Hot mix arrives at the hopper while screed hands work beside moving augers, trucks and rollers. Describe the paving run, delivery route and site: the draft follows that setup, and your crew checks the controls before paving starts.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Asphalt paver

Site Your site address

Law Your state

High-risk construction work

  • Work where powered mobile plant is moving
  • Work next to a road, railway or other traffic corridor in use

Job steps, hazards and controls

1Plan the paving runTrucks crossing pedestrian routesHighBarrier the delivery route and agree spotter signals
2Inspect paver and screedExposed auger and damaged guardsHighCheck guards, stops and screed controls before starting
3Receive hot mixHopper splash and truck crushHighClear hopper approaches and use the nominated spotter
4Lay and finish asphaltFumes and roller movementsHighUse extraction and separate rollers from screed hands
5Shut down and clear feedStored energy in augersHighIsolate, cool and secure components before clearing
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your asphalt paver SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where powered mobile plant is moving
  • Work next to a road, railway or other traffic corridor in use
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a asphalt paver job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Burns from hot mix spilling at the paver hopper

    High
    • Keep ground crew outside the hopper loading area during tipping
    • Use long-handled tools and heat-resistant gloves when handling hot mix
  2. 2

    Entanglement at the paver auger and feed conveyors

    Extreme
    • Keep auger guards and conveyor covers fitted during paving
    • Stop, isolate and release stored energy before clearing material build-up
  3. 3

    Crushing between delivery trucks and the paver hopper

    Extreme
    • Separate truck approach and pedestrian routes with barriers
    • Use one nominated spotter and stop movement when contact is lost
  4. 4

    Pinching beside moving screed extensions during width changes

    High
    • Clear people from the screed extension path before adjusting width
    • Confirm the screed operator can see the adjustment area
  5. 5

    Asphalt fumes collecting around the screed operator station

    High
    • Position the paving run to reduce exhaust and fume exposure
    • Use the paver extraction system and stop if fumes obscure the work
  6. 6

    Roller strikes behind the asphalt paver during finishing

    High
    • Keep roller travel separate from screed hands and handwork areas
    • Agree signals between paver and roller operators before each run

How the job usually runs

  1. 1Plan the paving runTrucks crossing pedestrian routes → Barrier the delivery route and agree spotter signals
  2. 2Inspect paver and screedExposed auger and damaged guards → Check guards, stops and screed controls before starting
  3. 3Receive hot mixHopper splash and truck crush → Clear hopper approaches and use the nominated spotter
  4. 4Lay and finish asphaltFumes and roller movements → Use extraction and separate rollers from screed hands
  5. 5Shut down and clear feedStored energy in augers → Isolate, cool and secure components before clearing

PPE for this job

  • Heat-resistant gloves
  • Safety boots
  • High-visibility clothing
  • Long work clothing
  • Eye protection
  • Hearing protection

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Asphalt paver SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Does it cover trucks feeding the asphalt paver?

Yes. The draft covers truck approaches, a nominated spotter, keeping workers out of the hopper area and stopping delivery movements when communication breaks down.

Can it include screed hands and rollers together?

Yes. Describe who works behind the screed and how rollers follow the paving run. The draft covers separate work areas, width changes and agreed signals between operators.

How much does a asphalt paver SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS