Comprehensive SWMS for Fibreglass Swimming Pool Shell Installation

Fibreglass Pool Installation Safe Work Method Statement

2,000+ Australian Businesses Trust OneClickSWMS

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Fibreglass pool installation involves excavation, crane lifting of pre-manufactured pool shells, precise placement into prepared excavations, backfilling, and connection of plumbing and filtration systems. This SWMS addresses excavation collapse hazards, crane lifting safety, underground service strikes, manual handling injuries, and confined space risks associated with pool installation operations in compliance with Australian WHS legislation.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Fibreglass pool installation is a specialised construction activity involving the placement of pre-manufactured fibreglass pool shells into excavated sites at residential and commercial properties. The process requires careful excavation to specified dimensions, location and protection of underground services, crane lifting of pool shells weighing between 800kg and 3000kg depending on size, precise placement ensuring correct levels and alignment, progressive backfilling with controlled materials, and connection of plumbing and electrical systems. Unlike concrete pool construction which is built in-situ, fibreglass pools arrive at site as complete shells manufactured off-site, requiring careful handling during transport and installation to prevent damage to the gel coat finish and structural integrity. The installation sequence typically begins with site assessment and service location using hand excavation trial holes and dial-before-you-dig service plans. Excavation proceeds using excavators or backhoes to dig a hole approximately 500mm larger than pool dimensions on all sides, with depth allowing for sand base, pool shell thickness, and backfill materials. The excavation floor must be level and compacted to provide stable bearing for the pool shell. A sand bed of 100-150mm depth is placed and screeded to precise levels as the pool shell cannot be adjusted significantly once placed. Underground services including power, water, sewer, gas, and telecommunications must be identified, exposed where they cross the excavation area, and protected or relocated before excavation proceeds. Crane lifting operations require careful planning as pool shells are large, relatively fragile structures that can be damaged by point loading if lifting straps are incorrectly positioned. Shells must be lifted using approved lifting straps placed at manufacturer-specified locations, typically around the pool beam or at reinforced lifting points. The crane must have adequate capacity for the shell weight plus rigging, and be positioned on stable ground at a location providing clear access to the excavation without passing the load over buildings, power lines, or occupied areas. During lifting and placement, workers must maintain clear zones around suspended loads, guide the shell using tag lines rather than direct contact, and ensure precise alignment before lowering into the excavation. Water is immediately placed into the shell after installation to provide ballast and prevent shell flotation during backfilling. Backfilling proceeds progressively using sand or crusher dust, placed in layers around the pool shell while water level inside the pool is maintained approximately 300mm above the external backfill level to prevent shell distortion from external pressure. Backfill must be thoroughly compacted using hand compactors or water flooding to eliminate voids that could cause shell movement or collapse if the ground settles. Plumbing connections for filtration, returns, and drainage are made during backfilling as access points are reached. Electrical work for pool lighting, pumps, and automated systems must be completed by licensed electricians following Australian standards for electrical installations in aquatic environments. This Safe Work Method Statement addresses the multiple high-risk activities involved in fibreglass pool installation including excavation, crane lifting, confined space entry, underground services, electrical work, and manual handling.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Fibreglass pool installation involves multiple high-consequence hazards that have resulted in serious injuries and fatalities in the Australian pool construction industry. Excavation collapses can bury workers within seconds, with survival dependent on immediate rescue which is often not achievable before asphyxiation occurs. Safe Work Australia data shows excavation-related incidents remain a leading cause of construction fatalities, with pool excavations particularly high-risk due to their depth (typically 1.8-2.5 metres), residential locations where soil conditions may be unknown, and frequent proximity to existing buildings and services. Workers entering excavations to prepare sand beds, position pool shells, or connect plumbing face collapse risk exacerbated by groundwater ingress, unstable soil conditions, vibration from nearby traffic or equipment, and lack of proper shoring or battering. Crane lifting operations present catastrophic risks if shells are dropped or swung uncontrolled, potentially crushing ground workers, damaging property, or striking overhead power lines. Pool shells weighing up to 3 tonnes suspended 2-3 metres in the air represent enormous kinetic energy if crane failure, rigging failure, or operator error causes loss of control. Struck-by injuries from suspended loads are frequently fatal or result in permanent disability. Underground service strikes during excavation can cause electrocution from power cables, gas explosions from ruptured gas mains, or flooding from water main breaks, each with potential for multiple casualties and extensive property damage. Sydney water and electricity network operators report hundreds of service strikes annually, many occurring during residential excavation work where service plans are incomplete or inaccurate. Under the Work Health and Safety Act 2011 and WHS Regulations, persons conducting a business or undertaking must manage risks from excavation work, confined spaces, crane operations, and electrical work through comprehensive risk assessment and implementation of controls. Specific legal requirements include obtaining excavation permits, securing excavations against collapse through shoring or battering, locating underground services before excavation using dial-before-you-dig and hand excavation exposure, using licensed crane operators and riggers, implementing exclusion zones around crane operations, using licensed electricians for electrical connections, and providing confined space entry permits and atmospheric monitoring where workers enter excavations exceeding 1.5 metres depth. Failure to comply can result in prohibition notices, fines exceeding $600,000 for corporations, and criminal prosecution following serious incidents. The physical demands of pool installation also create significant manual handling injury risks. Workers lift and position heavy plumbing components, shovel and compact backfill material for extended periods, and work in awkward postures when making connections in confined excavations or beneath installed pool shells. Repetitive strain injuries, back injuries, and muscular disorders are common in pool installation crews, resulting in lost time injuries and long-term disability claims. Additionally, working in residential environments creates public safety obligations as excavations may be accessible to children and pets, pool shells on site may present attraction hazards, and crane operations occur in areas with normal residential activities. Only through comprehensive SWMS implementation addressing excavation safety, crane operations, service location, confined space controls, and coordination with other trades can fibreglass pool installation be completed safely while meeting Australian WHS requirements and protecting workers, clients, and the public from serious harm.

Reinforce licensing, insurance, and regulator expectations for Fibreglass Pool Installation Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Excavation Collapse Burying Workers in Pool Excavation

High

Pool excavations typically extend 1.8 to 2.5 metres deep over areas of 20-50 square metres, creating substantial vertical faces that can collapse without warning. Residential properties often have unknown soil conditions including fill material, disturbed ground from previous construction, sandy or loose soils with poor cohesion, and groundwater that reduces soil stability. Excavation sides can fail due to vibration from nearby traffic or equipment, groundwater seepage undermining toe of excavation, surcharge loads from excavated material stockpiled near excavation edge, and deterioration of soil strength over time if excavation remains open for multiple days. Workers entering excavations to prepare sand beds, position formwork, install plumbing, or guide pool shell placement are at extreme risk if collapse occurs. Burial in soil typically results in death within 3-4 minutes from asphyxiation as soil weight prevents chest expansion for breathing. Even partial burial can cause crush injuries to legs preventing escape. Residential pool installations often lack proper edge protection, shoring, or battering due to space constraints and pressure to minimise site disruption, leaving workers fully exposed to collapse risk.

Consequence: Death from asphyxiation within minutes of burial, crush injuries to trapped limbs requiring amputation, multiple worker casualties if several personnel are in excavation when collapse occurs, and psychological trauma to survivors and rescue personnel.

Underground Service Strikes During Excavation Operations

High

Residential properties contain multiple underground services including electrical power cables (both street power and private installations), water mains and service lines, sewer and stormwater pipes, gas supply lines, telecommunications and internet cables, and irrigation systems. Service locations shown on dial-before-you-dig plans are often inaccurate by several metres, particularly for older installations or services installed by previous property owners without proper documentation. Services may be shallower than expected, particularly in areas of previous excavation or where ground levels have changed. Striking electrical cables with excavator buckets or hand tools can cause electrocution of machine operators or ground workers, particularly if cables are wet or damaged insulation creates earth faults. Gas line strikes can result in immediate explosion if ignition source is present, or create explosive atmospheres in confined spaces or buildings if gas migrates through soil. High pressure water mains can erupt with force sufficient to cause drowning or impact injuries, and can rapidly flood excavations creating collapse and entrapment risks. Sewer line strikes create contamination hazards and expensive remediation requirements.

Consequence: Electrocution fatalities from power cable strikes, explosion injuries and fatalities from gas line ruptures, flooding and drowning risk from water main breaks, contamination from sewer strikes, and substantial costs for emergency service repairs and property damage.

Crane Lifting Incidents Dropping or Swinging Pool Shells

High

Fibreglass pool shells weighing 800kg to 3000kg must be lifted by crane from delivery vehicles and precisely placed into excavations, often with minimal ground clearance around the excavation and proximity to buildings, fences, and overhead power lines. Crane lifting failures can result from inadequate crane capacity for combined weight of shell and rigging, unstable ground conditions causing crane tipping, incorrect rigging with lifting straps not positioned at manufacturer-specified points, shell structural failure if lifted at incorrect points, operator error during placement, and wind loading on large surface area of pool shell. Pool shells are relatively fragile compared to their weight, and can fracture if point loaded during lifting or if struck against excavation edges during placement. Uncontrolled swinging of suspended shells creates struck-by hazards for workers positioned around excavations to guide placement. Power line contact can electrify the shell and crane creating electrocution risk for anyone touching the load or crane. Workers may be tempted to steady or guide shells by direct hand contact rather than using tag lines, placing them directly beneath or adjacent to suspended loads in extreme hazard zones.

Consequence: Fatal crush injuries to workers struck by falling or swinging pool shells, electrocution from power line contact, property damage from shells dropped onto buildings or vehicles, crane tip-over causing operator death and extensive property damage, and shell damage requiring costly replacement and project delays.

Confined Space Entry Risks in Deep Pool Excavations

High

Pool excavations exceeding 1.5 metres depth are classified as confined spaces under WHS regulations due to limited egress, potential for oxygen-deficient atmospheres, and entrapment risks. Workers entering excavations to install sand beds, position pool shells, connect plumbing beneath installed pools, or perform final grading work face oxygen depletion in stagnant air at excavation bottom, accumulation of carbon dioxide or other gases that are heavier than air, potential for toxic gases including hydrogen sulfide from disturbed sewers or decomposing organic material, and rapid flooding from groundwater ingress or weather events. Heat stress can occur in deep excavations during summer as air temperature at excavation bottom may be significantly higher than surface temperature with no air movement. Access and egress from pool excavations typically involves ladders which may be inadequate for emergency extraction of injured workers. Excavations may partially collapse trapping workers without full burial, or collapse may block excavation access preventing escape. Communication between workers in excavations and surface supervisors may be impaired making it difficult to raise alarms or coordinate activities.

Consequence: Death from asphyxiation in oxygen-deficient atmospheres, poisoning from toxic gases, heat stroke and cardiac events from heat stress, drowning from rapid excavation flooding, and fatal injuries if workers cannot escape during partial collapse events.

Manual Handling Injuries from Backfill and Plumbing Work

Medium

Pool installation requires extensive manual handling including shoveling and spreading backfill material around installed pool shells, lifting and positioning plumbing components including filtration pumps and pipe assemblies, compacting backfill using hand-operated compaction equipment, and working in awkward postures when making plumbing connections in confined spaces beneath pool coping or inside pool shell compartments. Backfilling a typical residential pool requires placement and compaction of 15-25 cubic metres of sand or crusher dust, much of which must be hand-worked in confined spaces around pool shell where excavators cannot access. Workers adopt bent, twisted, or kneeling postures for extended periods when connecting plumbing or working in excavation corners. Repetitive shoveling can cause acute back injuries from sudden strain when lifting heavy shovel loads, and chronic injuries from cumulative loading over multiple installations. Hand-operated compaction equipment including vibratory plate compactors and jumping jacks cause whole-body vibration exposure and upper limb strain from controlling equipment. Work surfaces in excavations are often uneven, unstable, or muddy creating slip and trip hazards while workers are carrying heavy loads.

Consequence: Acute back injuries requiring surgery and extended recovery periods, chronic repetitive strain injuries causing long-term disability, muscular disorders and joint damage reducing work capacity, hand-arm vibration syndrome from compaction equipment, and increased workers compensation costs from manual handling claims.

Electrical Shock from Pool Lighting and Equipment Installation

High

Swimming pool electrical systems include submersible lighting installed in pool shell walls or floor, filtration pump motors, heating and circulation equipment, automated chlorination systems, and control panels. These systems operate in wet environments with high earth fault current risks and must comply with stringent Australian Standards AS/NZS 3000 requirements for electrical installations in swimming pools including bonding, equipotential zones, and residual current device (RCD) protection. Electrical work performed by unqualified persons, incorrect wiring of pool lights creating energized water, inadequate bonding of metallic pool components, use of non-compliant equipment, and failure to isolate power during installation or maintenance creates electrocution risks to installers and pool users. Pool water is an excellent conductor and electrical faults can energize entire pool volumes creating electrocution risk for anyone in contact with water. Children are particularly vulnerable as their smaller body mass means lower current is required to cause ventricular fibrillation and death.

Consequence: Electrocution of installers during electrical work, electrocution of pool users including children if faulty installation creates energized water, cardiac arrest and death from electrical shock, severe burns from electrical arcs, and prosecution for electrical work performed without appropriate licenses.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Excavation Shoring, Battering, or Benching to Prevent Collapse

Engineering

Engineering controls to prevent excavation collapse include installation of shoring systems using hydraulic or timber bracing, battering excavation sides to stable angles based on soil type (typically 1:1.5 for cohesive soils or 1:2 for granular soils), or benching excavation sides in steps with each bench not exceeding 1.5 metres vertical height. For pool excavations, battering is often most practical in residential settings where space permits, requiring excavation of a larger area but eliminating need for temporary shoring installation and removal. Shoring systems using trench boxes or hydraulic shores are necessary when site constraints prevent battering, with shores designed by qualified engineers and installed by competent workers. Edge protection barriers must be installed around excavation perimeters to prevent personnel, materials, or equipment from falling into excavations. Excavations must be inspected daily before workers enter and after rainfall or other events that may affect stability. Groundwater control through dewatering or drainage prevents water from undermining excavation stability.

Implementation

1. Engage geotechnical engineers to assess soil conditions and specify required battering angles or shoring requirements based on soil type, excavation depth, and groundwater conditions. 2. Design excavation layouts showing battered excavation extent or shoring locations, accounting for need to provide working space around pool shell for backfilling operations. 3. Install edge protection barriers at minimum 1.2 metres from excavation edge to prevent falls and prevent vehicles or equipment approaching excavation edges. 4. For battered excavations, cut sides to specified angles and verify angle using inclinometers or measuring devices before allowing worker entry. 5. For shored excavations, install proprietary shoring systems according to manufacturer specifications or install engineered timber or hydraulic shoring designed for site conditions. 6. Inspect excavations daily before worker entry, checking for cracks in excavation sides, groundwater seepage, undermining at toe of excavation, or changes in soil conditions. 7. Implement dewatering systems using sumps and pumps to remove groundwater and prevent water accumulation at excavation base which can trigger collapse. 8. Maintain excavated material stockpiles at least 1.5 metres from excavation edge to prevent surcharge loading that can trigger collapse. 9. Establish exclusion zones preventing vehicle traffic within 3 metres of excavation edges which can cause vibration-induced collapse. 10. Provide adequate means of egress from excavations including secured ladders positioned to allow rapid exit from any location within excavation.

Underground Service Location Using Dial-Before-You-Dig and Hand Excavation

Elimination

Locating and exposing underground services before mechanical excavation eliminates the risk of service strikes by allowing excavation to proceed with full knowledge of service locations. This control requires obtaining dial-before-you-dig service plans showing indicative locations of all services in the excavation area, conducting hand excavation or vacuum excavation to positively locate and expose services at critical locations, marking exposed services with high-visibility markings and barricades, and supervising mechanical excavation near exposed services to maintain clearances. Some services may require relocation if they pass through the pool excavation area, requiring coordination with service authorities. Electrical cables must be isolated and removed by licensed electricians if they cannot be protected in place. Underground services encountered during excavation that were not shown on plans must be exposed, identified, and assessed before excavation proceeds. This systematic approach eliminates the catastrophic consequences of service strikes through positive identification before mechanical plant operates in service vicinity.

Implementation

1. Submit dial-before-you-dig enquiries minimum 48 hours before excavation commencement, providing accurate site location and excavation extent. 2. Review service plans provided by all service authorities and identify services that cross or are within 3 metres of planned excavation. 3. Conduct hand excavation trial holes using shovels or vacuum excavation equipment at locations shown on service plans to positively locate and expose services. 4. Mark exposed services with high-visibility paint, flags, or barricades showing service type, depth, and alignment to guide mechanical excavation. 5. Notify service authorities of exposed services and obtain advice on required clearances and protection methods such as supporting cables or pipes on timbers. 6. Relocate or isolate services that cannot be protected in place, using licensed electricians for electrical work and licensed plumbers for water and gas services. 7. Implement 'no-go zones' around exposed services where mechanical excavation is prohibited, requiring hand excavation to maintain safe clearances. 8. Provide excavator operators with service location information through toolbox meetings and site inspection before excavation commencement. 9. Position spotters to supervise excavation near exposed services, with authority to stop work if clearances are being compromised. 10. Document all services located including photographs showing service locations, depths, and protection measures implemented.

Crane Lifting Plans with Load Calculations and Exclusion Zones

Administrative

Comprehensive crane lifting plans developed before pool shell lifting operations specify crane capacity requirements, positioning and ground preparation, rigging methods and equipment, exclusion zones around suspended loads, communication protocols, and emergency procedures. The plan must account for actual shell weight obtained from manufacturer specifications, weight of rigging equipment, dynamic loading factors, and wind effects on shell surface area. Crane positioning must be on stable ground at locations providing direct lift paths without passing loads over buildings or occupied areas. Exclusion zones of minimum 4 metres radius around suspended loads must be established and enforced preventing any personnel from approaching loads during lifting. Tag lines allow workers to guide shells while remaining outside exclusion zones. Licensed dogmen or riggers must supervise rigging attachment and lifting operations, verifying rigging is correctly positioned before lifts commence. This systematic planning eliminates improvisation and ensures all aspects of crane lifting are considered and controlled.

Implementation

1. Obtain pool shell weight from manufacturer specifications including weight of water typically placed in shell during transport for stability. 2. Calculate total load including shell weight, rigging weight, and dynamic loading factor of 1.5 to account for acceleration forces. 3. Select crane with capacity exceeding calculated load by minimum 20%, verified through crane load charts for specific boom length and radius required. 4. Assess ground conditions at crane setup location and prepare ground surface using geotextile fabric and crushed rock if required to prevent crane outrigger sinking. 5. Develop site plan showing crane position, swing radius, excavation location, load path, exclusion zones, and overhead service clearances. 6. Verify minimum 3 metre clearance from all overhead power lines or arrange power authority isolation if clearances cannot be achieved. 7. Specify rigging method using manufacturer-approved lifting strap positions on pool shell, typically at pool beam or reinforced lifting points with load distributed evenly. 8. Establish 4 metre radius exclusion zones around suspended loads marked with barriers or witches hats, with signage prohibiting entry. 9. Provide tag lines of minimum 3 metre length allowing workers to guide loads while remaining outside exclusion zones. 10. Conduct toolbox meeting before lifting operations covering lifting plan, roles and responsibilities, communication methods, exclusion zones, and emergency procedures. 11. Verify crane operator holds appropriate license class for crane size and appoint licensed dogman to supervise rigging and signaling.

Confined Space Entry Permits and Atmospheric Monitoring for Excavations

Administrative

For pool excavations exceeding 1.5 metres depth, confined space entry controls include issuing permits before worker entry, conducting atmospheric monitoring to verify oxygen levels and absence of toxic gases, providing mechanical ventilation if required, positioning rescue equipment, and maintaining surface standby personnel capable of implementing rescue. Atmospheric monitoring must verify oxygen concentration is between 19.5% and 23.5%, and that toxic gases including hydrogen sulfide, carbon monoxide, and volatile organic compounds are below exposure limits. Continuous monitoring may be required if conditions are variable or if groundwater is present. Communication systems allow workers in excavations to maintain contact with surface supervisors. Emergency rescue equipment including tripods and winches enables rapid extraction of workers from excavations if incidents occur. This administrative control ensures excavation atmosphere is verified safe before entry and that emergency response capability exists throughout work period.

Implementation

1. Classify all excavations exceeding 1.5 metres depth as confined spaces requiring permit system and atmospheric monitoring. 2. Develop confined space entry permit template documenting atmospheric test results, entry personnel, duration of entry, work being performed, and rescue arrangements. 3. Provide calibrated multi-gas monitors capable of measuring oxygen, carbon monoxide, hydrogen sulfide, and explosive gas levels. 4. Conduct atmospheric testing at excavation bottom before each entry and at intervals during extended work periods, recording results on entry permits. 5. Provide mechanical ventilation using blowers and ducting if atmospheric testing identifies deficient oxygen or elevated contaminants. 6. Position rescue equipment including tripod and winch or davit arm over excavation access point, with rescue harnesses worn by workers in excavation. 7. Appoint trained standby personnel at excavation surface throughout entry period, with capability to implement rescue and raise alarm if required. 8. Implement communication systems including radios or direct voice contact between excavation workers and surface standby personnel. 9. Establish maximum work periods in excavations based on heat stress assessment, typically 20-30 minutes in summer conditions before rotation to surface. 10. Develop emergency rescue procedures specific to pool excavations including rescue equipment deployment, emergency services notification, and first aid response.

Manual Handling Risk Reduction Through Mechanical Aids and Work Rotation

Substitution

Reducing manual handling demands during backfilling and plumbing installation involves substituting manual methods with mechanical aids where practical, including using excavators with tilt buckets to place backfill close to final position reducing shoveling distances, providing conveyor systems or blowers to move sand into confined spaces, using mechanical compaction equipment suited to confined areas, and implementing work rotation to limit individual exposure to repetitive tasks. Workers should be trained in correct lifting techniques, appropriate postures for confined space work, and recognition of early signs of musculoskeletal strain. Providing adjustable height work platforms allows workers to maintain better postures when making plumbing connections. Pre-assembled plumbing manifolds reduce the number of individual connections required in confined spaces. This substitution approach reduces physical demands while maintaining work quality and productivity.

Implementation

1. Use excavators to place backfill material close to pool shell edges, minimizing manual shoveling distances required for final placement. 2. Provide mechanical sand conveyors or blower systems to move sand into confined spaces between pool shell and excavation walls where excavators cannot reach. 3. Use appropriately sized mechanical compaction equipment including narrow plate compactors designed for confined space work rather than relying on hand tamping. 4. Implement work rotation schedules limiting individual workers to 2-hour periods of intensive backfilling work before rotating to less demanding tasks. 5. Train all workers in correct manual handling techniques including maintaining neutral spine position, lifting with legs rather than back, and avoiding twisting while carrying loads. 6. Provide height-adjustable platforms or scaffolding allowing workers to access plumbing connection points at comfortable working heights rather than working from excavation floor. 7. Specify pre-assembled plumbing manifolds and equipment pads that reduce number of individual connections required in confined spaces. 8. Implement team lifting procedures for plumbing components exceeding 15kg, prohibiting single-person lifts of heavy items. 9. Provide mechanical aids including trolleys and wheeled bins for moving backfill materials across sites rather than carrying bags manually. 10. Monitor workers for signs of fatigue or musculoskeletal strain and implement additional rest breaks or work rotation if required.

Licensed Electricians for Pool Electrical Installations to Australian Standards

Administrative

All electrical work associated with pool installations including lighting, pumps, heating equipment, and control systems must be performed by licensed electricians holding appropriate electrical licenses. Work must comply with AS/NZS 3000 Wiring Rules including specific requirements for electrical installations in swimming pools covering bonding of pool shell and metallic components, equipotential zones, RCD protection of all pool circuits, use of extra-low voltage for underwater lighting, and isolation distances between electrical equipment and pool water. Electrical designs must be reviewed and certified, installations must be tested and tagged, and certificates of compliance must be issued before pools are commissioned. This administrative control eliminates work by unqualified persons and ensures specialist knowledge of pool electrical requirements is applied to prevent electrocution risks to installers and pool users.

Implementation

1. Engage licensed electricians holding appropriate A-grade or pool-specific electrical licenses to design and install all pool electrical systems. 2. Require electrical designs showing cable routes, equipment locations, bonding arrangements, RCD protection, and compliance with AS/NZS 3000 pool-specific requirements. 3. Implement permit-to-work system requiring isolation and lockout of electrical power during installation and verification of isolation before work commences. 4. Specify extra-low voltage (12V) pool lighting systems supplied through isolation transformers located minimum 3.5 metres from pool water edge. 5. Install bonding conductors connecting pool shell, metallic pipework, metallic equipment, and reinforcing steel to equipotential bonding point. 6. Provide RCD protection rated at 30mA or less for all pool electrical circuits including lighting, pumps, and equipment. 7. Maintain minimum clearances between electrical equipment and pool water edge as specified in AS/NZS 3000, typically 3.5 metres for standard equipment. 8. Conduct electrical testing including insulation resistance, earth continuity, and RCD function testing before energizing pool electrical systems. 9. Issue electrical compliance certificates documenting installation complies with Australian Standards and is safe for operation. 10. Provide pool owners with electrical safety information covering RCD testing requirements, prohibition on using electrical equipment near pools, and emergency isolation procedures.

Personal protective equipment

Steel Toe Cap Safety Boots

Requirement: Certified to AS/NZS 2210.3 with steel toe caps and penetration-resistant soles

When: Required at all times during excavation, crane lifting, and backfilling operations to protect feet from crushing injuries from dropped materials, excavation collapse, or pool shell contact. Penetration-resistant soles protect against punctures from reinforcing steel and sharp objects in excavations.

Hard Hat with Chin Strap

Requirement: Type 1 helmet compliant with AS/NZS 1801 with secure chin strap

When: Mandatory during crane lifting operations and when working in or near excavations where falling objects hazards exist. Chin strap prevents dislodgement when working in bent postures during excavation work or plumbing installations.

High-Visibility Clothing

Requirement: Class D Day/Night compliant with AS/NZS 4602.1

When: Required at all times to ensure workers are visible to crane operators, excavator operators, and delivery vehicle drivers. Particularly critical during crane operations where crane operator must maintain visual awareness of ground personnel locations.

Cut-Resistant Gloves

Requirement: Rated to Level B or higher per AS/NZS 2161.2 for general handling

When: Required when handling sharp materials including pool shell edges, cut pipes, reinforcing steel, and formwork materials. Must allow sufficient dexterity for rigging operations and plumbing connections while providing cut protection.

Safety Glasses with Side Shields

Requirement: Impact-rated to AS/NZS 1337 with side protection

When: Mandatory during all construction activities to protect against dust, flying particles from excavation and compaction, splashing from plumbing connections, and debris during backfilling operations.

Hearing Protection

Requirement: Class 4 or 5 earplugs or earmuffs per AS/NZS 1270

When: Required when operating or working near mechanical compaction equipment, excavators, and concrete saws which produce noise levels exceeding 85dB(A). Essential during extended periods of mechanical equipment operation.

Sun Protection Including Wide-Brim Hat and Long Sleeves

Requirement: Wide-brim hat with minimum 75mm brim and long-sleeve shirts with UPF 50+ rating

When: Required for all outdoor work during daylight hours to prevent skin damage from UV radiation. Pool installation work involves extended periods of outdoor exposure during excavation and backfilling operations in residential settings with limited shade.

Inspections & checks

Before work starts

  • Obtain and review dial-before-you-dig service plans for excavation area, identifying all underground services and planning service location procedures
  • Conduct geotechnical assessment of soil conditions and groundwater, determining required battering angles or shoring requirements
  • Inspect excavation equipment including excavators, trenchers, and compaction equipment for mechanical defects and verify operator qualifications
  • Verify crane capacity is adequate for pool shell weight plus rigging and that crane has current inspection certification and load charts
  • Inspect lifting rigging including straps, shackles, and spreader bars for damage, wear, or defects and verify weight ratings
  • Assess crane setup location for stable ground conditions and verify clearances from overhead power lines, buildings, and site boundaries
  • Verify atmospheric monitoring equipment is calibrated and functioning correctly for confined space entry monitoring
  • Review emergency procedures including excavation rescue equipment availability, first aid resources, and emergency contact numbers

During work

  • Inspect excavation walls daily before worker entry for cracks, bulging, seepage, or instability indicating potential collapse
  • Monitor groundwater levels in excavations and implement dewatering if water accumulation threatens excavation stability
  • Verify exclusion zones around crane operations are maintained and no unauthorized persons approach suspended pool shells
  • Conduct atmospheric monitoring at excavation bottom before each entry and at regular intervals during extended work periods
  • Monitor backfilling levels in relation to water level in pool shell, maintaining water approximately 300mm above backfill level
  • Inspect plumbing connections for leaks during pressure testing before backfilling covers connections permanently
  • Monitor weather conditions including rainfall forecasts and wind speeds that may affect excavation stability or crane operations

After work

  • Verify all excavations are either backfilled or adequately barricaded and covered to prevent falls if work extends over multiple days
  • Inspect completed backfilling for settlement or voids and conduct additional compaction if required to prevent future ground movement
  • Verify electrical installations are tested and certified by licensed electrician before pool commissioning
  • Document any service strikes, near-misses, or safety incidents for investigation and reporting to regulators if required
  • Conduct final site inspection verifying all temporary shoring and edge protection is removed and site is left in safe condition

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready
1

Site Assessment and Underground Service Location

Before excavation commencement, obtain dial-before-you-dig plans for the site showing locations of underground services including electrical, water, sewer, gas, and telecommunications. Review plans with site supervisor and identify services that cross or are located within 3 metres of planned excavation area. Conduct hand excavation trial holes at locations indicated on service plans to positively locate and expose underground services. Mark exposed services with high-visibility paint and flags showing service type, depth, and direction of travel. Install protective barriers around exposed services to prevent damage from equipment or foot traffic. If services pass through excavation area and cannot be protected in place, arrange relocation or isolation by service authority before excavation proceeds. Document service locations with photographs and measurements to guide mechanical excavation operations.

Safety considerations

Service strikes can cause electrocution from power cables, explosions from gas lines, and flooding from water mains. Service plans show indicative locations only and may be inaccurate by several metres. All services must be positively located by hand excavation before mechanical plant operates in vicinity. Workers conducting hand excavation must use insulated tools and maintain awareness that unmarked services may exist.

2

Excavation with Collapse Prevention Measures

Mark excavation outline on ground surface using spray paint or timber pegs, with dimensions allowing 500mm clearance on all sides beyond pool shell dimensions. Verify excavation will not undermine adjacent buildings or structures and is located minimum 1.5 metres from building foundations. Install exclusion zone barriers preventing personnel and vehicles from approaching excavation area during mechanical excavation. Using excavator, commence excavation to design depth typically 1.8 to 2.5 metres below finished ground level. If battering excavation walls, cut to specified angle typically 1:1.5 slope maintaining batters back to stable ground. If installing shoring, progressively install shores as excavation depth increases, never allowing unsupported excavation to exceed 1.5 metres depth. Remove and stockpile excavated material minimum 2 metres from excavation edge to prevent surcharge loading. Monitor excavation walls continuously for signs of instability including cracks or seepage. Install perimeter edge protection barriers at 1.2 metres from excavation edge to prevent falls into excavation. Establish dewatering if groundwater enters excavation, pumping water to approved discharge location.

Safety considerations

Excavation collapse can bury workers within seconds with survival dependent on immediate rescue rarely achievable before asphyxiation. Never allow workers to enter excavations exceeding 1.5 metres depth unless walls are properly battered or shored. Groundwater reduces soil stability and can trigger collapse. Vibration from nearby traffic or equipment can cause sudden collapse of apparently stable excavation walls.

3

Sand Base Preparation and Level Setting

With excavation completed to design depth and stability measures in place, inspect excavation base for soft spots, organic material, or unstable soils requiring removal and replacement with compacted fill. Compact excavation base using vibratory plate compactor to create stable bearing surface. Place 100-150mm depth of clean sand on excavation base and spread to approximately level surface. Using laser level or string lines, establish precise finish levels for pool shell installation accounting for pool shell base thickness. Screed sand base to exact levels using straight edge screed boards, verifying levels at multiple points across excavation base. Sand base must be within 10mm of design level across entire area. Compact sand base lightly to stabilize surface without excessive densification that would prevent future adjustment. Before entering excavation for sand preparation work, conduct atmospheric monitoring verifying oxygen levels and absence of toxic gases, issue confined space entry permit, and position standby rescue personnel at excavation edge.

Safety considerations

Pool excavations exceeding 1.5m depth are confined spaces requiring entry permits and atmospheric monitoring. Oxygen can be depleted at excavation bottom particularly in still air conditions. Groundwater can rapidly flood excavations creating drowning risk. Workers in excavations must wear harnesses connected to rescue tripods allowing rapid extraction if collapse or flooding occurs.

