Skip to content
OneClickSWMS
CivilHigh-risk work

Construction night works SWMS, drafted for your job

Start with your job

Which state is the site in?

Preview from a reviewed example. No account needed.

Dark work areas can hide excavation edges and approaching plant, while glare, fatigue and fewer people nearby make communication and emergency access harder. Describe the job and site so your SWMS is drafted around them, then check the controls on site before work starts.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Construction night works

Site Your site address

Law Your state

High-risk construction work

  • Work next to a road, railway or other traffic corridor in use
  • Work where powered mobile plant is moving

Job steps, hazards and controls

1Plan the night shiftFatigue and reduced site supportHighSet rest arrangements and confirm emergency contacts and access
2Set lights and barriersGlare and unseen excavation edgesHighInspect approaches and light protected walking routes
3Brief the night crewMissed movement signalsHighTest radios and agree stop signals before plant moves
4Carry out night operationsHidden workers and declining alertnessHighKeep routes separated and reassess lighting as work moves
5Hand over the siteUnlit hazards after shift changeMediumSecure unfinished areas and brief the incoming crew
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your construction night works SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work next to a road, railway or other traffic corridor in use
  • Work where powered mobile plant is moving
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a construction night works job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Workers hidden in shadows beside operating plant at night

    High
    • Separate walking routes from plant movements with physical barriers
    • Light crossing points and stop plant when the operator loses sight of a worker
  2. 2

    Tower lights dazzling drivers approaching the night work zone

    High
    • Position and aim lights away from approaching traffic and plant cabs
    • Check the approach view and adjust shadows before opening the work area
  3. 3

    Fatigue reducing attention during repetitive night construction tasks

    High
    • Plan shifts and task demands around rest and recovery opportunities
    • Check crew alertness during the shift and stop safety-critical work when attention deteriorates
  4. 4

    Falls into excavation edges beyond the lit night work area

    High
    • Barrier exposed edges and close unused access routes
    • Extend task lighting along the whole walking route before workers enter
  5. 5

    Missed radio calls between scattered night work crews

    High
    • Agree a radio channel and test coverage across the work zone
    • Stop coordinated movements when communication is lost and use a shared stop signal
  6. 6

    Delayed help reaching an isolated night work location

    High
    • Keep emergency access open and mark the crew location for responders
    • Assign contact and headcount duties and check communications before other site staff leave

How the job usually runs

  1. 1Plan the night shiftFatigue and reduced site support → Set rest arrangements and confirm emergency contacts and access
  2. 2Set lights and barriersGlare and unseen excavation edges → Inspect approaches and light protected walking routes
  3. 3Brief the night crewMissed movement signals → Test radios and agree stop signals before plant moves
  4. 4Carry out night operationsHidden workers and declining alertness → Keep routes separated and reassess lighting as work moves
  5. 5Hand over the siteUnlit hazards after shift change → Secure unfinished areas and brief the incoming crew

PPE for this job

  • High-visibility clothing suited to night work
  • Safety boots
  • Safety helmet
  • Task eye protection
  • Weather protection

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Construction night works SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
What should we check before night work begins?

Walk the site with the lighting operating. Check shadows, traffic approaches, excavation barriers and the route to amenities, then test radios and confirm who can respond if an incident occurs.

How does the SWMS deal with night shift fatigue?

Describe the shift pattern, travel demands and tasks that need sustained attention. Include planned recovery breaks, crew check-ins and who can stop or reassign work when someone becomes too tired to continue.

How much does a construction night works SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS