Culvert and tank installation SWMS, drafted for your job
Culvert barrels and tank sections can shift during lifting or jointing, with crews working beside open excavations and incoming water. Tell us the job and the site: your SWMS is drafted around them, and you check it with the crew before work starts.
A$39per job
However many high-risk activities it covers.
- However many high-risk activities it covers.
- 3 for A$99
- 10 for A$249
- Yearly A$129 for 120
- Monthly A$60 for 10
You review it on site before work starts.
Your Business
Safe Work Method Statement
Version 1
Draft
Culvert and tank installation
Site Your site address
Law Your state
High-risk construction work
- Work in or near a deep trench, shaft or tunnel
- Tilt-up or precast concrete work
- Work where powered mobile plant is moving
- Work in or near a confined space
Job steps, hazards and controls
| 1 | Locate services and plan placement | Hidden assets and unstable ground | High | Expose services and confirm crane standing areas |
| 2 | Excavate and prepare bedding | Excavation wall collapse | Extreme | Install trench protection before workers enter |
| 3 | Lift culvert or tank sections | Swinging precast load | Extreme | Clear the landing zone and use designated lifting points |
| 4 | Join sections and pipework | Joint pinch and tank entry | High | Use jointing aids and complete connections from outside |
| 5 | Backfill around the installation | Plant beside open pit | High | Keep crews clear and place backfill in the planned sequence |
Illustrative first page. Yours carries your business name only.
What you get
What your culvert and tank installation SWMS will contain
An A4 document your crew can read on site, a PDF for the builder and a sign-on register.
- Job and site detailsYour business, the site, the principal contractor, the dates.
- High-risk construction workThe categories your job involves, ticked.
- Step-by-step methodEach step with its hazards, risk rating and controls.
- How controls are checkedWho puts each control in place, monitors and reviews it.
- PPE, plant and permitsEquipment and training the job needs.
- Emergency planAssembly point, first aid, nearest hospital to confirm on site.
- Consultation and reviewWho was consulted, when it is reviewed.
- Sign-on registerYour crew signs by QR or on paper.
High-risk construction work
Categories this task often involves
You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.
- Work in or near a deep trench, shaft or tunnel
- Tilt-up or precast concrete work
- Work where powered mobile plant is moving
- Work in or near a confined space
State notes
Rules depend on your state
Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.
Hazards and controls
What goes wrong on a culvert and tank installation job, and how the SWMS controls it
These rows are written for this task. Your draft adds the ones your site and method need.
- 1
Collapsing excavation walls around culvert bedding and tank bases
Extreme- Install the designed excavation support before workers prepare bedding
- Keep cranes, spoil and delivery trucks back from the excavation edge
- 2
Crushing beneath suspended culvert barrels and tank sections
Extreme- Keep people out of the lift path and landing area
- Use designated lifting points and guide sections from clear of the load
- 3
Crushed fingers between culvert sockets and tank joint faces
High- Use jointing tools and alignment aids instead of hands between sections
- Set each section securely before fitting seals or connections
- 4
Buried services struck while opening the culvert or tank pit
Extreme- Locate and expose services before mechanical digging near them
- Mark exposed services and protect them from buckets and lifted sections
- 5
Poor air and trapped workers inside a newly placed tank
Extreme- Make connections from outside the tank wherever practicable
- Plan any entry with air checks, isolation, an outside observer and rescue arrangements
- 6
Flooding through an open culvert during bedding and jointing
High- Divert incoming water before crews enter the culvert excavation
- Watch weather and upstream flow; leave the excavation if water rises
How the job usually runs
- 1Locate services and plan placementHidden assets and unstable ground → Expose services and confirm crane standing areas
- 2Excavate and prepare beddingExcavation wall collapse → Install trench protection before workers enter
- 3Lift culvert or tank sectionsSwinging precast load → Clear the landing zone and use designated lifting points
- 4Join sections and pipeworkJoint pinch and tank entry → Use jointing aids and complete connections from outside
- 5Backfill around the installationPlant beside open pit → Keep crews clear and place backfill in the planned sequence
PPE for this job
- Safety boots
- High visibility clothing
- Handling gloves
- Safety glasses
- Hearing protection
Your draft lists the PPE your site and method need.
After you finalise
Brief your crew and send it to your builder
Crew signs by QR
Send to my builder
PDF and register
Builder sent it back?
Make their changes and re-issue the same job free. Workers re-sign the new version.
Questions
Culvert and tank installation SWMS questions
- Last reviewed
- 21 October 2026
- How
- Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
- Next review
- Every six months, or when the method or rules change
Does the draft cover both culverts and storage tanks?
Yes. Describe the sections, excavation and lifting arrangement. The draft covers bedding, placement, joints and backfilling, with controls tailored to the culvert alignment or tank pit rather than assuming the same lift for both.
Does installing a tank include going inside it?
Entry needs its own planned arrangements. The draft starts with connections from outside and includes isolation, air checks, an observer and rescue planning when entry cannot be avoided.
How much does a culvert and tank installation SWMS cost?
One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.
Is this a template?
No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.
Who checks the SWMS?
You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.
My builder sent it back. What now?
Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.
How does my crew sign it?
Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.
Does it work in my state?
Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.