4

Crane Setup and Lifting Plan Implementation

Position crane on stable ground at location providing direct lift path from pool shell delivery location to excavation without passing load over buildings or occupied areas. Deploy outriggers fully and verify ground beneath outrigger pads is stable, using timber mats or steel plates if ground is soft. Verify crane setup provides minimum 3 metre clearance from all overhead power lines or arrange power authority isolation if clearances cannot be maintained. Conduct lift planning meeting with crane operator, dogman, and ground crew covering shell weight, rigging method, exclusion zones, communication signals, and emergency procedures. Attach lifting straps to pool shell at manufacturer-specified lifting points, typically at pool beam or reinforced attachment points, verifying load is distributed evenly across all lifting points. Connect rigging to crane hook using appropriate shackles and verify all connections are properly secured. Attach tag lines to pool shell corners allowing ground crew to guide shell while maintaining 4 metre distance from suspended load. Establish exclusion zones marked with barriers and ensure all non-essential personnel are clear of lifting area.

Safety considerations

Dropped pool shells weighing up to 3 tonnes can cause fatal crushing injuries. Exclusion zones must be rigorously enforced with no personnel permitted within 4 metres of suspended loads. Rigging must be positioned at manufacturer-specified points or shell can fracture during lifting. Ground workers must use tag lines and never approach suspended loads to steady or guide them manually. Overhead power line contact can electrify shell and crane causing electrocution.

5

Pool Shell Lifting and Precise Placement

Following crane operator's confirmation of readiness, perform test lift of pool shell to approximately 300mm height and hold to verify rigging security and crane stability. If test lift is satisfactory, proceed with lifting shell to sufficient height to clear excavation edges and obstructions. Crane operator must perform lift smoothly without sudden acceleration or deceleration that creates dynamic loading. Ground crew using tag lines guide shell toward excavation maintaining position outside exclusion zones. As shell approaches excavation, crane operator reduces lift speed and ground crew guides shell into alignment with excavation. Lower shell slowly into excavation, verifying clearance from excavation walls on all sides. Position shell on sand base with manufacturer's specified orientation and alignment. Lower crane hook removing load from rigging and verify shell is stable on sand base before releasing rigging connections. Workers may enter excavation to verify shell level and make minor adjustments to sand base if required, working under confined space entry permit with atmospheric monitoring and rescue capability in place. Once shell position is verified satisfactory, place water into shell to depth of approximately 300mm to provide ballast and prevent flotation during backfilling.

Safety considerations

Shell alignment during lowering into excavation requires precision to prevent striking excavation walls which can damage shell or trigger wall collapse. Workers must remain clear of areas between shell and excavation walls where they could be crushed if shell swings. Water must be placed in shell immediately after installation to prevent flotation when backfilling commences. Any adjustment of shell position requiring excavation entry must be performed under confined space controls.

6

Progressive Backfilling with Level Monitoring

With pool shell positioned and initial water ballast placed, commence backfilling around shell perimeter using clean sand or crusher dust free from organic material, large rocks, or debris. Place backfill in layers not exceeding 300mm depth, working around entire pool shell perimeter to maintain even pressure on all sides. Compact each layer using hand-operated compaction equipment or water flooding technique to eliminate voids. As backfilling proceeds, maintain water level inside pool shell approximately 300mm above external backfill level to prevent shell wall distortion from external pressure. Monitor pool shell for any movement, bulging, or distortion during backfilling and stop work if shell shows signs of stress. Make plumbing connections for filtration, returns, skimmers, and drainage as backfilling reaches relevant levels, pressure testing connections before covering with additional backfill. Continue backfilling and compaction until backfill level reaches design height typically 100-200mm below finished ground level. Verify shell remains at correct level and alignment after backfilling is complete. Allow backfill to settle for minimum 24 hours before proceeding with coping installation or pool commissioning.

Safety considerations

External backfill pressure can crush pool shells if water ballast inside shell is insufficient. Backfill containing large rocks or debris can puncture or crack fibreglass shells. Void spaces in backfill can cause shell settlement or collapse requiring costly rectification. Workers operating mechanical compaction equipment must wear hearing protection and manage hand-arm vibration exposure through work rotation.

7

Electrical Installation and Testing by Licensed Electrician

Engage licensed electrician to install pool electrical systems including lighting, filtration pump power, heating equipment, and control systems in accordance with AS/NZS 3000 requirements. Electrician installs bonding conductors connecting pool shell, metallic pipework, pump motors, and other metallic equipment to equipotential bonding point. Extra-low voltage pool lighting supplied through isolation transformer located minimum 3.5 metres from pool water edge is installed in manufacturer-specified locations in shell wall. RCD protection rated at 30mA is installed protecting all pool electrical circuits. Electrical equipment maintains specified clearances from pool water edge. Following installation completion, electrician conducts electrical testing including insulation resistance, earth continuity, and RCD function testing. Testing results are documented and electrical compliance certificate is issued confirming installation complies with Australian Standards. Pool owner is provided with electrical safety information covering RCD testing frequency, prohibition on using electrical equipment near pool, and emergency isolation procedures. Pool electrical system is not energized until testing is complete and compliance certificate is issued.

Safety considerations

Pool electrocution incidents cause multiple fatalities annually in Australia particularly affecting children. All pool electrical work must be performed by licensed electricians holding appropriate pool-specific qualifications. Non-compliant installations can energize pool water creating fatal electrocution risks. RCD protection is essential final safety measure but cannot substitute for correct installation complying with bonding and clearance requirements.

Frequently asked questions

What are the main safety risks in fibreglass pool installation?

The primary safety risks include excavation collapse potentially burying workers in excavations typically 1.8-2.5 metres deep, underground service strikes causing electrocution from power cables or explosions from gas lines, crane lifting incidents where pool shells weighing up to 3 tonnes could fall causing fatal crushing injuries, confined space hazards in deep excavations including oxygen depletion and difficulty escaping if flooding or partial collapse occurs, manual handling injuries from extensive backfilling and plumbing work in awkward postures, and electrocution risks from pool electrical systems if installations don't comply with Australian Standards requirements. Each of these hazards has caused serious injuries and fatalities in the pool construction industry. Comprehensive risk assessment and implementation of engineering controls for excavation stability, administrative controls for service location and crane operations, and use of licensed electricians for pool electrical work are essential to prevent incidents.

Do pool excavations require shoring or can they be left unsupported?

Under Australian WHS regulations, excavations exceeding 1.5 metres depth must be protected against collapse through shoring, battering to stable angles, or benching if workers will enter the excavation. Pool excavations typically 1.8-2.5 metres deep definitely require collapse prevention measures. The choice between shoring and battering depends on site constraints. Battering involves cutting excavation sides at angles typically 1:1.5 for cohesive soils or 1:2 for granular soils, creating stable slopes but requiring excavation of larger areas which may not be possible in confined residential settings. Shoring using trench boxes or hydraulic shores allows vertical excavation walls in smaller areas but requires engineering design and installation by competent workers. The method must be determined based on soil type, groundwater conditions, excavation depth, and available space. Geotechnical assessment should specify required battering angles or shoring requirements for site conditions. Regardless of method chosen, excavations must be inspected daily before worker entry and after rainfall or vibration events.

What qualifications are required for crane operators and riggers in pool installation?

Crane operators must hold high-risk work licenses specific to the crane class being operated - typically CN (crane capacity to 100 tonnes) or higher depending on pool shell weight and crane size required. The license class must match or exceed the crane rating. Riggers and dogmen directing crane operations must hold appropriate dogging licenses (DG for basic dogging or RB for rigging work) authorising them to select rigging equipment, attach loads, and direct crane operators. These are nationally recognised high-risk work licenses requiring formal training and assessment by registered training organisations, with licenses valid for five years before renewal. Additionally, riggers should have specific training in pool shell handling understanding manufacturer requirements for lifting point locations and load distribution. Generic crane operation experience is insufficient as pool shells are relatively fragile high-value items that can fracture if incorrectly rigged. Operators should be familiar with exclusion zone requirements and emergency procedures for suspended load incidents. License verification must be conducted before personnel are permitted to perform crane or rigging work on pool installation projects.

How do I prevent pool shell damage during backfilling operations?

Pool shell damage during backfilling typically results from external pressure crushing the shell, large rocks or debris in backfill puncturing the fibreglass, or uneven backfilling creating stress concentrations. Prevention requires maintaining water ballast inside the pool shell at levels approximately 300mm above external backfill level throughout backfilling operations, providing internal pressure that counteracts external backfill pressure. Use clean sand or crusher dust free from rocks, organic material, or debris as backfill material - never use excavated material containing rocks or construction debris. Place backfill in uniform layers around the entire shell perimeter maintaining equal levels on all sides rather than completing one side before another which creates unbalanced pressure. Compact backfill thoroughly using mechanical compaction equipment or water flooding to eliminate voids that could cause shell settlement after installation. Monitor shell walls for any bulging or distortion during backfilling and stop work immediately if shell shows stress signs. Some installers use laser monitoring to detect any shell movement during backfilling. Following manufacturer specifications for backfill material type, placement sequence, and water ballast levels prevents the majority of shell damage incidents.

What atmospheric hazards exist in pool excavations requiring confined space controls?

Pool excavations exceeding 1.5 metres depth can develop oxygen-deficient atmospheres particularly at excavation bottom where heavier-than-air gases accumulate in still air conditions. Oxygen depletion below 19.5% can occur from decomposition of organic material in soil, displacement by heavier gases, or consumption by oxidation processes. Carbon dioxide from soil respiration or decomposing organic matter can accumulate at excavation bottom causing unconsciousness and death as it is heavier than air and odourless. Hydrogen sulfide from disturbed sewers, decomposing sewage in soil, or certain geological formations creates toxic atmospheres causing death at concentrations as low as 700ppm with characteristic rotten egg smell providing warning only at lower concentrations. Methane from decomposing organic material or landfill sites creates explosive atmospheres and displaces oxygen. Confined space entry controls require atmospheric monitoring using calibrated multi-gas meters measuring oxygen, carbon monoxide, hydrogen sulfide, and explosive gases before each entry and continuously during work periods. Mechanical ventilation may be required if contaminants are detected. Rescue equipment including tripods and winches enable emergency extraction if workers are overcome by atmospheric hazards.

What electrical safety standards apply to swimming pool installations in Australia?

Swimming pool electrical installations must comply with AS/NZS 3000 Wiring Rules with specific requirements in Section 6 covering electrical installations in swimming pool areas. Key requirements include all pool electrical circuits protected by RCDs rated at maximum 30mA, pool lighting using extra-low voltage (12V or 24V) supplied through safety isolating transformers located minimum 3.5 metres from pool water edge, bonding of all metallic components including pool shell structural elements, pipework, pump motors, and equipment to create equipotential zone preventing voltage differences, electrical equipment maintaining specified clearances from pool water edge typically 3.5 metres for standard equipment and 1.5 metres for double-insulated equipment, and cable routes positioned to prevent mechanical damage and maintain required depths where buried. Additional requirements cover underwater lighting installations, control and switchboard locations, and testing procedures. All electrical work must be performed by licensed electricians, installations must be tested verifying insulation resistance and earth continuity, and electrical compliance certificates must be issued before pool commissioning. Non-compliant installations create electrocution risks that have caused multiple pool-related deaths in Australia particularly affecting children in contact with energized pool water.

Related SWMS documents

Browse all documents
Trusted by 1,500+ Australian construction teams

Fibreglass Pool Installation SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.