A plant-supported workbox puts people above a machine that must stay stable, with attachment failure, overhead crushing and poor operator communication threatening the occupants. Tell us the job and the site: your SWMS is drafted around them, and you check it with the crew before work starts.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Workbox access

Site Your site address

Law Your state

High-risk construction work

  • Work where someone could fall from height
  • Work where powered mobile plant is moving

Job steps, hazards and controls

1Assess task and carrier compatibilityUnsuitable plant and workbox pairingExtremeConfirm the personnel lifting combination and planned rescue method
2Inspect and positively attach workboxAttachment lock failureExtremeCheck the carrier and verify every securing connection
3Board and agree movement signalsUnsecured gate and poor contactHighBoard on the ground and check restraint and communication
4Raise and complete the workCrushing and carrier instabilityExtremeKeep the carrier stationary and maintain clear operator contact
5Lower, exit and isolate equipmentUncontrolled movement during exitHighLand the workbox before opening the gate and leaving
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your workbox access SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where someone could fall from height
  • Work where powered mobile plant is moving
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a workbox access job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Personnel workbox detaching from the supporting plant during lifting

    Extreme
    • Use a personnel workbox and carrier combination specifically suited to one another
    • Inspect and verify every positive attachment lock before anyone boards
  2. 2

    Supporting plant tipping as the occupied workbox is raised

    Extreme
    • Set the carrier on firm level ground using the planned support arrangement
    • Keep the complete workbox load within the combination’s capacity and do not travel with occupants raised
  3. 3

    Occupants crushed between the workbox and overhead beams or services

    Extreme
    • Choose a lifting position with clear space around the whole box
    • Keep the operator at the controls and stop if the workbox travel path cannot be observed
  4. 4

    Falls while entering or leaning beyond the personnel workbox rails

    Extreme
    • Board at ground level and keep the gate secured while raised
    • Use the designated restraint arrangement and lower the box to change the work position
  5. 5

    Operator moving the occupied workbox after misunderstanding a signal

    High
    • Agree primary and backup communication before boarding
    • Stop movement if communication is lost and resume only after contact is restored
  6. 6

    Workers stranded in a raised workbox after supporting plant failure

    High
    • Test the planned lowering method and confirm rescue arrangements before lifting people
    • Keep a ground support person available with access to the emergency controls

How the job usually runs

  1. 1Assess task and carrier compatibilityUnsuitable plant and workbox pairing → Confirm the personnel lifting combination and planned rescue method
  2. 2Inspect and positively attach workboxAttachment lock failure → Check the carrier and verify every securing connection
  3. 3Board and agree movement signalsUnsecured gate and poor contact → Board on the ground and check restraint and communication
  4. 4Raise and complete the workCrushing and carrier instability → Keep the carrier stationary and maintain clear operator contact
  5. 5Lower, exit and isolate equipmentUncontrolled movement during exit → Land the workbox before opening the gate and leaving

PPE for this job

  • Safety boots
  • Head protection with chin strap
  • Safety glasses
  • Handling gloves
  • Workbox-specific harness and restraint equipment
  • High visibility clothing

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Workbox access SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Can any cage be fitted to a forklift for elevated work?

No. The draft includes checking that the personnel workbox and supporting plant are a compatible combination, with a positive attachment system and a planned capacity and support arrangement before people board.

Can the supporting plant move while workers are raised in the box?

Keep the carrier stationary while the box is occupied at height. The draft includes lowering to the landing position before relocation, keeping the operator at the controls and stopping movement if communication is lost.

How much does a workbox access SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS