot be pushed over by public contact 3. Apply clear signage to all barriers: 'CONSTRUCTION AREA - AUTHORISED PERSONNEL ONLY - DANGER' in minimum 100mm text height 4. Install horizontal protection (scaffold planks or decking) overhead if cabinet installation work is above public access areas 5. Maintain minimum 2 metre clearance between physical barriers and active work areas to prevent public interaction 6. Coordinate with centre management before installation regarding barrier placement, fire egress requirements, and emergency access 7. Schedule glass installation, power tool work, and overhead activities outside trading hours when public traffic is minimal 8. Require high-visibility clothing (Class D per AS/NZS 4602.1) for all workers to distinguish from public 9. Station worker at barrier entry points during trading hours to prevent unauthorised public entry to work areas

Pre-Start Power Tool Inspection and Maintenance Protocol

Administrative Control

Require documented daily pre-start inspection of all power tools before use. Verify safety features including blade guards, trigger locks, and emergency stops function correctly. Maintain tool register showing last inspection date, service history, and next service due date. Remove defective tools from service immediately with clear tagging. Ensure all portable electrical equipment operates through 30mA RCD protection. Implement battery tool preference over corded tools to eliminate trailing lead trip hazards in congested retail environments.

Implementation

1. Complete pre-start tool inspection checklist daily before commencing work covering guards, triggers, power leads, batteries 2. Test circular saw blade guards by manually opening and verifying spring return to closed position 3. Inspect power tool lead insulation for cuts, abrasions, or exposed conductors; verify plug integrity and earth pin presence 4. Test RCD protection by pressing test button; replace or repair if RCD fails to trip immediately 5. Check battery tool charge levels; maintain spare charged batteries to eliminate pressure to use partially charged tools 6. Photograph and document defective tools; apply red 'DO NOT USE' tag and physically remove from work area 7. Maintain digital tool register recording inspection dates, defects identified, repairs completed, and next service due 8. Verify nail gun sequential firing mechanism operates correctly - trigger must not activate unless nose safety depressed 9. Replace worn or damaged drill bits and saw blades immediately; do not use damaged cutting tools

Platform Ladder Use and Fall Protection for Elevated Work

Substitution

Substitute conventional stepladders with platform ladders providing larger standing surface (minimum 450mm x 450mm) and handrail support for wall cabinet installation. Platform ladders allow both hands free for cabinet positioning while maintaining three points of contact through body support against handrails. For continuous wall cabinet runs exceeding 2.4 metres, use mobile work platforms providing stable working height across entire installation length. This eliminates need for repeated ladder repositioning reducing fall risk.

Implementation

1. Provide platform ladders rated to 150kg capacity with handrails extending minimum 900mm above platform level 2. Select platform ladder height to position installer's shoulders at wall cabinet fixing height, eliminating overhead reaching 3. Verify platform ladder legs are fully extended and locked with audible/visible confirmation before climbing 4. Position platform ladder to allow installer to face work squarely without body twisting or lateral reaching beyond platform edge 5. Use mobile scaffold platforms (900mm x 2400mm minimum) for cabinet runs exceeding 2.4m continuous length 6. Maintain three points of contact when ascending or descending platform ladders 7. Never stand on upper rungs above marked safe working height or lean beyond platform edge 8. Use cabinet jacks to support cabinet weight during fixing rather than manual holding from platform 9. Reposition platform ladder to maintain work within safe reach rather than overreaching to adjacent areas

Forced Mechanical Ventilation During Adhesive and Sealant Application

Engineering Control

Provide portable mechanical ventilation to control vapour exposure when applying silicone sealants, construction adhesives, or surface coatings in enclosed retail tenancies. Position extraction fans to draw vapours away from installer breathing zones and exhaust to building exterior or well-ventilated areas. Maintain continuous extraction during application work and for specified flash-off period after completion. Monitor for vapour odours indicating inadequate ventilation requiring increased air change rates or respiratory protection.

Implementation

1. Position portable extraction fans rated to minimum 500 cubic metres per hour air movement in window or door openings 2. Direct extraction fan airflow to draw vapours away from installer's breathing zone toward exhaust point 3. Create cross-flow ventilation by opening additional doors or windows at opposite end of tenancy from extraction fan 4. Maintain continuous extraction during all adhesive, sealant, or coating application work 5. Continue extraction for minimum 45 minutes after completing application to remove residual vapours during flash-off period 6. If strong vapour odours persist despite extraction, evacuate area and allow extended ventilation before re-entry 7. Provide half-face respirators with organic vapour cartridges (AS/NZS 1716) if mechanical ventilation cannot adequately reduce vapour concentrations 8. Monitor installer symptoms including headache, dizziness, or nausea indicating excessive exposure requiring increased controls 9. Schedule adhesive and sealant work to allow overnight ventilation before client handover or public access

Task Rotation and Ergonomic Work Practices

Administrative Control

Plan cabinet installation sequence to minimise prolonged awkward postures by rotating installers between different tasks requiring varied body positions. Alternate between floor-level work (kneeling/squatting), wall cabinet installation (overhead reaching), and benchtop work (standing) to vary muscle group loading. Schedule mandatory rest breaks during extended installation exceeding 4 hours continuous work. Provide ergonomic aids including knee pads, anti-fatigue mats, and adjustable work supports to reduce postural strain.

Implementation

1. Assign different installers to floor cabinet installation and wall cabinet installation on multi-person projects, rotating every 90-120 minutes 2. Supply knee pads rated Type 2 per AS/NZS 4503 for all workers performing floor-level installation tasks 3. Provide anti-fatigue mats for standing work areas during cabinet assembly and benchtop preparation 4. Use adjustable height trestles for cabinet assembly work maintaining work surface at 900-1000mm height (elbow height) 5. Schedule 10-minute rest breaks every 2 hours during installation work; encourage stretching exercises during breaks 6. Elevate base cabinets on temporary blocks during initial positioning and levelling to reduce bending angles 7. Avoid sustained kneeling exceeding 30 minutes without standing break to restore circulation 8. Use anti-vibration gloves during extended cordless driver operation for repetitive fixing work 9. Position work to minimise twisting and reaching beyond comfortable arm extension range

Personal protective equipment

Requirement: Level 5 cut resistance per AS/NZS 2161.4

When: During all glass panel handling, toughened glass installation, engineered stone benchtop handling, and sheet material with sharp edges

Requirement: Medium impact rated per AS/NZS 1337.1

When: During all power tool operation including sawing, drilling, routing, and nail gun use; when working beneath wall cabinets during installation; during glass handling and installation

Requirement: Class 3 or Class 4 per AS/NZS 1270

When: When operating circular saws, routers, or multiple power tools continuously for periods exceeding 5 minutes; when working in hard-surfaced retail environments amplifying tool noise

Requirement: Type 2 knee pads per AS/NZS 4503

When: During all floor-level cabinet installation, base unit assembly, kickboard fitting, and any work requiring kneeling postures on hard retail floor surfaces

Requirement: Category 1 impact protection per AS/NZS 2210.3

When: Throughout all cabinet installation activities to protect against dropped units, glass panels, benchtops, or tools; slip-resistant sole required for polished retail floor surfaces

Requirement: Nitrile construction per AS/NZS 2161.10.2

When: When applying silicone sealants, construction adhesives, contact adhesive, polyurethane coatings, or handling chemical-based surface treatments and cleaners

Requirement: Class D day/night per AS/NZS 4602.1

When: When working in operational shopping centres or retail premises during trading hours to distinguish workers from public; when working in loading docks or service areas with vehicle traffic

Inspections & checks

Before work starts

  • Verify retail tenancy is accessible and clear of previous trades' materials; confirm clean floor surface for cabinet positioning and alignment
  • Measure installation area dimensions and compare to cabinet shop drawings; identify any dimensional discrepancies requiring resolution before delivery
  • Locate and mark wall studs or structural framing members for wall cabinet fixing; verify structural adequacy for anticipated cabinet loads
  • Confirm electrical rough-in locations align with cabinet design for display lighting, power outlets, and equipment connections
  • Inspect delivered cabinets for transport damage, correct finishes matching specifications, and completeness of all components before unpacking
  • Verify availability of mechanical lifting aids including cabinet jacks, furniture dollies, panel carriers, and platform ladders adequate for installation
  • Check power tool serviceability including guards, triggers, leads, and battery charge; complete pre-start inspection checklist for all tools
  • Confirm physical barriers and public exclusion zones are installed to shopping centre management requirements if working in operational retail areas
  • Verify portable extraction ventilation equipment is available and functional for adhesive and sealant application work
  • Coordinate with shopping centre security and management regarding work hours, access routes, loading dock usage, and waste disposal procedures

During work

  • Monitor manual handling practices; intervene if installers attempt solo lifts of cabinets exceeding weight or dimension thresholds for team lifting
  • Verify cabinet jacks are supporting wall cabinet weight during fixing; ensure workers are not manually holding heavy loads while securing fixings
  • Inspect glass panels for edge damage before installation; reject any panels showing chips, cracks, or damage for supplier replacement
  • Check physical barrier integrity throughout work period; verify public cannot access work areas through gaps or displaced panels
  • Verify platform ladder positioning allows work without overreaching; ensure three points of contact maintained when working at height
  • Monitor power tool guard function before each use; verify blade guards return to closed position and nail gun sequential fire mechanisms operate correctly
  • Check mechanical ventilation effectiveness during adhesive and sealant application; monitor for strong vapour odours indicating inadequate ventilation
  • Verify cabinet alignment and levelness at each stage before proceeding; ensure precision tolerances maintained for high-quality commercial installation
  • Monitor installer fatigue during extended installation work; enforce scheduled breaks every 2 hours and task rotation between varied activities
  • Maintain clear access routes and housekeeping standards; immediately clean up packaging materials, off-cuts, and debris creating trip hazards

After work

  • Inspect all cabinet fixing points to verify secure attachment to structural framing; test wall-mounted cabinets for movement or inadequate support
  • Clean installation area removing all packaging materials, off-cuts, timber scraps, and construction debris from retail tenancy
  • Store unused adhesives, sealants, and coatings in appropriately ventilated area away from ignition sources; ensure containers are sealed
  • Complete tool inspection noting any damage, defects, or maintenance requirements before storage for transport to next site
  • Ventilate enclosed retail tenancy for minimum 45 minutes after final sealant application before closing and handing over to client
  • Photograph completed installation as quality record and for warranty documentation; document any installation variations from original drawings
  • Remove physical barriers and restore public access areas to clean condition; coordinate with shopping centre management for barrier removal approval
  • Document waste disposal including off-cut materials and packaging through shopping centre waste management systems; obtain required disposal receipts
  • Report any near-miss incidents, safety concerns, or public interactions in daily work log including contributing factors and corrective actions implemented
  • Conduct post-installation inspection with client or centre management addressing any defects, operational concerns, or final adjustments required

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready

Site Access and Pre-Installation Verification

Coordinate with shopping centre management or building owner to confirm site access approval, loading dock booking, and service lift reservation for cabinet delivery and installation period. Obtain required site induction completion from all workers before entry. Verify retail tenancy is accessible with door access codes or key possession confirmed. Clear installation area of all materials and debris from previous trades including electrical, plumbing, and plastering contractors. Sweep and clean floor surfaces thoroughly to ensure accurate cabinet levelling and prevent debris interfering with cabinet positioning. Measure wall lengths, verify ceiling heights, and check floor levelness using spirit level and laser level. Compare actual dimensions to cabinet shop drawings identifying any discrepancies requiring immediate resolution. Mark wall stud or structural framing locations using electronic stud finder; verify findings by test drilling small pilot holes at marked positions. Photograph pre-installation condition of retail tenancy documenting existing damage or defects to protect against unfounded damage claims. Establish physical barriers at tenancy entrance if working during shopping centre trading hours; coordinate barrier specifications with centre management.

Safety considerations

Ensure adequate lighting in retail tenancy - install temporary lighting if building services not yet commissioned. Remove all trip hazards from access routes and work areas. Verify structural adequacy of walls before marking fixing positions - plasterboard alone cannot support cabinet loads. Coordinate with centre security regarding after-hours access and emergency contact procedures. Maintain clear communication regarding work hours and noise restrictions to avoid breaching centre management conditions.

Cabinet Delivery, Inspection, and Material Handling

Coordinate cabinet delivery to shopping centre loading dock adhering to booking times and access restrictions. Use furniture dollies rated to 200kg capacity to transport cabinets from loading dock through shopping centre corridors and service lifts to retail tenancy. Check service lift dimensional restrictions before attempting to transport large cabinets; plan delivery sequence to fit largest items first. Inspect all delivered cabinets immediately for transport damage including corner dents, scratched finishes, damaged doors, and broken glass. Document any damage with photographs before accepting delivery; reject severely damaged items requiring manufacturer replacement. Verify cabinet finishes, hardware, and glass specifications match shop drawings and client selection schedules. Check cabinet quantities against delivery docket ensuring all units are delivered. Unwrap and position cabinets in retail tenancy grouping by installation sequence - typically starting with corner units and working along wall runs. Handle glass-fronted display cabinets with extreme care using two-person lift for all units. Use panel carriers with secure grips for transporting large glass panels and doors. Store cabinets on protective cardboard or blankets to prevent floor surface scratching in high-quality retail fitouts. Maintain manufacturer edge protection on glass panels until immediately before installation.

Safety considerations

Use mandatory two-person lift for all cabinets exceeding 15kg weight or 1200mm in any dimension. Wear cut-resistant gloves rated Level 5 when handling glass-fronted cabinets or glass panels. Ensure clear access routes through shopping centre free from public obstruction. Use furniture sliders under heavy cabinets when repositioning in tenancy to avoid repeated lifting. Do not stack cabinets more than two units high to prevent tipping hazards. Inspect glass panels for edge damage before installation; reject damaged units immediately.

Floor-Standing Cabinet Assembly and Positioning

Assemble floor-standing display cabinets, storage units, and point-of-sale counters according to manufacturer assembly instructions on clean floor area or using adjustable height trestles set at 900mm working height. Install adjustable levelling feet to all base cabinets before positioning, pre-setting feet to approximate heights based on floor level assessment using laser level. Position cabinets using team lifting protocols - two persons for standard units, three persons for heavy stone-topped counters or large display cases. Start installation with corner units establishing reference points for adjacent cabinet runs. Maintain minimum 2mm gaps between adjacent cabinets for screw connection without binding. Check each cabinet for level in both directions using precision spirit level on cabinet top surface; adjust levelling feet to achieve level within 1mm tolerance for high-quality commercial work. Shim behind cabinets if walls are significantly out of plumb to prevent rocking and ensure stable installation. For free-standing display cabinets in public retail areas, install anti-tip devices connecting cabinets to walls preventing customer injury from tipping. Connect adjacent floor-standing cabinets through cabinet sides using appropriate fixing screws (typically 6mm x 40mm) at top, middle, and bottom positions. Verify alignment of cabinet fronts forms continuous straight lines before final tightening of connection fixings. Check door and drawer operation after cabinet connection ensuring no binding from misalignment.

Safety considerations

Use knee pads rated Type 2 during all floor-level assembly and adjustment work. Wear cut-resistant gloves when handling cabinets with sharp metal edges or glass components. Position work to avoid manual handling in confined corners - plan sequence working from open areas inward. Use furniture sliders under heavy cabinets during final positioning adjustments. Verify adequate workforce is available for team lifting protocols before attempting cabinet movement. Take 10-minute breaks every 2 hours during extended floor-level work to prevent knee strain and lower back fatigue.

Wall-Mounted Display Cabinet Installation

Install wall-mounted display cabinets for retail merchandise presentation at heights typically ranging from 1800mm to 2400mm above finished floor level to cabinet bottom edge. Establish installation height using laser level projecting horizontal reference line at specified cabinet bottom height. Set up platform ladders providing working height positioning installer's shoulders at cabinet hanging rail level, eliminating overhead reaching during fixing. Position adjustable cabinet jacks at cabinet installation height before lifting cabinets into position. Use mandatory two-person lift for all wall-mounted cabinets - first person supports cabinet on jack while second person verifies positioning and secures fixing. Verify cabinet horizontal and vertical alignment against laser reference lines and plumb bob before drilling fixing holes. Drill pilot holes through cabinet hanging rail or fixing blocks into wall studs at maximum 600mm spacing vertically. Install appropriate fixing screws ensuring minimum 40mm penetration into solid timber studs or structural framing. For steel-stud partitions, use appropriate toggle or cavity fixings rated for cabinet weight plus safety factor. For masonry walls, use chemical anchors or expansion bolts rated for dynamic loads. Install minimum four fixing points per standard wall cabinet, with additional fixings for large glass-fronted units. For continuous runs of wall cabinets, install corner units first establishing baseline alignment, then work outward. Connect adjacent wall cabinets through cabinet sides using appropriate screws to ensure aligned faces and distribute loads across multiple cabinets. Support cabinet weight on jacks throughout fixing process; verify all fixings are secure and load-tested before removing jack support. Install anti-tip devices where specified connecting cabinet tops to walls for earthquake resistance in commercial installations.

Safety considerations

Never work alone on wall cabinet installation - mandatory two-person minimum for all elevated work. Verify platform ladder is stable with legs fully extended and locked before climbing. Maintain three points of contact when working on platform ladder. Use cabinet jacks to support cabinet weight during fixing - never manually hold heavy glass-fronted cabinets while fixing. Verify fixing into structural framing, not plasterboard alone which cannot support loads. Wear safety glasses during overhead drilling operations. Do not stand on platform rungs above marked safe working height. Reposition platform ladder rather than overreaching beyond platform edge. Test cabinet security by applying firm downward pressure after fixing completion before removing support jacks.

Glass Panel and Door Installation in Display Cabinets

Install glass panels, shelving, and doors in retail display cabinets using specific glass handling procedures to prevent breakage and worker injury. Inspect all glass components for edge damage including chips, cracks, or stress marks before installation; reject any damaged panels for supplier replacement as installation of damaged glass creates failure risk. Use dual-cup suction lifters rated to 50kg capacity for handling large glass panels exceeding 800mm in any dimension, providing secure grip and controlled placement into metal or timber framing channels. Wear cut-resistant gloves rated Level 5 during all glass handling providing protection against sharp edges if breakage occurs. For glass shelving in display cabinets, install shelf support pins or brackets at specified spacing, ensuring supports are level and secure. Lower glass shelves gently onto supports avoiding impact which can create stress cracks. For glass cabinet doors, install hinges to cabinet frame first, then attach glass door panels using two-person coordination to support door weight during hinge mounting. Adjust door hinges to ensure even gaps around door perimeter (typically 2-3mm) and proper door closure without binding or gaps. For sliding glass doors, install track systems level and parallel, then carefully insert glass doors into tracks avoiding edge impact against metal frames. Install door locks, handles, and closure mechanisms according to manufacturer specifications. For illuminated display cabinets, install LED strip lighting to cabinet interior perimeters ensuring electrical connections are completed by licensed electricians. Test all door operation, lighting function, and locking mechanisms before client handover.

Safety considerations

Wear cut-resistant gloves rated Level 5 and safety glasses during all glass handling operations. Use suction lifters for panels exceeding 800mm dimension - do not attempt manual grip of large glass. Verify suction cup grip is secure before releasing manual support of glass panels. Work with two persons when installing glass doors to support weight during hinge attachment. Clear floor area of debris before glass handling to prevent trip hazards while carrying panels. If glass breakage occurs, immediately establish exclusion zone, distribute heavy-duty gloves to cleanup workers, and use vacuum with HEPA filter for fragment removal. Store glass panels vertically on padded supports, never flat stacked. Maintain edge protection on glass until immediately before installation.

Benchtop and Counter Surface Installation

Install benchtop surfaces for point-of-sale counters, reception desks, and display cabinet tops using materials including engineered stone, solid surface composites, high-pressure laminate, or timber. For engineered stone benchtops manufactured off-site, coordinate with stone fabricator for delivery and installation supervision. Use team lifting with minimum three persons for stone sections exceeding 50kg - typical point-of-sale counter sections weigh 80-120kg requiring coordinated lift. Position stone benchtop onto cabinet supporting framework using furniture sliders to avoid lifting during final positioning adjustments. Verify level positioning across entire benchtop span using precision spirit level; shim beneath benchtop at cabinet support points if required using appropriate packing materials. Check overhang dimensions at front edges match specifications (typically 30-40mm for retail counters). For joined benchtops, apply colour-matched epoxy adhesive to join surfaces following fabricator instructions; clamp join tightly using specialised benchtop clamps or weight until adhesive cures. Wipe excess adhesive immediately using appropriate solvent before curing. Secure benchtop to cabinet framework using fixings from beneath - typically L-brackets or corner blocks with screws into benchtop underside. Calculate screw penetration carefully ensuring screws will not break through benchtop surface (typically maximum 25mm penetration for 30mm stone). For laminate benchtops, apply construction adhesive to cabinet top frame, position benchtop, and secure using screws from beneath through cabinet corner blocks. Apply edge banding or trim pieces to exposed benchtop edges using contact adhesive or mechanical fixing. Install splash backs behind counters if specified using silicone adhesive to benchtop and mechanical fixing to walls. Apply silicone sealant to join between benchtop and wall splash back; tool silicone to neat concave profile. Maintain mechanical ventilation during adhesive and sealant application and for 45-minute flash-off period.

Safety considerations

Use mandatory three-person team lift for engineered stone sections exceeding 50kg weight. Wear cut-resistant gloves rated Level 5 when handling stone or laminate benchtops with sharp edges. Use furniture sliders beneath stone during positioning to avoid repeated lifting. Ensure adequate ventilation when using construction adhesives and silicone sealants - position extraction fan in window or door. Wear nitrile gloves when applying adhesives and sealants preventing skin contact with uncured chemicals. Calculate screw penetration depth carefully to prevent breakthrough of benchtop surface. Support benchtop adequately during fixing to prevent movement or collapse. Allow adhesive full cure time before applying loads to joined benchtops.

Hardware Installation, Adjustment, and Final Finishing

Install cabinet hardware including door handles, drawer pulls, locks, catches, and soft-close mechanisms according to manufacturer specifications and consistent positioning across all cabinets. Measure handle positions carefully ensuring consistent spacing and alignment visible in continuous cabinet runs. Drill holes for handle fixings using correct drill bit size and depth to avoid breakthrough of cabinet faces. Install handles using appropriate fixing screws supplied by manufacturer; tighten firmly without over-tightening which can strip threads in cabinet materials. For lockable cabinets, install lock mechanisms ensuring keys operate smoothly and locks engage positively. Install shelf support pins at specified heights in adjustable shelf cabinets; verify supports are level preventing shelf tilt. Adjust cabinet doors to ensure even gaps around perimeters, proper closure against catches, and smooth operation. Adjust drawer slides ensuring drawers operate smoothly through full extension without binding or falling off runners. Install soft-close mechanisms if specified ensuring doors and drawers close slowly and positively. Touch up any minor scratches or chips to cabinet finishes using manufacturer-supplied touch-up pens or fill materials matching cabinet colour. Install internal cabinet lighting including LED strips and transformers; verify electrical connections are completed by licensed electrician before energising. Connect cabinet electrical outlets and equipment locations to building electrical services through licensed electrician. Clean all cabinet surfaces removing installation fingerprints, adhesive residue, and dust using appropriate cleaning products for cabinet finish material. Install glass cleaner on display cabinet glass ensuring crystal-clear presentation. Remove protective films from handles, glass panels, and cabinet surfaces. Conduct final quality inspection with client or centre representative verifying all cabinets are installed level, doors operate correctly, lighting functions, and finish quality meets commercial standards.

Safety considerations

Wear safety glasses when drilling overhead into cabinet tops for hardware installation. Use cordless drill with torque limiting function to prevent over-tightening and damage to cabinet materials. Ensure electrical connections are completed only by licensed electricians - shop fitters must not attempt electrical work. Verify power is isolated before accessing cabinet electrical components. Use appropriate cleaning products for cabinet materials avoiding harsh chemicals damaging finishes. Ensure adequate lighting for detailed adjustment work. Maintain good housekeeping removing packaging and waste materials continuously. Document any defects or concerns requiring follow-up action before client handover.

Frequently asked questions

Do shop fitters need SWMS when installing cabinets in operational shopping centres during after-hours periods?

Yes, SWMS are mandatory for cabinet installation work regardless of when work occurs. After-hours installation in shopping centres actually creates additional hazards requiring specific controls including reduced lighting requiring temporary lighting installation, limited access to emergency services necessitating established emergency procedures, coordination with security personnel for site access and incident response, potential fatigue from night shift work requiring additional rest break scheduling, and heightened manual handling risks from rushed work under time pressure to complete before trading hours resume. Shopping centre management universally requires SWMS submission and approval before granting site access, with many centres requiring attendance at site-specific induction sessions covering emergency procedures, waste disposal, loading dock usage, and noise restrictions. Your SWMS should specifically address after-hours work considerations including lighting adequacy, fatigue management, emergency contact procedures, and completion timeframes allowing safe work practices rather than rushed installation increasing injury risk. Working outside standard hours does not reduce WHS obligations - if anything, it heightens the need for thorough planning, documented procedures, and verification that all controls remain effective during after-hours operations.

What are the manual handling weight limits for cabinet installation, and when is mechanical assistance mandatory?

Australian WHS legislation does not specify absolute weight limits for manual handling, instead requiring assessment of all manual handling tasks considering load weight, task frequency, awkward postures, environmental factors, and worker capabilities. However, industry best practice and SafeWork guidelines suggest two-person team lift for loads exceeding 15-20kg, particularly when loads must be held at awkward heights such as wall cabinet installation. For shop fitting cabinet work, implement these thresholds: mandatory two-person lift for cabinets 15-50kg or exceeding 1200mm in any dimension; mandatory three-person lift for cabinets exceeding 50kg or stone-topped counters; mechanical assistance using cabinet jacks for all wall-mounted cabinets regardless of weight eliminating need to hold loads during fixing; furniture dollies or panel carriers for transporting cabinets through shopping centres; and furniture sliders for repositioning heavy floor-standing units. These controls must be documented in your SWMS with clear instruction that solo lifting of cabinets is prohibited. Additional considerations include installer physical capacity, work duration (repeated lifts increase cumulative risk), confined space constraints limiting safe body positioning, and precision requirements demanding controlled placement. Verify adequate workforce is scheduled to implement team lifting protocols throughout installation - never proceed with inadequate staffing forcing solo lifting of heavy cabinets.

How should shop fitters manage coordination with other trades working simultaneously in confined retail tenancies?

Multi-trade coordination is critical in shop fitting where cabinet installers, electricians, data cablers, plumbers, HVAC contractors, and flooring installers often work concurrently in small retail tenancies. Establish daily coordination meetings, even brief 10-minute toolbox talks, discussing work sequences, identifying potential conflicts, and agreeing on workspace allocation. Document these meetings with attendance records demonstrating coordinated approach. Develop visual work schedule showing when and where each trade will operate preventing incompatible activities occurring simultaneously - for example, electricians should not work overhead installing ceiling services while cabinet installers operate power tools directly below creating falling object hazards. Establish clear communication protocols particularly important in retail tenancies where sight lines are obstructed by partitions. Agree on shared facilities including power distribution, waste disposal locations, and material storage areas. Nominate site coordinator responsible for overall safety coordination with authority to resolve conflicts and separate incompatible work. When cabinet installation creates hazards for other trades such as manual handling creating movement hazards or power tool operation creating noise and dust, establish physical separation or schedule separation. Your SWMS should address coordination protocols including daily coordination meeting requirements, communication methods, conflict resolution procedures, and contact details for other trade supervisors. Include procedures for managing emergencies when multiple trades are present including evacuation coordination and roll call procedures ensuring all personnel are accounted for.

What qualifications and licences are required for shop fitting cabinet installation workers?

All workers must hold current Construction Induction Card (White Card) before commencing any construction work including shop fitting cabinet installation. Trade qualifications such as Certificate III in Cabinet Making, Carpentry, or Shopfitting demonstrate competency for the work but are not legally mandatory - however, many shopping centres and commercial clients require trade qualification verification during prequalification. Workers operating elevated work platforms above 11 metres require high-risk work licence WP (boom-type) or WP (scissor lift); workers using platforms below 11 metres do not require licencing but must complete manufacturer or supplier training before operation. First aid qualification should be held by at least one worker on site, with CPR currency maintained through annual updates. Workers entering confined spaces (ceiling voids, service risers) must complete confined space entry training with refresher training every three years. If work involves potential asbestos exposure in older retail premises, workers require asbestos awareness training at minimum, with licenced asbestos removalists required for any removal work exceeding 10 square metres. Employers must verify qualifications and licences before assigning work, maintain training records accessible for inspection, and provide task-specific training on SWMS requirements including manual handling techniques, glass handling procedures, and emergency response protocols. Shopping centres typically require completion of centre-specific induction covering emergency procedures, waste management, loading dock operations, and access restrictions before granting site access - maintain induction completion records for all workers.

How should glass breakage incidents be managed during cabinet installation to prevent worker injury and comply with WHS requirements?

Glass breakage during cabinet installation requires immediate response to prevent laceration injuries and comply with incident reporting requirements. Implement this protocol: immediately establish exclusion zone around breakage area preventing worker and public access to glass fragments; if breakage creates falling glass hazard overhead, evacuate area until all loose glass is secured; do not attempt cleanup until all workers have cut-resistant gloves rated Level 5 and safety glasses with side shields; use suction cups or mechanical grabs to collect large glass pieces rather than manual handling; sweep small fragments using stiff broom into dustpan, never use hands; vacuum fine glass particles using vacuum with HEPA filtration capturing microscopic fragments; inspect surrounding area within 3-metre radius for glass fragments that may have projected from breakage point; dispose of broken glass in clearly labelled rigid containers (never plastic bags which puncture creating secondary injury risk); photograph breakage area and retained glass fragments for supplier warranty claims. Following cleanup, report incident to site supervisor documenting probable cause - transport damage, edge damage during installation, manufacturing defect, or impact during handling. Notify client or shopping centre management if breakage occurred in operational retail area where public may have been exposed to hazard. For notifiable incidents involving serious injury from glass laceration, preserve incident site and notify SafeWork authority immediately. Review incident identifying contributing factors - was glass inspected before installation, were appropriate handling techniques used, were cut-resistant gloves worn, was work rushed - and implement corrective actions preventing recurrence. Update SWMS if incident reveals inadequate controls or procedures requiring modification.

What are the requirements for working in retail tenancies where the HVAC system is not yet operational and ventilation is limited?

Working in retail tenancies before HVAC commissioning creates specific hazards from inadequate ventilation during adhesive and sealant application. Australian WHS legislation requires employers to eliminate or minimise exposure to airborne contaminants including VOCs from adhesives, acetic acid from silicone sealants, and isocyanates from polyurethane coatings. When building HVAC is not operational, implement these controls: provide portable extraction ventilation using fans rated minimum 500 cubic metres per hour positioned in windows or doorways drawing vapours away from worker breathing zones and exhausting to building exterior; create cross-flow ventilation by opening additional access points at opposite end of tenancy; maintain continuous extraction during application work and for minimum 45-minute flash-off period after completion; monitor for strong vapour odours indicating inadequate ventilation requiring increased controls; provide half-face respirators with organic vapour cartridges (AS/NZS 1716) if mechanical ventilation cannot adequately reduce exposure; conduct atmospheric monitoring if high exposure potential exists or if workers report symptoms including headaches, dizziness, or nausea; schedule adhesive and sealant work to allow extended ventilation periods including overnight ventilation before client handover; and limit worker time in confined spaces during high vapour concentration periods. Your SWMS must document specific ventilation controls for work in non-commissioned tenancies. Consider substitution controls using water-based adhesives and low-VOC sealants where product performance allows. Never rely on worker tolerance of vapour exposure - implement engineering controls as primary protection method rather than accepting respiratory irritation as normal work condition.

Related SWMS documents

Browse all documents

shop-fitting

Aluminium Window Door Frame Installation Safe Work Method Statement

Comprehensive SWMS for installing aluminium window and door frames including shopfronts, internal partitions, and commercial entrances with manual handling and glass safety controls.

View document

shop-fitting

Audio Visual Installation Safe Work Method Statement

Comprehensive SWMS for installing commercial AV systems including screen mounting, projector installation, speaker placement, and system commissioning with electrical and height safety controls.

View document

shop-fitting

Awnings Blinds Curtains Installation Safe Work Method Statement

Comprehensive SWMS for installing commercial awnings, blinds, and curtain systems including external awnings, motorised blinds, and heavy commercial curtains with work at heights and fixing safety controls.

View document

shop-fitting

Glass Whiteboard Installation Safe Work Method Statement

Comprehensive SWMS for installing glass whiteboards and writable glass surfaces in office fit-outs including glass handling procedures, wall fixing methods, and elevated work controls.

View document

shop-fitting

Glazing Safe Work Method Statement

Comprehensive SWMS for shopfront glazing and internal glass partition installation in shop fitting including glass handling, framing systems, and structural glass installation controls.

View document

shop-fitting

Handrail Installation Safe Work Method Statement

Comprehensive SWMS for installing handrails and balustrades in shop fitting including wall-mounted handrails, glass balustrades, metal railing systems, and fall protection controls.

View document
Trusted by 1,500+ Australian construction teams

Cabinet Installation SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.