Construction night works SWMS, drafted for your job
Dark work areas can hide excavation edges and approaching plant, while glare, fatigue and fewer people nearby make communication and emergency access harder. Describe the job and site so your SWMS is drafted around them, then check the controls on site before work starts.
A$39per job
However many high-risk activities it covers.
- However many high-risk activities it covers.
- 3 for A$99
- 10 for A$249
- Yearly A$129 for 120
- Monthly A$60 for 10
You review it on site before work starts.
Your Business
Safe Work Method Statement
Version 1
Draft
Construction night works
Site Your site address
Law Your state
High-risk construction work
- Work next to a road, railway or other traffic corridor in use
- Work where powered mobile plant is moving
Job steps, hazards and controls
| 1 | Plan the night shift | Fatigue and reduced site support | High | Set rest arrangements and confirm emergency contacts and access |
| 2 | Set lights and barriers | Glare and unseen excavation edges | High | Inspect approaches and light protected walking routes |
| 3 | Brief the night crew | Missed movement signals | High | Test radios and agree stop signals before plant moves |
| 4 | Carry out night operations | Hidden workers and declining alertness | High | Keep routes separated and reassess lighting as work moves |
| 5 | Hand over the site | Unlit hazards after shift change | Medium | Secure unfinished areas and brief the incoming crew |
Illustrative first page. Yours carries your business name only.
What you get
What your construction night works SWMS will contain
An A4 document your crew can read on site, a PDF for the builder and a sign-on register.
- Job and site detailsYour business, the site, the principal contractor, the dates.
- High-risk construction workThe categories your job involves, ticked.
- Step-by-step methodEach step with its hazards, risk rating and controls.
- How controls are checkedWho puts each control in place, monitors and reviews it.
- PPE, plant and permitsEquipment and training the job needs.
- Emergency planAssembly point, first aid, nearest hospital to confirm on site.
- Consultation and reviewWho was consulted, when it is reviewed.
- Sign-on registerYour crew signs by QR or on paper.
High-risk construction work
Categories this task often involves
You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.
- Work next to a road, railway or other traffic corridor in use
- Work where powered mobile plant is moving
State notes
Rules depend on your state
Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.
Hazards and controls
What goes wrong on a construction night works job, and how the SWMS controls it
These rows are written for this task. Your draft adds the ones your site and method need.
- 1
Workers hidden in shadows beside operating plant at night
High- Separate walking routes from plant movements with physical barriers
- Light crossing points and stop plant when the operator loses sight of a worker
- 2
Tower lights dazzling drivers approaching the night work zone
High- Position and aim lights away from approaching traffic and plant cabs
- Check the approach view and adjust shadows before opening the work area
- 3
Fatigue reducing attention during repetitive night construction tasks
High- Plan shifts and task demands around rest and recovery opportunities
- Check crew alertness during the shift and stop safety-critical work when attention deteriorates
- 4
Falls into excavation edges beyond the lit night work area
High- Barrier exposed edges and close unused access routes
- Extend task lighting along the whole walking route before workers enter
- 5
Missed radio calls between scattered night work crews
High- Agree a radio channel and test coverage across the work zone
- Stop coordinated movements when communication is lost and use a shared stop signal
- 6
Delayed help reaching an isolated night work location
High- Keep emergency access open and mark the crew location for responders
- Assign contact and headcount duties and check communications before other site staff leave
How the job usually runs
- 1Plan the night shiftFatigue and reduced site support → Set rest arrangements and confirm emergency contacts and access
- 2Set lights and barriersGlare and unseen excavation edges → Inspect approaches and light protected walking routes
- 3Brief the night crewMissed movement signals → Test radios and agree stop signals before plant moves
- 4Carry out night operationsHidden workers and declining alertness → Keep routes separated and reassess lighting as work moves
- 5Hand over the siteUnlit hazards after shift change → Secure unfinished areas and brief the incoming crew
PPE for this job
- High-visibility clothing suited to night work
- Safety boots
- Safety helmet
- Task eye protection
- Weather protection
Your draft lists the PPE your site and method need.
After you finalise
Brief your crew and send it to your builder
Crew signs by QR
Send to my builder
PDF and register
Builder sent it back?
Make their changes and re-issue the same job free. Workers re-sign the new version.
Questions
Construction night works SWMS questions
- Last reviewed
- 21 October 2026
- How
- Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
- Next review
- Every six months, or when the method or rules change
What should we check before night work begins?
Walk the site with the lighting operating. Check shadows, traffic approaches, excavation barriers and the route to amenities, then test radios and confirm who can respond if an incident occurs.
How does the SWMS deal with night shift fatigue?
Describe the shift pattern, travel demands and tasks that need sustained attention. Include planned recovery breaks, crew check-ins and who can stop or reassign work when someone becomes too tired to continue.
How much does a construction night works SWMS cost?
One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.
Is this a template?
No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.
Who checks the SWMS?
You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.
My builder sent it back. What now?
Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.
How does my crew sign it?
Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.
Does it work in my state?
Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.
Related
Related SWMS






