Safe Work Method Statement for Road Shoulder Grading Operations

Civil Shoulder Grading SWMS

Australian WHS Compliant

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Civil shoulder grading is a critical road maintenance and construction activity involving the shaping, levelling, and compacting of road shoulders to ensure proper drainage, structural support, and safe recovery zones for errant vehicles. This work typically employs motor graders, bulldozers, or specialised shoulder grading equipment to achieve specified cross-fall gradients, remove vegetation, reshape eroded shoulders, and establish stable edge conditions. Shoulder grading operations present significant hazards including machinery rollover on steep slopes, grade slippage in unstable soil conditions, interaction with passing traffic, dust generation affecting visibility, and environmental impacts from soil disturbance and sediment runoff. This Safe Work Method Statement provides comprehensive guidance for safely executing shoulder grading activities in accordance with Australian WHS legislation, relevant Australian Standards including AS 3798 for roadworks, and industry best practices for civil construction operations.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Civil shoulder grading encompasses the systematic reshaping, levelling, and compaction of road shoulders to restore or establish proper drainage characteristics, structural support for the pavement edge, and safe vehicle recovery zones. This activity is fundamental to road maintenance and construction programs across Australia, addressing issues such as shoulder drop-off from pavement edge settlement, erosion from inadequate cross-fall drainage, vegetation encroachment reducing shoulder width, and rutting from heavy vehicle tracking. Shoulder grading operations typically employ motor graders as the primary equipment, supplemented by bulldozers for heavy reshaping work, excavators for drainage improvements, and compaction equipment to achieve specified density requirements. The scope of shoulder grading work varies significantly based on road classification, traffic volumes, environmental conditions, and project specifications. Urban roadworks may involve tight constraints working adjacent to kerbing, driveways, and utilities, requiring precision grading within confined spaces while managing constant traffic interaction. Rural highway shoulder grading often covers extensive lineal distances with wider shoulders and steeper batter slopes, presenting different challenges related to slope stability, equipment mobility on varied terrain, and remote work location considerations. Grading depths typically range from 50-150mm for light reshaping to 300mm or more for substantial shoulder reconstruction involving imported material placement. Shoulder grading operations must achieve specified geometric outcomes including appropriate cross-fall gradients to facilitate drainage away from the pavement (typically 4-6% depending on surface type and road authority standards), smooth longitudinal grades matching the pavement profile without abrupt transitions, and proper compaction levels to support shoulder use by vehicles. The work integrates closely with other civil activities including drainage installation or repair, pavement edge support, erosion control implementation, and final surface treatment through sealing or turfing. Environmental management is critical, with shoulder disturbance potentially causing sediment-laden runoff, disturbing contaminated soils, or impacting sensitive vegetation communities. Grading equipment operators must possess current licenses, appropriate experience operating on road corridors, and thorough understanding of road geometry principles and soil behaviour characteristics. Supporting personnel include traffic controllers managing work zone safety, labourers performing hand finishing around obstacles, water cart operators for dust suppression, and supervisory staff ensuring compliance with specifications and safety requirements. The work often operates under road authority permits specifying permitted hours, traffic management requirements, environmental controls, and completion timeframes, making coordination and planning essential for successful project delivery while maintaining safety standards throughout operations.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Shoulder grading operations present significant workplace health and safety risks that have resulted in serious incidents and fatalities across the Australian construction industry. The combination of heavy mobile plant operating on sloped terrain, proximity to live traffic flows, unstable soil conditions, and environmental factors creates a hazardous work environment requiring comprehensive safety management through detailed Safe Work Method Statements. Under the Work Health and Safety Act 2011 and associated regulations, shoulder grading activities constitute high-risk construction work, specifically including work on roads where traffic speed exceeds 40 km/h and the use of earthmoving equipment in potentially unstable conditions. Persons conducting a business or undertaking (PCBUs) have explicit legal obligations to prepare, implement, and review SWMS before commencing such high-risk activities, with failure to comply resulting in significant penalties and potential prosecution following serious incidents. The most critical hazard in shoulder grading operations is machinery rollover, which remains a leading cause of construction fatalities in Australia. Motor graders and bulldozers operating on shoulder slopes, particularly when reshaping steep batters or working near soft shoulder edges, face substantial rollover risks if ground conditions fail, equipment overbalances during blade extension, or operators misjudge slope angles and soil bearing capacity. Unlike controlled grading on stable platforms, shoulder work occurs on variable terrain where one side of the machine may be on the sealed pavement while the other operates on loose fill material, creating uneven loading and reduced stability. Safe Work Australia data consistently identifies mobile plant rollovers as high-consequence events, with the enclosed cab structures of graders and dozers sometimes insufficient to protect operators during severe rollover incidents, particularly on steep embankments where machines may roll multiple times before coming to rest. Traffic interaction hazards compound operational risks, with shoulder grading requiring equipment to operate immediately adjacent to live traffic lanes where vehicles may be travelling at high speeds. Despite traffic management controls including reduced speed limits, warning signage, and potential lane closures, the risk of vehicle incursions into work zones remains ever-present. Inattentive drivers, impaired motorists, or vehicles experiencing mechanical failures can rapidly enter work areas, creating collision hazards with both grading equipment and ground personnel. Night works, increasingly common to minimise traffic disruption, amplify these risks through reduced visibility despite enhanced lighting and reflective traffic control devices. The consequences of traffic-related incidents in these scenarios are typically catastrophic given the mass and speed differentials involved. From a compliance and business perspective, comprehensive SWMS provide essential protection against regulatory action and civil liability. WorkSafe authorities across Australian states actively monitor roadworks activities, with inspectors empowered to issue prohibition notices immediately stopping work where adequate SWMS are not in place or are not being followed. Following serious incidents, inadequate SWMS documentation or failure to implement documented controls becomes a primary focus of investigations, potentially leading to substantial penalties for organisations and individual officers. Beyond regulatory compliance, effective SWMS support operational efficiency by establishing clear procedures reducing time spent on site briefings, providing consistent approaches across multiple crews and locations, and facilitating better communication with road authorities, clients, and other stakeholders regarding safety measures being implemented. Insurance providers increasingly require evidence of comprehensive SWMS and safety management systems when underwriting civil construction work, with premium calculations reflecting an organisation's demonstrated safety performance and documentation quality.

