Aquatic play equipment installation SWMS, drafted for your job
Water slides and splash features combine bulky frames, elevated assembly and powered water systems beside pool users. Tell us the aquatic equipment and installation site: your SWMS is drafted around foundations, assembly and testing, and you check it on site before work starts.
A$39per job
However many high-risk activities it covers.
- However many high-risk activities it covers.
- 3 for A$99
- 10 for A$249
- Yearly A$129 for 120
- Monthly A$60 for 10
You review it on site before work starts.
Your Business
Safe Work Method Statement
Version 1
Draft
Aquatic play equipment installation
Site Your site address
Law Your state
High-risk construction work
- Work where someone could fall from height
- Work where powered mobile plant is moving
- Work in or near water where someone could drown
Job steps, hazards and controls
| 1 | Secure pool and installation area | Public access and open water | Extreme | Separate users protect water edges and plan retrieval |
| 2 | Check foundations and lifting plan | Unstable bases and suspended sections | High | Confirm anchors lifting points and temporary support before delivery |
| 3 | Assemble frames and slides | Crushing and falls from incomplete towers | Extreme | Use protected access and secure each section before releasing supports |
| 4 | Connect pumps and controls | Wet electrical work and stored pressure | Extreme | Isolate supplies and check connections before energising |
| 5 | Test and release the play area | Suction entrapment and unfinished equipment | Extreme | Keep users excluded while checking guards fixings and water operation |
Illustrative first page. Yours carries your business name only.
What you get
What your aquatic play equipment installation SWMS will contain
An A4 document your crew can read on site, a PDF for the builder and a sign-on register.
- Job and site detailsYour business, the site, the principal contractor, the dates.
- High-risk construction workThe categories your job involves, ticked.
- Step-by-step methodEach step with its hazards, risk rating and controls.
- How controls are checkedWho puts each control in place, monitors and reviews it.
- PPE, plant and permitsEquipment and training the job needs.
- Emergency planAssembly point, first aid, nearest hospital to confirm on site.
- Consultation and reviewWho was consulted, when it is reviewed.
- Sign-on registerYour crew signs by QR or on paper.
High-risk construction work
Categories this task often involves
You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.
- Work where someone could fall from height
- Work where powered mobile plant is moving
- Work in or near water where someone could drown
State notes
Rules depend on your state
Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.
Hazards and controls
What goes wrong on a aquatic play equipment installation job, and how the SWMS controls it
These rows are written for this task. Your draft adds the ones your site and method need.
- 1
Drowning beside the pool while positioning aquatic play equipment
Extreme- Separate installation from pool users and protect access to the water edge
- Plan retrieval before waterside work and keep rescue access clear
- 2
Aquatic play frames overturning before anchors and braces are complete
Extreme- Check foundations and use the installation design for anchors and temporary bracing
- Keep the frame supported until connections and stability have been checked
- 3
Crushing beneath suspended slide sections during aquatic equipment assembly
Extreme- Use a planned lift with suitable lifting points and separate the load path
- Guide sections from outside pinch points and release lifting gear only after securing them
- 4
Falls from incomplete slide towers during guard and chute installation
Extreme- Use protected work platforms and install edge protection progressively
- Keep people off incomplete towers and arrange rescue for the selected access system
- 5
Electric shock commissioning pumps and controls around wet play areas
Extreme- Keep electrical equipment isolated during connection and separate temporary power from water
- Have electrical connections and protection checked before wet testing
- 6
Entrapment at aquatic feature suction outlets during circulation testing
Extreme- Keep the play area closed and check guards covers and suction arrangements before starting pumps
- Stop testing at exposed outlets or unexpected suction and investigate before further operation
- 7
Children entering unfinished aquatic equipment during installation breaks
High- Maintain a secured enclosure and block access to unfinished slides and towers
- Keep equipment out of use until fixing checks and the planned commissioning are complete
How the job usually runs
- 1Secure pool and installation areaPublic access and open water → Separate users protect water edges and plan retrieval
- 2Check foundations and lifting planUnstable bases and suspended sections → Confirm anchors lifting points and temporary support before delivery
- 3Assemble frames and slidesCrushing and falls from incomplete towers → Use protected access and secure each section before releasing supports
- 4Connect pumps and controlsWet electrical work and stored pressure → Isolate supplies and check connections before energising
- 5Test and release the play areaSuction entrapment and unfinished equipment → Keep users excluded while checking guards fixings and water operation
PPE for this job
- Safety boots
- Safety helmet
- Safety glasses
- Handling gloves
- High-visibility clothing
- Fall protection equipment selected for access
- Personal flotation equipment where the water assessment calls for it
Your draft lists the PPE your site and method need.
After you finalise
Brief your crew and send it to your builder
Crew signs by QR
Send to my builder
PDF and register
Builder sent it back?
Make their changes and re-issue the same job free. Workers re-sign the new version.
Questions
Aquatic play equipment installation SWMS questions
- Last reviewed
- 21 October 2026
- How
- Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
- Next review
- Every six months, or when the method or rules change
Does it cover installing a water slide beside an existing pool?
Yes. Describe the slide supports, lifting method and pool access. The draft covers water edge protection, supported assembly, elevated work and keeping swimmers outside the installation area.
Can it include testing splash pad pumps and spray features?
Yes. Describe the circulation system and control equipment. The draft covers electrical isolation, guarded suction points and keeping the play area closed while connections and water operation are checked.
How much does a aquatic play equipment installation SWMS cost?
One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.
Is this a template?
No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.
Who checks the SWMS?
You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.
My builder sent it back. What now?
Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.
How does my crew sign it?
Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.