Safe Work Method Statement Example

Comprehensive SWMS examples and templates for Australian construction sites. Learn what makes an effective safe work method statement with real-world examples.

What Makes a Good Safe Work Method Statement Example?

A well-crafted safe work method statement example should be comprehensive, clear, and tailored to specific work activities. The best SWMS examples include detailed hazard identification, practical control measures, and step-by-step work procedures that workers can easily follow on-site.

Whether you're looking for a free SWMS template or need guidance on creating your own, understanding what goes into an effective safe work method statement is crucial for workplace safety and compliance.

Detailed Safe Work Method Statement Example: Scaffolding

Project Information

Project Name:

Commercial Building Construction - Level 5

Location:

123 Construction St, Sydney NSW

Date:

6/4/2025

SWMS Reference:

SWMS-SCAF-001

Task Description

Erection, alteration, and dismantling of scaffolding structures up to 4 meters in height for facade work on a commercial building project.

Hazard Identification & Risk Assessment

HazardRiskRisk RatingControl MeasuresResidual Risk
Working at heightsFalls from scaffoldingHigh
  • Install guardrails on all platforms
  • Use safety harnesses when erecting
  • Ensure 3-point contact at all times
Medium
Manual handlingMusculoskeletal injuriesMedium
  • Team lifting for heavy components
  • Use mechanical aids where possible
  • Regular breaks and job rotation
Low
Falling objectsStruck by falling tools/materialsHigh
  • Exclusion zones below work areas
  • Tool lanyards for all hand tools
  • Toe boards on all platforms
Low

Step-by-Step Work Procedure

  1. Pre-start safety briefing: Conduct toolbox talk covering all hazards and controls. Ensure all workers have signed onto this SWMS.
  2. Site preparation: Establish exclusion zones using barriers and signage. Check ground conditions and install sole boards if required.
  3. Equipment inspection: Inspect all scaffolding components for damage. Remove any defective items from service and tag accordingly.
  4. Base setup: Install base plates on firm, level ground. Use adjustable base jacks to ensure level foundation.
  5. Standards installation: Erect standards (vertical tubes) ensuring they are plumb. Connect with ledgers at required heights.
  6. Platform installation: Install scaffold planks ensuring full coverage. Secure all planks to prevent movement.
  7. Safety features: Install guardrails (top and mid-rail), toe boards, and access ladders. Ensure all safety features meet AS/NZS standards.
  8. Final inspection: Conduct thorough inspection and complete scaffold tag. Only green-tagged scaffolds to be used.

Required PPE

👷

Hard Hat

🦺

Hi-Vis Vest

👢

Safety Boots

🧤

Work Gloves

This scaffolding SWMS example demonstrates the level of detail required for high-risk construction work. Your actual SWMS should be customized to your specific site conditions and requirements.

Safe Work Method Statement Examples by Trade

Electrical SWMS Example

Installation of power points and lighting circuits in residential buildings

Key Hazards:

  • Electrical shock/electrocution
  • Arc flash burns
  • Working in confined spaces
  • Asbestos exposure in older buildings

Critical Controls:

  • Lockout/tagout procedures
  • Test before touch protocols
  • Insulated tools and PPE
  • Permit to work systems

Carpentry SWMS Example

Timber frame construction and formwork installation

Key Hazards:

  • Cuts from power tools
  • Nail gun injuries
  • Manual handling strains
  • Dust inhalation

Critical Controls:

  • Tool guards and safety switches
  • Proper lifting techniques
  • Dust extraction systems
  • Regular tool maintenance

Demolition SWMS Example

Partial demolition of internal walls and fixtures

Key Hazards:

  • Structural collapse
  • Asbestos and lead exposure
  • Flying debris
  • Noise and vibration

Critical Controls:

  • Engineering assessment
  • Asbestos survey and removal
  • Exclusion zones
  • Dust suppression systems

Downloading Templates vs. Generating Custom SWMS

AspectGeneric TemplatesAI-Generated SWMS
CustomizationRequires manual editing to fit your projectAutomatically tailored to your specific needs
Time to Complete30-60 minutes of editingUnder 3 minutes
ComplianceMay not cover all your specific hazardsAddresses your exact work scope
UpdatesStatic document, becomes outdatedEasy to regenerate with new requirements
CostFree but time-consumingSmall fee, massive time savings

While generic templates provide a starting point, our AI-powered SWMS generator creates comprehensive, job-specific safe work method statements in minutes.

"We used to spend hours modifying generic SWMS templates for each job. Now with OneClick SWMS, we generate perfectly tailored safe work method statements in minutes. The examples it produces are more comprehensive than anything we could download online."

Michael Chen

Safety Manager, BuildRight Construction

Frequently Asked Questions

What should a safe work method statement example include?

A comprehensive SWMS example should include project details, task descriptions, hazard identification with risk ratings, detailed control measures, step-by-step procedures, required PPE, emergency procedures, and spaces for worker acknowledgment.

Are generic SWMS examples legally compliant?

While generic examples can provide guidance, they must be customized to your specific workplace and tasks to be legally compliant. Australian WHS laws require SWMS to address the actual hazards present at your worksite, not just generic risks.

How often should SWMS examples be updated?

SWMS should be reviewed and updated whenever work conditions change, new hazards are identified, after incidents, or at least annually. Using an AI-powered generator makes it easy to create updated versions as needed.

Can I use the same SWMS example for different projects?

While similar tasks may have common elements, each SWMS should be tailored to the specific project, location, and conditions. Even the same task can have different hazards on different sites due to environmental factors, nearby activities, or site-specific requirements.

Create Your Own Safe Work Method Statement

Stop wasting time editing generic templates. Generate professional, compliant SWMS tailored to your exact requirements in under 3 minutes.

No credit card required • Generate your first SWMS free