Reinforce licensing, insurance, and regulator expectations for Civil Shoulder Grading Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

Machinery Rollover on Steep Slopes and Unstable Shoulders

High

Motor graders and bulldozers operating on shoulder slopes face significant rollover hazards when the ground beneath one side of the machine fails, equipment overbalances during blade extension on steep cross-falls, or operators misjudge safe working angles on batter slopes. Shoulder edges adjacent to pavement may appear stable but can collapse under equipment weight, particularly following rain events saturating fill material or when working over uncompacted loose shoulders. Graders operating with extended blades create asymmetric loading that reduces lateral stability, especially when cutting into higher ground on steep cross-slopes. Bulldozers working on steep batters to reshape shoulder profiles risk backward or sideways rollovers if soil shears beneath tracks or if the blade digs into resistant material creating a pivot point.

Grade Slippage During Operations in Soft or Wet Soil Conditions

High

Shoulder grading operations conducted in saturated soil conditions, areas with high clay content, or locations with poor subsurface drainage face risks of slope failure where the entire graded section slides downward taking equipment with it. This differs from equipment rollover in that the ground mass itself fails rather than the machine tipping. Heavy grading equipment operating on newly shaped shoulders that have not yet been compacted creates loading that can exceed soil bearing capacity, particularly when equipment tracks concentrate weight on limited areas. Groundwater seepage through shoulder material, common in cutting sections or areas with high water tables, reduces soil shear strength dramatically. Operators may not recognise unstable conditions until movement begins, at which point escape from sliding equipment becomes extremely difficult.

Traffic Interaction and Vehicle Incursion into Work Zones

High

Shoulder grading work occurs immediately adjacent to live traffic lanes where vehicles may be travelling at speeds of 60-110 km/h depending on road classification and traffic management arrangements. Despite traffic control measures including speed reductions, warning signage, and lane delineation, errant vehicles regularly encroach into work zones due to driver inattention, mobile phone use, impairment from fatigue or substances, or vehicle mechanical failures. Grading equipment operators focused on blade control and grade monitoring may have limited awareness of approaching vehicles, particularly when operating in reverse or when cab positioning provides restricted rear visibility. Ground workers including labourers hand-finishing around drainage structures, traffic controllers, and supervisory personnel face extreme exposure to passing traffic with minimal protection.

Dust Generation Affecting Visibility and Causing Respiratory Exposure

Medium

Grading operations in dry soil conditions generate substantial dust clouds that reduce visibility for both equipment operators and passing motorists, creating collision hazards and obscuring work zone delineation. Fine dust particles remain suspended in the air for extended periods, with prevailing winds carrying dust across traffic lanes potentially causing multi-vehicle incidents as motorists suddenly encounter zero-visibility conditions. Equipment operators breathing dust-laden air over full shifts face respiratory irritation and potential long-term effects, with silica-containing soils creating additional crystalline silica exposure risks requiring specific controls. Dust deposition on windscreens and safety glasses reduces visibility and creates additional hazard awareness difficulties for workers.

Proximity to Buried Services and Drainage Infrastructure

Medium

Road shoulders frequently contain buried services including telecommunications cables, electrical conduits for street lighting, water and sewer mains in urban areas, and stormwater drainage pipes and pits. Grading activities extending below the surface can strike these services causing damage, disruption to communities, and serious injury risks from electrical contact or pressurised water release. Service location records may be incomplete or inaccurate, particularly for older roads where infrastructure has been progressively added without comprehensive as-built documentation. Drainage pits and culvert ends represent physical obstacles that can damage grading blades and create sudden load changes potentially affecting equipment stability. Hidden voids around deteriorated pipe bedding can cause localised ground collapse when loaded by grading equipment.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Comprehensive Geotechnical Assessment and Slope Stability Analysis

Engineering Control

Before commencing shoulder grading operations, engage qualified geotechnical engineers to assess soil conditions, slope stability, and safe working parameters for the specific site. This eliminates rollover and slippage hazards by ensuring equipment operates only within verified safe conditions.

Implementation

1. Commission geotechnical investigation including test pits or boreholes at representative locations along the project to determine soil classification, moisture content, shear strength parameters, and bearing capacity 2. Obtain geotechnical report specifying maximum safe slope angles for equipment operation based on actual soil conditions, recommended compaction requirements, and any groundwater management measures needed 3. Develop site-specific safe work limits defining maximum cross-fall angles for grader operation (typically not exceeding 10-15 degrees), minimum distance from unprotected edges (typically 2-3 metres), and exclusion zones around known instabilities 4. Install physical markers such as marker posts or spray-painted lines delineating safe operating zones, ensuring operators can clearly identify boundaries from the equipment cab 5. Implement groundwater management including installation of dewatering systems, subsurface drainage, or work sequencing to avoid operations during wet conditions where geotechnical assessment identifies elevated risks 6. Require daily geotechnical inspections by competent person during operations, with authority to halt work if conditions deteriorate beyond assessed parameters

Grading Equipment Stability Systems and Operator Competency

Engineering Control

Specify and maintain grading equipment with enhanced stability features, and ensure all operators hold appropriate competencies and specific training for shoulder grading work.

Implementation

1. Utilise motor graders and bulldozers equipped with functioning Roll-Over Protective Structures (ROPS) certified to AS 2294, with regular structural inspections documented 2. Ensure all equipment fitted with operator presence seatbelts in good condition, with interlocks preventing operation when seatbelt unbuckled where available 3. Specify equipment with blade float control, allowing blade to follow ground contours without creating destabilising forces during shoulder shaping 4. Provide equipment with slope monitoring systems or inclinometers warning operators when approaching unsafe operating angles 5. Verify operators hold current National High Risk Work Licence for grader operation (where applicable) or appropriate state/territory plant operator qualifications 6. Conduct site-specific competency assessment including demonstration of blade control on slopes, emergency response procedures, and understanding of rollover hazards before authorising operations 7. Implement mandatory refresher training annually covering equipment stability principles, soil condition recognition, and incident case studies from shoulder grading rollovers

Traffic Management Systems Complying with AS 1742.3

Engineering Control

Design and implement comprehensive traffic management creating physical separation between work activities and passing vehicles, reducing speeds, and providing adequate warning to approaching motorists.

Implementation

1. Engage qualified traffic management designer holding appropriate qualifications to develop site-specific Traffic Guidance Scheme (TGS) addressing actual site conditions, traffic volumes, and speed environment 2. Submit TGS to relevant road authority for approval minimum 10 business days before work commencement, incorporating any required modifications 3. Install advance warning signs at calculated distances based on approach speeds: typically 90-180 metres for 60 km/h zones, up to 500 metres for 100 km/h zones 4. Deploy temporary speed limit signs reducing speeds through work zone, typically to 40 km/h or 60 km/h depending on separation distances and road classification 5. Position traffic cones or delineators creating visual separation between work zone and traffic lanes, with maximum spacing of 10 metres in accordance with AS 1742.3 6. Deploy traffic controllers at both ends of work zone for single-lane closures or where specified in road authority permit conditions 7. Install flashing warning lights (amber LEDs) on work vehicles and static signs to enhance conspicuity, particularly critical for night works and poor visibility conditions

Dust Suppression Through Water Application and Work Scheduling

Substitution / Engineering Control

Eliminate dust generation hazards through comprehensive water suppression systems and scheduling work during favourable environmental conditions.

Implementation

1. Deploy dedicated water cart with minimum 8,000-litre capacity operating continuously during grading activities, applying water immediately ahead of grading operations 2. Adjust water application rates based on soil type and weather conditions: higher rates for sandy soils and hot windy days, reduced rates for clay soils to avoid creating slippery conditions 3. Schedule grading operations during early morning or late afternoon when temperatures are lower and humidity higher, reducing dust generation potential 4. Suspend grading operations during extreme fire danger days or when weather forecasts predict high winds (above 40 km/h) that would render dust suppression ineffective 5. Apply polymer-based dust suppressants for longer-term dust control on completed shoulders awaiting final surface treatment, particularly in extended dry periods 6. Monitor dust generation continuously with authority for any worker to halt operations if dust clouds obscure visibility or create traffic hazards

Service Location and Positive Identification Procedures

Administrative Control

Implement systematic service location processes before grading, with verification procedures ensuring services are identified and protected.

Implementation

1. Submit Dial Before You Dig requests minimum 2 business days before work commencement, contacting all relevant asset owners 2. Engage qualified service locators to conduct ground-penetrating radar (GPR) and electromagnetic location surveys, marking all detected services with paint and marker posts 3. Establish service protection zones requiring blade height to remain minimum 300mm above known service depths, with prohibition on deep grading without physical exposure 4. Conduct hand digging trial holes (potholing) at 50-metre intervals or at all service crossings to verify depth and location before mechanical grading 5. Brief equipment operators on service locations daily, providing marked-up plans showing service positions relative to operating area 6. Appoint dedicated spotter for operations within 2 metres of known services, with communication to operator via UHF radio and authority to stop operations if service exposed or protection compromised

Environmental Management and Erosion Control Implementation

Administrative Control

Prevent environmental harm from shoulder grading through erosion control, sediment management, and vegetation protection measures.

Implementation

1. Install sediment fencing or silt socks along downslope edges before commencing grading, capturing sediment-laden runoff and preventing entry to waterways 2. Limit length of disturbed shoulder remaining unsealed at any time, typically maximum 500 metres, to reduce erosion potential from unexpected rain events 3. Grade shoulders in drainage-compliant configuration immediately upon completion, ensuring no ponding or concentrated flow paths that could cause erosion 4. Apply temporary stabilisation including hydromulch or geofabric to shaped shoulders if delays occur before final surface treatment 5. Inspect and maintain erosion control devices daily, clearing accumulated sediment and repairing damage from traffic or weather 6. Schedule grading operations to avoid working immediately before forecast rain events that could wash away loose material before compaction completed

Site Inspection and Pre-Start Verification Procedures

Administrative Control

Conduct comprehensive daily inspections ensuring site conditions remain within safe operating parameters established by risk assessment and engineering controls.

Implementation

1. Complete formal site inspection before each shift commencing work, documenting soil conditions, weather observations, traffic volumes, and any changes from previous operations 2. Verify traffic management devices remain correctly positioned and functional, replacing damaged signs or displaced cones immediately 3. Check equipment pre-start requirements including ROPS integrity, seatbelt function, hydraulic system operation, blade controls, and communication equipment 4. Assess shoulder stability through physical inspection and test loading where concerns exist about ground conditions, with authority to prohibit operations if instabilities detected 5. Conduct toolbox meetings briefing all workers on day's activities, specific hazards, emergency procedures, and any site-specific issues identified during inspection 6. Document all inspections and briefings in site records, with sign-off by supervisor confirming safe work authorisation

Personal protective equipment

High-Visibility Safety Vest

Requirement: Class D Day/Night vest complying with AS/NZS 4602.1 with minimum 0.2m² combined fluorescent and retroreflective material

When: Required for all personnel outside enclosed equipment cabs when operating adjacent to live traffic or within work zones where mobile plant is operating

Safety Footwear with Ankle Support

Requirement: Steel toe-capped boots with penetration-resistant midsole and ankle support for uneven terrain

When: Mandatory for all ground personnel conducting inspections, hand finishing work, or working around grading equipment on sloped surfaces

Respiratory Protection for Dust Exposure

Requirement: P2 particulate respirator as minimum protection for dust exposure; P3 respirator for silica-containing soils

When: Required when working in dust-generating activities where engineering controls do not reduce dust to below exposure standards, particularly during dry conditions

Hearing Protection

Requirement: Class 4 or 5 earmuffs or correctly fitted earplugs providing minimum 20dB noise reduction

When: Required for personnel working within 10 metres of operating graders, compactors, or other equipment generating noise above 85dB(A)

Sun Protection (Hat, Sunscreen, Sunglasses)

Requirement: Broad-brimmed hard hat or wide-brimmed hat with UPF 50+ rating, SPF 50+ broad-spectrum sunscreen, UV-protective safety glasses

When: Required for all outdoor work during daylight hours as primary control for UV radiation exposure and long-term skin cancer prevention

Two-Way Radio Communication Equipment

Requirement: UHF radio with minimum 5W output for reliable communication between equipment operators, traffic controllers, and supervisors

When: Required for all equipment operators and key personnel to enable rapid communication regarding traffic conditions, emergencies, and operational coordination

Inspections & checks

Before work starts

  • Verify current road authority permits in place and all permit conditions understood by site personnel
  • Confirm dial-before-you-dig responses received and service locations marked on ground and documented on plans
  • Inspect all traffic management devices before installation verifying signs clean and undamaged, reflectivity adequate, and cones/delineators in serviceable condition
  • Check weather forecast confirming no extreme conditions forecast that would prevent safe operations (high winds, severe storms, extreme heat)
  • Verify all equipment operators hold current licenses and specific authorisations for road corridor work
  • Conduct grading equipment pre-start inspections including ROPS structural integrity, seatbelt function, blade hydraulics, tyre condition and pressure, lights and beacons operation
  • Confirm water cart filled and operational for dust suppression throughout shift
  • Verify communication systems tested and functioning between all crew members
  • Inspect work area for any soil instabilities, soft ground conditions, or changes from previous shift
  • Ensure environmental controls (sediment fencing, erosion barriers) installed and maintained from previous work

During work

  • Monitor traffic management effectiveness continuously, adjusting or adding devices if traffic speeds or adherence to controls inadequate
  • Observe dust generation levels, increasing water application rates or suspending operations if dust obscures visibility
  • Check soil conditions hourly for any signs of instability, ground movement, or unexpected water seepage
  • Verify grading equipment remains within designated safe operating zones marked during planning phase
  • Monitor weather conditions, particularly wind speed and approaching storms that may require work suspension
  • Inspect blade wear and hydraulic system function, addressing any deterioration affecting precise grading control
  • Verify compaction equipment achieving specified density through test rolling or nuclear density gauge testing
  • Check exposed drainage structures and services for any damage or protection compromise
  • Monitor operator fatigue levels particularly during extended shifts or hot weather conditions
  • Verify erosion control devices functioning correctly with no sediment bypassing controls

After work

  • Inspect completed shoulder sections ensuring no hazardous drop-offs, abrupt transitions, or depressions that could affect vehicle control
  • Verify all equipment removed from traffic lanes with no materials or debris remaining in roadway
  • Check traffic management devices still correctly positioned or removed as appropriate for non-working periods
  • Document work completed, including lineal metres graded, compaction test results, and any issues encountered
  • Clean and service all equipment, documenting maintenance required before next shift
  • Verify erosion control devices secured and functioning for overnight or weekend periods
  • Complete incident and near-miss reporting if any issues occurred during shift
  • Debrief with crew regarding safety observations, near-misses, or improvements needed
  • Update service location information if any previously unknown services encountered during grading
  • Secure site ensuring no public access to incomplete works or stockpiled materials

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready
1

Pre-Work Site Assessment and Traffic Control Setup

Conduct comprehensive site inspection identifying shoulder condition, slope angles, soil stability, proximity to drainage structures, and traffic volumes. Review road authority permit conditions, dial-before-you-dig responses, and geotechnical assessment recommendations. Establish traffic management in accordance with approved Traffic Guidance Scheme, installing advance warning signs at calculated distances based on approach speeds, positioning traffic cones to delineate work zone, and deploying traffic controllers if required by permit conditions. Verify all workers briefed on traffic management plan and understand safe work zones versus exclusion areas. **Safety Considerations:** Traffic interaction hazards exist during setup phase with workers exposed to passing vehicles while installing traffic control devices. Always work from behind protection, progressively installing controls moving from safe area toward hazard. Verify sign placement distances comply with AS 1742.3 requirements for actual speed environment. Test communication equipment ensuring operators and traffic controllers can communicate reliably throughout work zone. **Related Hazards:** Traffic interaction, manual handling of signs and traffic control devices, sun exposure during setup activities, proximity to live traffic during installation phase.

2

Equipment Setup and Pre-Operational Checks

Position grading equipment safely off the travelled lane with hazard beacons operating and visible from approaching traffic. Conduct comprehensive pre-start inspections systematically checking ROPS for any structural damage or modifications that compromise integrity, seatbelt for correct operation and adequate adjustment, blade hydraulics for leaks or control sluggishness, tyres for correct pressure and tread wear, steering and braking systems for responsive operation, and all safety devices including reversing alarms and beacon lights. Test communication radio ensuring clear reception throughout anticipated work zone. Review service location information and identify any specific constraints for the day's operations. **Safety Considerations:** Pre-start inspections detect equipment defects before they cause incidents. Never operate equipment with compromised ROPS or non-functioning seatbelts as rollover protection depends on these systems working together. Hydraulic leaks can cause sudden loss of blade control creating instability. Ensure water cart positioned for immediate deployment when grading commences as retrospective dust control is less effective than proactive suppression. **Related Hazards:** Equipment defects potentially causing rollover, hydraulic system failures, inadequate visibility from damaged mirrors or dirty windows affecting awareness of traffic and ground conditions.

3

Initial Vegetation and Debris Clearing

Remove vegetation, rocks, and debris from shoulder area using appropriate equipment (excavator, small dozer, or hand tools depending on extent and location). Work systematically from start of project toward finish, segregating and stockpiling cleared material in designated areas away from active traffic lanes and outside equipment operating zones. Mark locations of any buried services encountered or drainage structures requiring protection. Create clear working surface allowing grading equipment operator to observe ground conditions and identify potential instabilities. Ensure water cart available if clearing operations generate dust. **Safety Considerations:** Hand clearing near live traffic requires workers operating in extremely hazardous environment. Minimise personnel in traffic-exposed areas, using equipment-based clearing wherever practicable. Workers on foot must remain hyper-aware of approaching vehicles regardless of traffic management in place. Identify and mark any service indicators (marker posts, pit lids) before mechanical clearing commences. Vegetation may conceal uneven ground, soft spots, or sudden drop-offs presenting trip hazards and unstable conditions for equipment. **Related Hazards:** Traffic exposure for ground personnel, buried services damaged during clearing, manual handling of heavy debris, dust generation from disturbed vegetation and soil, snake and insect hazards in vegetated areas.

4

Establish Survey Control and Grade Reference Points

Install survey control establishing correct shoulder cross-fall and longitudinal grades matching project specifications and existing pavement profile. Position grade reference markers (stakes, star pickets with marked levels, or string lines) at maximum 20-metre intervals providing clear visual reference for equipment operator. Use laser level or digital levels for accurate height determination, ensuring reference points tied to permanent benchmarks where available. Mark design finish levels on reference stakes using bright paint or flagging tape clearly visible from grader cab. Verify all reference points secured adequately to resist disturbance from weather or vibration. Provide operator with written instruction sheet showing target grades and any specific transition requirements. **Safety Considerations:** Survey personnel working on shoulder and near traffic face same exposure hazards as other ground workers, requiring high-visibility clothing and constant traffic awareness. Use survey equipment on stable ground only, avoiding operation near shoulder edges where ground may be unstable. Survey control work often requires personnel in positions exposed to reversing equipment or equipment with limited operator visibility; always establish positive communication and exclusion zones before equipment operates near survey crews. **Related Hazards:** Traffic exposure during survey operations, unstable ground near shoulder edge when setting reference points, manual handling of survey equipment and marker posts.

5

Grading Operations and Cross-Fall Establishment

Commence grading operations working from the pavement edge outward toward the shoulder break, maintaining specified cross-fall gradients typically between 4-6 percent depending on surface type and road authority specifications. Operate grader at controlled speeds appropriate to soil conditions and slope stability, typically 5-10 km/h for precision grading work. Make multiple light passes (50-75mm depth per pass) rather than attempting excessive material movement in single passes which can destabilise equipment and create poor compaction conditions. Position blade angle to move material outward and downward, avoiding undermining pavement edge or creating abrupt drop-offs. Monitor blade position continuously against grade reference points, making fine adjustments to maintain smooth surface profile. Signal water cart to apply water immediately ahead of blade creating optimum moisture for compaction without over-wetting causing slippery conditions. **Safety Considerations:** Grader stability is most critical during active grading with extended blade creating asymmetric loading. Operators must continuously assess ground conditions, immediately stopping if unexpected soft spots encountered or if equipment begins listing to one side. Maintain safe distance from pavement edge (minimum 500mm wheel clearance) to prevent edge break-off. Avoid grading during adverse weather making ground slippery or reducing visibility. Watch for traffic behaviour, being prepared to stop operations immediately if vehicles not responding to traffic control or displaying erratic behaviour indicating impaired drivers. **Related Hazards:** Equipment rollover during grading on slopes, grade slippage in soft soil conditions, traffic collisions with grading equipment, dust generation affecting visibility, blade contact with buried services, operator fatigue from extended concentration demands.

6

Compaction and Density Achievement

Compact shaped shoulder using vibratory smooth-drum roller or grader wheel compaction in systematic overlapping passes. Commence compaction while soil at optimum moisture content (typically when material just past breaking point if squeezed in hand, forming cast but no free moisture visible). Make minimum 4-6 passes with vibratory roller achieving uniform compaction across full shoulder width. Overlap passes by minimum 150mm ensuring no uncompacted strips remain. Operate roller at steady speed (typically 4-6 km/h) avoiding sudden stops or sharp turns creating bumps or depressions. Conduct density testing using nuclear density gauge or sand replacement method at frequency specified in project specification (typically every 100 linear metres or one test per 500m²). Document test results, achieving minimum 95% Standard Maximum Dry Density or as specified. **Safety Considerations:** Compaction equipment operators face similar rollover risks as graders when operating on shoulder slopes. Nuclear density gauge operators require specific radiation safety training and compliance with radiation licensing requirements. Gauges must be stored in approved lockable containers, transported in compliant vehicles, and users must carry current radiation device operator licenses. Maintain safe distances between compaction equipment and traffic (minimum 2 metres clear width) to prevent vehicle interaction. Monitor for any ground movement during compaction indicating instability requiring work suspension. **Related Hazards:** Equipment rollover during compaction on slopes, radiation exposure from nuclear density gauge if safety protocols not followed, traffic interaction particularly during edge compaction close to live lanes.

7

Drainage Integration and Surface Water Management

Verify shoulder grading correctly integrates with existing and proposed drainage infrastructure including table drains, mitre drains, cross-falls directing water to inlet pits, and transitions at culvert locations. Ensure grading creates positive drainage with no depressions or reverse grades allowing water ponding. Hand-finish areas around drainage structures where grading equipment cannot achieve required tolerances. Install or restore drainage devices (spoon drains, mitre drains) maintaining shoulder integrity during rain events. Verify all surface water directed away from pavement edge and toward designated drainage systems. Inspect completed sections ensuring longitudinal grades allow water to flow to drainage points without erosion velocity. **Safety Considerations:** Hand-finishing work around drainage structures places workers in positions exposed to passing traffic with reduced protection. Minimise time spent in these exposed positions, using equipment for maximum extent feasible. Working around drainage pits creates fall hazards if pit lids not securely in place or if worker steps into drainage channel. Wet conditions created by drainage work increase slip hazards particularly on compacted slopes. Ensure all drainage pits adequately protected preventing accidental entry by workers or equipment. **Related Hazards:** Falls into drainage structures, traffic exposure during hand-finishing work, slips on wet surfaces, manual handling during drainage installation, confined space entry if drainage pit access required.

8

Edge Treatment and Transition Blending

Complete shoulder edge treatment creating safe transitions to existing ground, adjacent properties, or intersecting roads. Blend graded shoulder smoothly into existing grades at project limits, typically using 10:1 or flatter transition slopes to prevent abrupt drops or humps. Install edge protection where specified including edge batter stabilisation, edge seal, or shoulder seal extending 300-500mm from pavement edge. Verify all transitions safe for vehicle recovery if errant vehicle leaves pavement. Remove any loose material, rocks, or debris from completed shoulder that could become projectiles or create hazards for vehicles using shoulder. Inspect edge interface between pavement and shoulder ensuring no vertical lip or sharp edge exceeding 25mm depth. **Safety Considerations:** Transition areas at project limits often occur at property boundaries where service conflicts are highest and space constraints most critical. Exercise extreme caution when operating near mailboxes, driveways, or boundary fences where underground services commonly located. Hand-finishing transition areas exposes workers to traffic in locations where traffic management may be marginal due to short work zone length. Edge seal application often uses hot bitumen or emulsion creating burn hazards and requiring specific handling procedures. **Related Hazards:** Service strikes at property boundaries, traffic exposure during transition finishing work, burns from edge seal materials, manual handling during edge treatment installation.

9

Erosion Control Implementation and Environmental Protection

Install erosion and sediment control measures immediately upon completion of shoulder grading and compaction. Position sediment fencing along downslope edge and at drainage discharge points preventing sediment-laden runoff entering waterways or neighbouring properties. Install erosion control matting or temporary hydromulch seeding on steep batter slopes exceeding 1:4 gradient or where extended periods anticipated before final surface treatment. Construct temporary drainage devices (bunds, mitre drains) directing surface water to stable discharge points if permanent drainage not yet installed. Inspect all environmental controls ensuring correct installation and function. Document installation with photographs for environmental compliance reporting. **Safety Considerations:** Installing sediment fencing on steep batters creates fall hazards if workers lose footing on loose soil. Use fall protection harnesses and anchor points where installation on slopes steeper than 1:4 or when working within 2 metres of unprotected edges exceeding 2 metres height. Star picket driving for fence installation creates manual handling and struck-by hazards from post driver operation. Hydromulch spraying creates dust and mist exposure requiring respiratory protection. Work scheduling should avoid installation immediately before forecast rain when effectiveness not yet established. **Related Hazards:** Falls from steep batters during installation, manual handling of erosion control materials, struck-by hazards from post driving, respiratory exposure to hydromulch materials.

10

Final Inspection, Defect Rectification, and Completion Documentation

Conduct systematic final inspection of all graded shoulder sections verifying compliance with specifications for cross-fall gradients, surface smoothness, compaction levels, drainage functionality, and integration with existing infrastructure. Document any defects or non-conformances requiring rectification. Measure shoulder widths at 50-metre intervals confirming achievement of specified dimensions. Test surface water drainage by water flooding if no rain occurred during construction to verify no ponding or incorrect flow patterns. Photograph completed works showing before and after conditions. Complete project documentation including as-built surveys if grades modified from design, compaction test results, and environmental control installation records. Coordinate with client or road authority for formal handover inspection. **Safety Considerations:** Final inspection personnel working on foot along completed shoulder remain exposed to traffic hazards throughout inspection process. Conduct inspections during low traffic periods where practicable and always maintain traffic management even though active construction completed. Inspection in areas where traffic management removed requires extreme caution with inspectors highly visible and constantly aware of approaching vehicles. Inspection involving measurement on slopes creates same slip and stability hazards as encountered during construction. Maintain communication between inspection personnel and ensure isolation from any remaining equipment operations during inspection period. **Related Hazards:** Traffic exposure during inspection activities, slips and falls on graded slopes, residual equipment operation hazards, sun exposure during extended inspection periods.

Frequently asked questions

What are the maximum safe slope angles for grader operation during shoulder grading?

Safe slope angles for motor grader operation depend on multiple factors including soil type, moisture content, equipment specifications, and operator experience. Generally, graders should not operate on cross-slopes exceeding 15 degrees (approximately 1:4 or 27% gradient) when grading with blade extended, as this creates significant lateral instability risks. For longitudinal grades, graders can typically operate safely on slopes up to 20-25 degrees if travelling straight uphill or downhill without blade engagement creating lateral forces. However, these are general guidelines only—actual safe operating limits must be determined by site-specific geotechnical assessment considering actual soil conditions, groundwater presence, and equipment stability characteristics. Many civil contractors implement more conservative limits, restricting grading operations to maximum 10-degree cross-slopes during active blade work. When slopes exceed safe grading angles, alternative methods such as bulldozer work, excavator battering, or staged benching should be employed. The critical principle is that equipment operators must never work on slopes where they feel uncomfortable or where equipment exhibits any listing or lateral movement. If doubt exists about slope safety, work should cease pending geotechnical assessment and engineering review. Australian Standard AS 2454 'Earthmoving machinery - Protective structures' provides guidance on equipment stability principles, though site-specific assessment remains mandatory for actual operational limits.

How do you manage shoulder grading operations during wet weather or in saturated soil conditions?

Shoulder grading in wet conditions requires extremely cautious approach given substantially elevated risks of both equipment rollover and slope failure. The primary control measure is to avoid grading operations during and immediately following rain events until soil conditions have dried sufficiently to restore safe bearing capacity. Conduct daily soil assessment by physically inspecting the shoulder material, observing whether equipment tracks sink excessively (more than 50mm), and performing hand squeeze tests to estimate moisture content. If soil at or above optimum moisture content (characterised by water easily expressed when squeezed), grading should generally be deferred. Where project schedule pressures demand continuation despite marginal conditions, implement additional controls including: restricting operations to flatter sections below 8-degree cross-slope; reducing blade engagement to lighter cuts of 25-50mm maximum depth; operating at slower speeds allowing operators greater reaction time if ground movement detected; positioning observer outside equipment maintaining communication with operator and watching for any ground movement indicators; maintaining greater setback distance from shoulder edge (minimum 3 metres versus normal 2 metres); and having recovery equipment (excavator, tow vehicle) immediately available. Some civil contractors utilise ground improvement techniques including placement of geofabric or aggregate stabilisation layers beneath equipment operating paths in soft conditions. The critical understanding is that wet soil substantially reduces shear strength and bearing capacity—loads safely supported when dry may cause failure when saturated. Equipment operators must constantly monitor ground conditions, immediately stopping operations if any settling, lateral movement, or abnormal equipment behaviour observed. Never continue operations in deteriorating conditions based on schedule pressures—the consequences of wet weather rollovers or slope failures far exceed any delay costs.

What traffic management arrangements are required for shoulder grading work and who can design them?

Traffic management for shoulder grading must comply with Australian Standard AS 1742.3 'Manual of Uniform Traffic Control Devices Part 3: Traffic Control for Works on Roads' and relevant state road authority requirements. Traffic Management Plans (TMPs) or Traffic Guidance Schemes (TGS) must be designed by qualified personnel holding appropriate qualifications—typically current statement of attainment for Implement Traffic Management Plans (RIIWHS205D) at minimum, with complex sites requiring designer qualifications (RIICOM301D Design Traffic Management Plans or equivalent). The TGS must be submitted to the relevant road authority for approval before work commences, with processing times varying by jurisdiction and complexity but typically requiring 10-20 business days. For shoulder grading work, typical traffic management includes advance warning signs positioned at calculated distances (determined by approach speeds and reaction times as specified in AS 1742.3), temporary speed limit signs reducing speeds through work zone (often to 40 or 60 km/h), lane delineation using traffic cones or delineators creating visual separation between work zone and travel lanes, and flashing warning lights on work vehicles and static signs enhancing conspicuity. Where shoulder grading requires encroachment into traffic lanes, additional controls including traffic controllers, variable message signs, and potentially lane closures may be necessary. Night works require enhanced traffic management with larger signs, additional lighting, and increased advance warning distances. All traffic control devices must comply with Australian Standards for size, reflectivity, and placement. Personnel implementing traffic control must hold current traffic controller qualifications. The traffic management must remain in place and maintained throughout works, with daily inspections ensuring devices correctly positioned and functional. Damaged or missing devices must be replaced immediately. Road authority permits often specify additional requirements beyond AS 1742.3 minimum standards, which must be incorporated in site-specific TGS. Failure to implement approved traffic management constitutes breach of WHS regulations and road authority permit conditions, potentially resulting in work stoppage and substantial penalties.

What compaction testing methods and frequencies are required for shoulder grading work?

Compaction testing requirements for shoulder grading vary based on project specifications, road classification, and client requirements, but typically require verification of achieving minimum 95% Standard Maximum Dry Density (SMDD) relative to AS 1289 standard. Testing methods include nuclear density gauge testing (most common for civil roadworks due to speed and non-destructive nature), sand replacement method complying with AS 1289.5.3.1 (used where nuclear gauges prohibited or for verification testing), or dynamic cone penetrometer testing providing indirect correlation to density. Nuclear density gauge testing requires operators to hold current radiation safety licenses and comply with radiation safety regulations including transport, storage, and use protocols. Test frequency typically specified as one test per 100 linear metres or one test per 500m² of shoulder area, though some specifications require increased frequency for first 200 metres to verify methodology then reduced frequency thereafter if consistent results achieved. Testing should occur at varying shoulder widths (inner, mid, and outer positions) to verify uniform compaction across full width. Tests must be conducted on material at correct moisture content (typically optimum moisture content ±2% as determined from laboratory moisture-density relationship tests conducted before works). Document all test results including location, depth of test, dry density reading, moisture content, and calculated percentage of SMDD. Non-compliant test results require investigation and rectification, typically involving additional compaction passes followed by re-testing. Some specifications include requirements for proof rolling where loaded vehicle (typically 20-tonne truck) traverses completed shoulder and any deflection or pumping observed indicates inadequate compaction requiring rework. Maintain comprehensive testing records forming part of project quality documentation and often required for final acceptance by road authority or client. For shoulder works involving imported materials, additional testing may be required including particle size distribution (PSD) to verify material compliance with specification grading envelopes, and potentially California Bearing Ratio (CBR) testing for structural capacity verification on higher-classification roads.

What are the requirements for dust suppression during shoulder grading operations?

Dust suppression during shoulder grading is mandatory under WHS regulations to protect worker health, maintain visibility for traffic safety, and prevent environmental nuisance affecting neighbouring properties. The primary control is water suppression applied continuously during grading operations. Water carts should have minimum 8,000-litre capacity for typical road shoulder projects, though larger capacity (12,000-15,000 litres) preferred for extended work sections distant from water refill points. Water should be applied immediately ahead of grading operations creating optimum moisture content for both dust control and compaction outcomes. Application rates vary based on soil type, weather conditions, and grading intensity: sandy soils require higher rates (typically 1-2 litres per square metre), while clay soils require lower rates (0.5-1 litre per square metre) to avoid over-wetting creating slippery conditions. During hot, dry, windy conditions, application rates may need doubling to achieve effective dust control. Water application nozzles should provide broad coverage pattern without creating concentrated flows causing erosion. Operators must continuously monitor dust generation, adjusting water application or suspending operations if dust clouds develop despite suppression efforts. Environmental Protection Authority (EPA) regulations in most states prohibit visible dust emissions beyond property boundaries, with complaints from neighbouring properties potentially triggering regulatory action including work stoppage and environmental improvement notices. For extended dry periods or staged construction where graded shoulders remain unsealed for weeks, consider polymer-based dust suppressants or tackifiers providing longer-lasting dust control than water alone. Some products bind soil particles reducing dust generation for 7-30 days depending on formulation and traffic exposure. Calculate water requirements before mobilising, ensuring adequate supply available throughout shift—running out of water is not acceptable excuse for operating without dust suppression. During extreme fire danger days or total fire ban periods, water application may be insufficient to safely control dust, requiring work suspension until conditions moderate. Document all dust control measures implemented, including water volumes applied and any suppressant products used, as evidence of environmental management compliance if queries or complaints arise. Integration of dust control with traffic management is critical—dust obscuring roadway visibility creates immediate traffic safety hazard requiring emergency response including possible work zone closure until visibility restored.

What emergency response procedures should be in place for shoulder grading operations?

Comprehensive emergency response procedures are essential for shoulder grading given the high-consequence hazards including equipment rollover, traffic incidents, and slope failures. Emergency response plans must address multiple scenarios with pre-defined procedures reducing confusion during actual incidents. For equipment rollover, immediate priorities include: operator assessment and first aid provision without moving operator if spinal injuries suspected; calling emergency services (000) providing precise location including road name, chainage or intersection reference, and clear description of incident; implementing additional traffic management preventing secondary incidents with additional vehicles striking rolled equipment; isolating equipment electrically and hydraulically preventing fire escalation or unexpected equipment movement; and establishing controlled access preventing unauthorised persons entering unstable area that may be subject to further ground movement. Do not attempt to right rolled equipment or conduct recovery operations until engineering assessment confirms ground stability and safe approach methodology established. For traffic incursions or vehicle strikes, priorities include: immediate first aid provision while ensuring provider safety from ongoing traffic; calling emergency services providing accurate location and injury description; implementing emergency traffic management potentially requiring complete road closure if incident blocks traffic lanes; preserving incident scene for police investigation (do not move vehicles or disturbed traffic control devices unless absolutely necessary for safety); and documenting incident through photographs and witness statements. For ground instability or slope failure, immediately evacuate all personnel from potentially affected area, establish exclusion zone minimum 10 metres beyond visible movement, cease all operations creating vibration or loading on affected slope, engage geotechnical engineer for emergency assessment, and document extent of movement through photography and survey measurements. All emergency scenarios require immediate notification to site supervisor, principal contractor (if subcontractor), and road authority. Maintain emergency contact list including local emergency services, nearest hospital location and contact details, equipment suppliers for emergency recovery services, geotechnical consultants for stability assessment, and company management contacts. Ensure all personnel trained in emergency procedures through pre-start briefings, with specific roles assigned (first aid officer, emergency services liaison, traffic management coordinator). Maintain first aid kits in accordance with AS 2675 First Aid Kit contents, with sufficient supplies for work crew size and typical injuries. Ensure adequate communication equipment (UHF radios, mobile phones) to summon assistance from remote work locations where mobile coverage may be limited. Conduct emergency drills periodically (minimum annually) testing emergency response procedures and identifying any gaps requiring procedure refinement. Following any emergency incident, conduct formal debrief identifying contributing factors and implementing corrective actions preventing recurrence.

Related SWMS documents

Browse all documents
Trusted by 1,500+ Australian construction teams

Civil Shoulder Grading SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.