Hydro seeding, also known as hydraulic mulch seeding or hydromulching, is a planting process that sprays a slurry mixture of seed, mulch, fertiliser, soil amendments, and water onto prepared soil surfaces for rapid vegetation establishment. This SWMS addresses the specific hazards of hydro seeding operations including slip hazards on wet slopes during seeding activities, chemical exposure from seed treatments containing fungicides and insecticides, pressure injuries from high-pressure seeding equipment operating at 60-120 psi, and noise exposure from hydraulic pumping equipment exceeding 85 dB(A). The document provides comprehensive controls for managing these hazards through proper equipment operation, personal protective equipment, and safe work practices. Hydro seeding is commonly used for erosion control on disturbed land, revegetation of road batters and embankments, rehabilitation of quarry sites and mine areas, establishment of turf on large areas such as sports fields and golf courses, and rapid vegetation establishment for sediment control during construction. The work typically involves truck-mounted or trailer-mounted spray equipment with large tanks (2000-15000 litres capacity) mixing and applying slurry through high-pressure hoses and spray nozzles operated by ground crews working on varied terrain including steep slopes where traditional seeding methods are impractical.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Hydro seeding is an efficient revegetation method that combines seed, mulch, fertiliser, soil amendments, water, and bonding agents into a homogenous slurry applied hydraulically through spray equipment. The process offers significant advantages over traditional seeding including uniform seed distribution achieving consistent coverage rates, immediate erosion protection from mulch layer applied simultaneously with seed, enhanced seed-to-soil contact improving germination rates, ability to work on steep slopes and irregular terrain inaccessible to conventional equipment, and reduced labour costs covering large areas rapidly with small crews. The slurry typically contains wood fibre or paper mulch (100-200 kg per 1000 litres water), grass or native seed species selected for site conditions (10-50 kg per 1000 litres), fertiliser providing nutrients for plant establishment (10-30 kg per 1000 litres), tackifiers or binders helping materials adhere to slopes, and seed treatment chemicals including fungicides protecting seed from disease and pre-emergent herbicides preventing weed competition. Equipment ranges from small trailer-mounted units with 1000-2000 litre capacity for residential and small commercial sites to truck-mounted units with 8000-15000 litre capacity for highway construction and large-scale rehabilitation projects. The spray application system uses centrifugal pumps or positive displacement pumps generating pressures of 60-120 psi (400-800 kPa) delivering slurry through high-pressure hoses (typically 50-100 metres long) to spray nozzles adjusted for desired coverage pattern and throw distance. Operators must manage hose position, spray angle, and application rate while navigating varied terrain including newly constructed batters that may be loose or unstable. Work often occurs on active construction sites requiring coordination with earthmoving operations, traffic management, and environmental protection requirements. Successful hydro seeding depends on appropriate seed species selection, proper application timing relative to seasonal rainfall patterns, adequate surface preparation with appropriate grade and compaction, and post-application irrigation if natural rainfall is insufficient during establishment period. The method is particularly valuable for erosion control applications where rapid vegetation establishment is critical to prevent sediment discharge and environmental harm during construction phases.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Hydro seeding operations involve multiple safety hazards that can cause severe injuries if inadequate controls are implemented. Slip hazards on wet slopes represent one of the most common incident types in hydro seeding work, with operators required to work on freshly seeded surfaces becoming extremely slippery when wet from spray application. Falls on slopes often result in rolling or sliding incidents where workers cannot arrest their descent, leading to fractures, spinal injuries, or more severe trauma if obstacles are contacted during the fall. Australian Work Health and Safety legislation requires risk assessment and control measures for slips, trips and falls, chemical exposure, pressure equipment operation, and noise exposure management. Chemical exposure from seed treatment products including fungicides (often thiram-based) and insecticides poses both acute toxicity risks from concentrated product handling and chronic health effects from repeated exposure over career duration. Many seed treatments are skin sensitisers causing contact dermatitis in susceptible individuals, while inhalation exposure during mixing operations can cause respiratory irritation. High-pressure spray equipment operating at 60-120 psi presents injection injury risks if operators or ground personnel are struck by spray streams, with high-pressure slurry capable of penetrating skin causing deep tissue contamination that can lead to serious infections or require surgical debridement. Pressure hose failures from wear, kinking, or vehicle run-over cause violent whipping that can strike workers or bystanders, while sudden releases during connection or disconnection procedures spray operators with slurry containing chemicals. Noise exposure from hydraulic pumps and agitation systems commonly exceeds 85 dB(A) requiring hearing protection, with chronic exposure leading to noise-induced hearing loss affecting quality of life and communication ability. A properly implemented SWMS establishes critical controls including appropriate footwear and fall arrest systems for work on steep slopes, chemical handling procedures with proper PPE preventing exposure to seed treatments, pressure equipment maintenance and operation practices preventing injection injuries, and hearing conservation programs protecting workers from noise-induced damage. The SWMS also addresses environmental protection preventing chemical-contaminated runoff entering waterways, proper storage and handling of hazardous substances, and emergency response for chemical exposures or pressure injuries. With comprehensive controls, hydro seeding can be conducted safely even on challenging terrain and using necessary chemical treatments, protecting workers from serious injuries while delivering effective vegetation establishment for erosion control and environmental rehabilitation.

Reinforce licensing, insurance, and regulator expectations for Hydro Seeding Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

High

Hydro seeding operations require workers to access and work on sloped surfaces, often immediately after spray application when surfaces are saturated with water-based slurry creating extremely slippery conditions. Road batters and embankments commonly worked range from 1:2 to 1:3 grade (approximately 27-18 degrees slope) which becomes treacherous when wet. Freshly placed topsoil or subsoil surfaces lack vegetative cover providing no grip for footwear, while clay soils become particularly slippery when wet. Spray operators must manage heavy hoses (often 50mm diameter weighing 2-3 kg per metre when charged with slurry) while maintaining footing on slopes, with hose movement creating trip hazards and pulling forces affecting balance. Falls on slopes often become uncontrolled slides where workers cannot arrest descent, with potential to slide 10-30 metres down steep batters before reaching level ground or encountering obstacles. Injuries from slope falls include fractures of wrists and arms from attempting to arrest falls, ankle and knee injuries from twisting on uneven surfaces, spinal injuries from impact with ground or obstacles during sliding falls, and head injuries if workers strike rocks, stumps, or equipment during uncontrolled descents.

Consequence: Fractures requiring surgical repair and months of recovery, spinal cord injuries causing permanent disability, head trauma causing concussion or more severe brain injury, or fatal injuries from falls on steep terrain with obstacles.

Medium

Seed used in hydro seeding often comes pre-treated with fungicides protecting against damping-off disease and seed rot, and may include insecticides preventing seed consumption by insects and rodents. Common treatments include thiram fungicide (tetramethylthiuram disulphide), captan fungicide, or metalaxyl fungicide, along with insecticides such as imidacloprid or clothianidin. Workers handling treated seed during mixing operations are exposed to dust containing these chemicals, while liquid chemical additives added to slurry require careful handling to prevent splashing or spills contacting skin. Many seed treatment fungicides are skin sensitisers causing contact dermatitis with repeated exposure, presenting as red itchy rash on hands and forearms that can progress to chronic inflammation requiring medical treatment. Inhalation of treatment dusts during mixing causes respiratory tract irritation with coughing and throat irritation. Some treatments are toxic if swallowed, with concentrated product ingestion potentially causing severe poisoning requiring hospitalisation. Chronic low-level exposure to these chemicals has been associated with various health effects requiring exposure minimisation. Chemical Safety Data Sheets (SDS) for seed treatments warn of hazardous properties requiring protective equipment and safe handling procedures.

Consequence: Contact dermatitis requiring medical treatment and potential sensitisation preventing future chemical work, respiratory sensitisation from inhalation exposure, acute poisoning if chemicals are ingested or absorbed through damaged skin, or chronic health effects from repeated exposure.

High

Hydroseeding equipment operates at pressures of 60-120 psi (400-800 kPa) pumping slurry through hoses and spray nozzles with sufficient force to project material 15-30 metres. At these pressures, direct spray contact with skin can cause injection injuries where slurry penetrates tissue and spreads along fascial planes causing contamination deep within the body. While not as high as some industrial pressure systems, sustained spray contact or close-range exposure (within 1 metre of nozzle) can still break skin and inject material. Pressure hose failures are more common given the abrasive nature of slurry causing internal hose wear, external damage from dragging over rough surfaces, or crush damage if vehicles run over hoses. Failed hoses whip violently when pressure is released, with heavy 50mm hoses moving with substantial force capable of causing lacerations or blunt trauma if striking workers. Connections between hoses or at nozzles can release under pressure if not properly secured, causing slurry spray contacting operators' faces or bodies. The slurry itself contains organic materials including seed, mulch, and fertiliser that can cause severe infections if injected under skin or into eyes, with contaminated deep tissue injuries requiring aggressive surgical treatment to prevent sepsis.

Consequence: Injection injuries requiring surgical debridement to remove contaminated tissue, severe infections from organic material contamination requiring extended antibiotic treatment, eye injuries from high-pressure spray contact causing permanent vision damage, or blunt trauma from whipping hoses causing fractures or lacerations.

Medium

Hydroseeding equipment uses high-capacity centrifugal pumps or positive displacement pumps creating substantial noise levels, typically 85-95 dB(A) at operator position depending on equipment age and pump type. Mechanical agitation systems using paddle mixers or jet agitation generate additional noise maintaining slurry suspension during application operations. Operators positioned near equipment for hours during continuous application experience cumulative noise exposure well exceeding daily limits requiring hearing protection. Diesel engines powering truck-mounted units contribute additional noise especially at high load during pumping operations. Communication between operators and ground crew is difficult in high-noise environments, requiring hand signals or radio communication, with missed communications potentially leading to incidents if spray operations are not properly coordinated. Chronic noise exposure over career duration causes noise-induced hearing loss, typically affecting high frequencies first but progressing to speech frequency ranges affecting communication ability and quality of life. The condition is irreversible once damage occurs, making prevention through hearing protection critical. Acute exposure to impact noises from equipment failures (such as coupling failures or pressure releases) can cause immediate acoustic trauma.

Consequence: Permanent noise-induced hearing loss affecting communication and quality of life, tinnitus causing chronic distress and sleep disruption, temporary threshold shift reducing hearing acuity for hours after exposure, or acoustic trauma from sudden impact noises causing immediate hearing damage.

Medium

Hydroseeding equipment must be positioned close to work areas to minimise hose length requirements, often requiring operation on uncompacted fill, near slopes, or in active construction zones with mobile plant traffic. Truck-mounted units weighing 10-25 tonnes when loaded can sink into soft ground or become unstable if positioned on slopes or inadequately compacted surfaces. Backing operations to position equipment create reversing hazards in areas with limited visibility and changing site conditions. High-pressure hoses extending 50-100 metres across work areas create trip hazards for other site workers and must often cross active traffic routes requiring hose bridges or warning devices. Ground crews managing hose position must work near moving equipment including the hydroseeder itself and other site plant, with visibility to equipment operators often poor due to terrain and site congestion. Chemical storage tanks containing concentrated fertilisers and seed treatments secured on hydroseeder platforms can shift during transport or tip if equipment operates on uneven ground, causing chemical spills or creating falling hazards if tanks detach.

Consequence: Equipment rollover causing operator injury or death, workers struck by reversing vehicles, crushing injuries from equipment becoming unstable on slopes, or environmental contamination from chemical spills if storage tanks are damaged or displaced.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Appropriate footwear with aggressive tread patterns provides traction on wet slopes, while fall arrest harnesses prevent uncontrolled falls when working on steep terrain. This PPE control creates the final barrier preventing serious injuries from slip and fall incidents that represent the most common hazard in hydro seeding operations.

Implementation

1. Provide slip-resistant safety boots with deep multi-directional tread patterns designed for wet terrain work, avoiding worn footwear with smooth soles providing inadequate traction 2. Issue full-body fall arrest harnesses to AS/NZS 1891.1 for work on slopes exceeding 1:2 grade (approximately 27 degrees) or when working within 2 metres of unprotected edges 3. Install temporary anchor points at slope tops using earth anchors, ground stakes, or vehicle-mounted anchor systems allowing workers to attach lanyards before descending slopes 4. Use energy-absorbing lanyards rated for fall arrest limiting impact forces to acceptable levels, with lanyard length selected to prevent striking lower ground or obstacles during fall arrest 5. Fit workers in correct harness sizes ensuring proper adjustment of leg, chest, and shoulder straps, with regular checks during shifts as straps can loosen during active work 6. Train workers in fall arrest equipment use including pre-use inspection, correct attachment points on harness and anchors, and self-rescue techniques if suspended after fall 7. Inspect fall protection equipment daily before use checking for cuts, abrasion, chemical contamination, or UV damage, removing damaged equipment from service immediately 8. Establish rescue procedures for workers suspended in harnesses after falls, recognising that suspension trauma can develop within 10-20 minutes requiring rapid rescue response 9. Consider additional PPE including knee pads for workers frequently kneeling on slopes during hose management or equipment adjustment, protecting from impact injuries and improving stability 10. Replace PPE according to manufacturer service life recommendations, with fall protection equipment typically requiring retirement after 5 years or immediately after arresting a fall

Systematic chemical handling procedures combined with proper personal protective equipment prevent exposure to fungicides, insecticides, and fertilisers used in hydro seeding operations. These controls address both acute toxicity from concentrated product handling and chronic exposure from repeated contact during routine operations.

Implementation

1. Obtain and review Safety Data Sheets (SDS) for all chemicals used including seed treatments, fertilisers, and additives, making SDS available to all workers and highlighting key hazards and control requirements 2. Implement closed mixing systems where concentrated chemicals are added to tanks through sealed connections reducing worker exposure to dusts, vapours, and splashes during mixing operations 3. Provide chemical-resistant gloves (nitrile or neoprene) with gauntlet cuffs extending to mid-forearm protecting during chemical handling, seed pouring, and equipment cleaning operations 4. Issue chemical-resistant coveralls or aprons protecting body from chemical splashes and treated seed dust during mixing and loading operations 5. Supply respiratory protection including P2 particulate respirators for workers mixing treated seed or handling dusty materials, with half-face respirators and organic vapour cartridges for concentrated liquid chemical handling 6. Establish chemical storage procedures requiring secure containers with proper labelling, separation of incompatible materials, bunding to contain spills, and protection from weather and unauthorised access 7. Provide eyewash stations within 10 seconds travel time from chemical handling areas (typically portable eyewash bottles on hydroseeder units) allowing immediate irrigation if eye contact occurs 8. Implement hygiene procedures requiring hand washing with soap and water before eating, drinking, or smoking, preventing ingestion of chemicals from contaminated hands 9. Ban food and drink consumption in work areas where chemical exposure may occur, establishing designated clean areas for break periods 10. Dispose of empty chemical containers and contaminated materials according to regulations, avoiding reuse of containers that may lead to incorrect material identification or exposure incidents

Regular inspection and maintenance of pressure hoses, couplings, and pump systems prevents failures that could cause injection injuries or whipping hose incidents. Combined with safe operating procedures including pressure relief before accessing connections, this engineering and administrative control addresses high-pressure hazards inherent in hydro seeding operations.

Implementation

1. Inspect pressure hoses daily before use checking for cuts, abrasion, bulges, or exposed reinforcement indicating developing failures requiring immediate replacement 2. Replace hoses according to manufacturer service life recommendations or earlier if damage observed, with high-wear sections (first 10 metres from pump) requiring more frequent replacement 3. Protect hoses from traffic by routing away from vehicle paths, using hose bridges where crossings are unavoidable, or positioning workers to stop traffic when hoses must cross active routes 4. Use proper couplings and fittings rated for system pressure (minimum 150 psi working pressure), ensuring secure connection by double-checking coupling engagement before pressurising 5. Implement pressure relief procedures requiring pump shutdown and pressure relief valve opening before connecting or disconnecting hoses, with pressure gauge verification showing zero pressure 6. Position safety shields at coupling points providing physical barrier protecting operators if coupling fails during initial pressurisation after connection 7. Maintain safe spray distances requiring operators to maintain minimum 3-metre clearance between spray nozzle and personnel, using extended wands if closer work is required for detail areas 8. Install pressure relief valves set at maximum system working pressure plus 10% preventing over-pressurisation from pump control malfunctions or line blockages 9. Secure nozzle control with locking devices preventing inadvertent spray activation, requiring deliberate action to commence spraying 10. Provide operators with face shields protecting against inadvertent spray contact during connection work or nozzle adjustments, worn in combination with safety glasses as primary eye protection

Comprehensive hearing conservation program including mandatory hearing protection, baseline and periodic hearing testing, and equipment noise control reduces workers' noise exposure preventing noise-induced hearing loss from chronic exposure to hydraulic equipment operating at 85-95 dB(A) levels.

Implementation

1. Conduct noise monitoring at operator positions during typical operations measuring time-weighted average exposures and identifying areas exceeding 85 dB(A) requiring hearing protection 2. Establish hearing protection mandatory zones marked around operating hydroseeder equipment extending minimum 5 metres from operating pumps and agitators 3. Provide Class 4 or 5 earplugs or earmuffs achieving minimum 20 dB noise reduction rating (SLC80), with multiple options allowing worker selection of comfortable effective protection 4. Conduct baseline hearing tests for all workers before commencing hydro seeding work establishing reference audiograms, with repeat testing every two years identifying early hearing damage allowing intervention 5. Train workers in proper earplug insertion technique as incorrect insertion reduces protection by 50-75%, using fit testing to verify adequate sealing and protection 6. Implement job rotation protocols limiting individual operator time at high-noise positions (equipment operator platform) to maximum 4 hours per shift, rotating to lower-noise tasks including ground crew duties 7. Maintain equipment according to manufacturer schedules with particular attention to pump bearings, belt drives, and mounting systems where wear causes vibration and noise increases 8. Install acoustic enclosures on pump systems or operator platforms where feasible, potentially reducing exposure by 10-15 dB improving hearing protection effectiveness 9. Prohibit removal of hearing protection while in mandatory zones even for brief periods, recognising that short high-level exposures contribute significantly to daily dose 10. Review audiogram results annually identifying trends or threshold shifts indicating inadequate protection, investigating causes and implementing improved controls before permanent damage occurs

Proper site assessment and equipment positioning procedures prevent stability and traffic hazards when operating heavy hydroseeding equipment on construction sites with varied terrain and changing conditions. These administrative controls establish safe operating parameters preventing equipment instability and interaction hazards with other site activities.

Implementation

1. Conduct site inspection before positioning equipment identifying slope angles, ground bearing capacity, overhead clearances, and proximity to edges or drop-offs that could affect stability 2. Position hydroseeder on level ground (maximum 5-degree slope) with adequate bearing capacity to support loaded weight (typically 10-25 tonnes) without sinking or lateral movement 3. Establish minimum setback distances maintaining equipment minimum 2 metres from unprotected edges, excavations, or tops of batters to prevent edge collapse and equipment roll-over 4. Use outriggers or stabilisers if equipment is fitted with these systems, ensuring proper ground contact and load distribution before commencing pumping operations 5. Deploy wheel chocks preventing equipment roll if parked on sloping ground, positioning chocks both front and rear of wheels with park brake applied 6. Plan hose routes avoiding crossing active traffic paths where possible, using hose bridges or elevated supports where crossings are unavoidable allowing vehicle passage without hose damage 7. Coordinate with site traffic management identifying safe access routes to seeding areas, establishing exclusion zones while seeding operations are active, and communicating with other plant operators 8. Assign dedicated spotter for reversing operations guiding driver with continuous radio contact or hand signals, maintaining visual contact throughout reverse movements 9. Secure chemical storage tanks and equipment on hydroseeder platform using chains or straps preventing displacement during transport or operation on uneven ground 10. Review site conditions after rain events before positioning equipment, as ground bearing capacity may be reduced and slopes more prone to instability requiring alternative access routes or work postponement

Engineering controls that stabilise slopes and improve surface conditions before seeding operations reduce slip hazards at source rather than relying on workers to avoid slipping on treacherous surfaces. This higher-order control is particularly effective but may not always be practical depending on project timelines and budget constraints.

Implementation

1. Install temporary access steps or ladders on steep batters allowing workers to ascend and descend safely without traversing unstable slopes carrying equipment 2. Grade small level platforms into steep batters at 10-15 metre vertical intervals providing stable work positions for operators managing spray hoses without standing on full slope 3. Apply erosion control blankets or matting to slopes before hydro seeding providing texture for improved footing, with blankets anchored with stakes or staples preventing movement under traffic 4. Delay hydro seeding until slopes have been track-rolled or compacted improving surface stability and reducing slip potential, coordinating with earthworks contractors for appropriate compaction timing 5. Install safety catch benches at slope bottom collecting workers who slip and fall before they slide long distances, designed as minor grade breaks redirecting falling personnel 6. Use rope handrails or cable systems installed across slope faces providing support for workers to maintain balance while managing hoses or traversing to work positions 7. Schedule operations during dry periods when ground provides better traction, avoiding seeding immediately after rainfall when clay surfaces become most slippery 8. Apply tackifier or binder chemicals at higher concentrations on steep slopes creating adhesive surface layer that provides some grip even when wet, applied by prior spray pass before main seeding 9. Consider alternative application methods for extremely steep slopes including aerial application by helicopter or long-throw spray equipment allowing application from slope bottom without requiring worker access to steep faces 10. Install safety netting at slope edges catching falling workers before they reach level ground below, used in high-risk areas such as road embankments adjacent to travelled lanes or waterways

Environmental protection procedures prevent chemical-contaminated water entering waterways while managing waste materials appropriately. These controls address both regulatory compliance requirements and prevention of environmental harm from chemicals used in hydro seeding operations.

Implementation

1. Identify environmentally sensitive areas during site assessment including waterways, wetlands, stormwater inlets, and water quality monitoring points requiring protection from chemical runoff 2. Install sediment fencing or silt barriers at downstream locations capturing any contaminated runoff from seeding areas before it enters natural drainage systems or waterways 3. Position mixing and loading operations minimum 50 metres from waterways with ground sloping away from watercourses preventing direct drainage if spills occur during chemical handling 4. Use bunded mixing areas or drip trays beneath equipment collecting any spilled chemicals or contaminated water during mixing operations for proper disposal rather than ground infiltration 5. Schedule seeding to avoid periods immediately before forecast rainfall when establishment time is inadequate and chemical washoff risk is elevated, consulting Bureau of Meteorology forecasts 6. Apply fertilisers and chemicals at specification rates avoiding over-application that increases environmental risk without improving establishment success, calibrating equipment to deliver consistent rates 7. Wash equipment at designated washdown areas with proper drainage to sewer or collection for disposal, avoiding field washing that discharges chemicals directly to environment 8. Dispose of excess mixed slurry appropriately by applying to designated areas at light rates or disposing as liquid waste if application is not possible, never dumping into drainage systems 9. Store empty chemical containers in secure areas with labels intact until disposal at licensed waste facilities or return to suppliers under container return programs where available 10. Report any chemical spills exceeding 25 litres or any discharge to waterways immediately to environmental authorities as required by regulations, implementing containment and cleanup actions

Personal protective equipment

Requirement: Safety boots with steel toe caps and aggressive slip-resistant tread for wet terrain

When:

Requirement: Fall arrest harness with dorsal attachment point and energy-absorbing lanyard

When:

Requirement: Nitrile or neoprene gloves with gauntlet cuffs and chemical-resistant coveralls or apron

When:

Requirement: P2 particulate respirator or half-face respirator with organic vapour cartridge

When:

Requirement: Face shield with chin protection worn over safety glasses with side shields

When:

Requirement: Class 4 or 5 earplugs or earmuffs with minimum 20 dB noise reduction rating

When:

Requirement: Class D/N high-visibility vest or shirt with retroreflective tape

When:

Inspections & checks

Before work starts

  • Assess site slopes for stability and access routes identifying any areas requiring fall protection systems
  • Verify surface preparation is complete with appropriate compaction and grade for seeding application
  • Inspect hydroseeder equipment including pump, agitator, hoses, and spray nozzle for damage or wear
  • Test pressure system operation checking pressure gauges, relief valves, and control functions
  • Review Safety Data Sheets for all chemicals to be used and verify proper PPE is available
  • Check that eyewash facilities and first aid supplies are accessible and unexpired
  • Inspect fall protection equipment if working on steep slopes checking harnesses and anchor systems
  • Verify hearing protection is available for all personnel who will work near operating equipment
  • Identify environmentally sensitive areas requiring protection from chemical runoff including waterways and stormwater inlets
  • Conduct toolbox meeting reviewing mixing procedures, pressure hazards, slip prevention, and emergency response

During work

  • Monitor workers for proper PPE use including slip-resistant footwear, chemical-resistant gloves, and hearing protection
  • Observe hose routing avoiding trip hazards and traffic crossings where practical
  • Check pressure gauge readings maintaining within equipment design limits and manufacturer specifications
  • Monitor ground conditions for workers on slopes watching for signs of instability or excessive slipperiness requiring work suspension
  • Verify chemical handling procedures are followed with proper PPE during seed mixing and chemical additions
  • Inspect hoses periodically for developing damage from dragging, kinking, or traffic contact requiring relocation or replacement
  • Monitor spray application patterns checking for consistent coverage and appropriate application rates
  • Check that exclusion zones around operating equipment are maintained with non-essential personnel remaining clear
  • Observe equipment positioning maintaining stability on level ground away from edges and with adequate bearing capacity
  • Monitor weather conditions suspending operations if rain commences creating slip hazards or if lightning is detected nearby

After work

  • Flush hydroseeder system thoroughly with clean water preventing material buildup and corrosion in pumps and hoses
  • Inspect equipment after use documenting any damage or maintenance requirements before next operation
  • Clean and decontaminate PPE removing chemical residues from gloves, coveralls, and face shields
  • Verify all chemical containers are properly sealed, labelled, and stored in secured locations
  • Dispose of any waste materials including empty containers and contaminated materials at appropriate facilities
  • Check seeded areas for proper coverage and application rate, documenting any areas requiring re-application
  • Remove temporary sediment controls once vegetation is established or transfer responsibility to project ongoing maintenance
  • Document any incidents, near-misses, or equipment failures for investigation and prevention in future operations

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready

Site Assessment and Surface Preparation Verification

Commence hydro seeding project with comprehensive site inspection assessing terrain, access routes, and hazards. Walk the entire seeding area identifying slope angles using inclinometer or visual assessment, noting areas exceeding 1:2 grade requiring fall protection systems. Inspect surface preparation verifying topsoil placement or subsoil preparation is complete with appropriate grade and compaction. Identify any soft spots, recently placed fill, or areas with poor drainage that may become unstable during seeding operations. Locate overhead powerlines or other elevated obstacles that could interfere with spray application or equipment positioning. Survey access routes to seeding areas verifying adequate width and gradient for hydroseeder equipment travel, identifying any tight turns, steep sections, or soft ground requiring improvement before equipment access. Map environmentally sensitive areas including waterways, wetlands, stormwater inlets, and protected vegetation requiring exclusion or special management during operations. Review weather forecast for next 48-72 hours planning operations to avoid rainfall periods that would create hazardous slip conditions or wash chemicals from newly seeded areas before establishment. Coordinate with other site activities including earthworks, traffic management, and construction schedules ensuring seeding operations can proceed without conflicts. Photograph site conditions before work documenting pre-existing issues and establishing baseline for acceptance of completed work.

Safety considerations

Site assessment identifies all hazards before work commences allowing control planning. Slope identification determines where fall protection is required. Overhead obstacle location prevents equipment contact. Weather planning avoids working in hazardous conditions. Coordination with other activities prevents interaction hazards.

Equipment Setup and Slurry Mixing

Position hydroseeder on level stable ground with adequate bearing capacity maintaining minimum 2-metre setback from slope edges or excavations. Verify equipment is level using built-in bubble levels or external level indicator ensuring proper pump operation and tank drainage. Connect water supply using clean water source filling tank to desired level based on mixing calculations for area to be seeded. Conduct equipment pre-start checks verifying hydraulic oil levels, engine fluids, pressure relief valve operation, and hose condition. Start engine and allow warm-up period per manufacturer recommendations before operating under load. Begin slurry mixing by adding mulch material (wood fibre or paper) first with agitation operating, allowing hydration time for proper suspension. Add seed mixture according to application rate calculations ensuring even distribution throughout tank. Incorporate fertiliser at specified rates based on soil testing recommendations and establishment requirements. Add tackifier or binding agents improving slurry adhesion to slopes and resistance to rainfall washoff. Include any seed treatment chemicals according to label instructions and SDS requirements using proper chemical handling PPE. Mix thoroughly for minimum 10 minutes with agitation system operating ensuring homogenous slurry without clumps or settling. Test spray pattern using water-only trial confirming nozzle adjustment is appropriate for application distance and coverage pattern required. Record batch mixture details documenting seed rates, mulch quantities, and chemical additions for quality assurance and coverage verification.

Safety considerations

Proper equipment positioning prevents instability during operation. Pre-start checks identify mechanical defects before operations begin. Chemical handling PPE prevents exposure during mixing. Thorough mixing ensures consistent application rates. Trial spray confirms equipment operation before committing to seeding areas.

Spray Application Operations

Deploy spray hose from equipment routing to starting position for seeding operations. Use hose bridges or elevated supports where hose must cross traffic routes preventing vehicle damage and trip hazards. Position ground crew operator at appropriate distance from equipment maintaining communication via radio or hand signals with equipment operator controlling pump operation. Begin application at furthest point from equipment working back toward hydroseeder preventing need to cross previously seeded slippery areas. Maintain systematic spray pattern using consistent overlapping passes achieving uniform coverage across entire area. Adjust spray angle and distance based on terrain with higher angles for elevated areas and lower angles for application into depressions ensuring complete coverage. Manage hose positioning preventing excessive kinking that restricts flow or causes pressure buildup, maintaining smooth curves when changing directions. Monitor slurry consistency observing spray pattern for signs of clogging, separation, or inadequate suspension requiring agitation adjustment or mixing modifications. Apply at specified rates cross-checking coverage achieved against tank capacity and area treated verifying application meets design parameters. For steep slope work where operator must traverse slope faces, use fall arrest harness attached to anchor at slope top maintaining attachment throughout work period. Take regular breaks when working on steep terrain preventing worker fatigue that increases slip risk, rotating personnel if extended slope work is required. Coordinate spray operations with traffic management stopping application when public vehicles approach preventing overspray onto travelled roadways or vehicles.

Safety considerations

Systematic application pattern prevents need to traverse freshly seeded slippery areas. Fall protection use on steep slopes arrests falls before serious descent occurs. Hose routing avoiding traffic prevents damage and trip hazards. Regular breaks prevent fatigue reducing slip risk. Communication ensures coordinated operation.

Post-Application Cleanup and Equipment Maintenance

Upon completing seeding operations, relieve pressure from spray system shutting down pump and opening pressure relief valve verifying gauge reads zero pressure. Disconnect spray nozzle and hose for cleaning using proper PPE including chemical-resistant gloves and face shield protecting from residual slurry discharge. Flush entire system with clean water pumping through pump, hoses, and nozzle removing all slurry residue preventing material buildup and corrosion. Continue flushing until discharge water runs clear with no seed, mulch, or chemical residues visible. Clean tank interior using high-pressure water washing all surfaces and agitation system components. Inspect pump intake screens removing any debris or material accumulation that could restrict flow or damage pump. Examine hoses carefully checking for wear, cuts, or damage sustained during operations, marking or removing damaged sections requiring replacement before next use. Clean and decontaminate all PPE including gloves, coveralls, face shields, and respiratory equipment following manufacturer cleaning instructions. Wash hands and exposed skin thoroughly with soap and water removing any chemical residues from accidental contact during operations. Properly store or dispose of any unused mixed slurry recognising that biological activity causes slurry degradation making storage beyond 24 hours problematic. Secure all chemical containers ensuring proper labelling and storage in designated areas protected from weather and unauthorised access. Complete documentation including area treated, application rates achieved, weather conditions, and any issues or deviations from planned operations. Conduct post-operation equipment inspection identifying any maintenance requirements before next deployment.

Safety considerations

Pressure relief before accessing equipment prevents spray injuries. Thorough flushing prevents equipment damage and reduces chemical residues. PPE during cleaning prevents exposure. Hand washing prevents ingestion of chemicals. Proper chemical storage maintains material integrity and prevents unauthorized access.

Frequently asked questions

What makes hydro seeded slopes so slippery and how can workers maintain safe footing during application?

Hydro seeded slopes become extremely slippery due to the combination of water-based slurry saturating the surface and the nature of freshly prepared soils lacking vegetation that would normally provide traction. Clay soils become particularly treacherous when wet, with water acting as a lubricant between clay particles creating a surface similar to wet ice. The slurry itself contains fine mulch particles that reduce friction between boots and soil. Prevention requires multi-layered controls including slip-resistant footwear with aggressive tread patterns providing maximum surface contact, fall arrest harnesses attached to secure anchors at slope tops for work on grades exceeding 1:2, surface preparation techniques such as compaction or track-rolling creating firmer surfaces, and if possible, delaying application until slopes have had initial rainfall allowing some settlement and firming. Workers should traverse slopes diagonally rather than straight up or down as angled travel requires less traction. During actual spray application, operators should remain stationary as much as possible rather than walking while spraying. Taking rest breaks prevents fatigue that substantially increases slip risk.

What seed treatment chemicals are commonly used in hydro seeding and what exposures do they create?

Common seed treatments include fungicides such as thiram (tetramethylthiuram disulphide), captan, or metalaxyl protecting seed from damping-off disease and rot, and insecticides including imidacloprid or clothianidin preventing seed consumption by insects and rodents. These chemicals are applied to seed before sale as coatings or dusts. Workers handling treated seed are exposed to dusts containing these chemicals during pouring and mixing operations. Thiram is a known skin sensitiser causing contact dermatitis with repeated exposure, presenting as red itchy rash on hands and forearms that can become chronic requiring medical treatment. Inhalation of treatment dusts causes respiratory irritation. Some treatments are acutely toxic if ingested in concentrated form. Controls include wearing chemical-resistant gloves during seed handling, using respiratory protection (P2 masks) when handling dusty materials, implementing enclosed or covered mixing systems reducing dust generation, conducting mixing operations in ventilated areas or outdoors, washing hands thoroughly before eating or smoking, and never eating or drinking in areas where treated seed is handled. Some hydro seeding operations specify untreated seed eliminating this hazard entirely, though this increases establishment risk in some conditions requiring trade-off between worker safety and agronomic success.

At what pressure does hydro seeding equipment operate and what injury risk does this create?

Typical hydroseeding equipment operates at 60-120 psi (400-800 kPa) discharging slurry through spray nozzles. While not as high as some industrial pressure systems (which may reach 3000+ psi), these pressures are still sufficient to cause injection injuries if operators are struck by spray at close range, particularly if spray contacts vulnerable areas such as hands, face, or areas with thin skin. Injection injuries occur when high-pressure fluid penetrates skin and spreads along tissue planes causing deep contamination. The organic materials in hydro seeding slurry (seed, mulch, fertiliser) create severe infection risk if injected under skin requiring aggressive surgical debridement to prevent sepsis. Most injuries occur from close-range spray contact during nozzle adjustments, hose connection failures, or coupling releases. Prevention requires maintaining safe spray distances (minimum 3 metres from nozzle to personnel), pressure relief procedures before accessing connections, use of proper couplings rated for system pressure, hose inspection and maintenance preventing failures, and face shields for personnel conducting connection work or equipment cleaning. Any high-pressure injection injury requires immediate medical attention at an emergency department even if the entry wound appears minor, as delayed treatment substantially worsens outcomes.

What noise levels does hydroseeding equipment generate and what hearing protection is required?

Hydroseeding equipment typically generates noise levels of 85-95 dB(A) at operator positions, exceeding the 85 dB(A) threshold requiring hearing protection under Australian WHS regulations. Noise sources include high-capacity centrifugal pumps, mechanical or hydraulic agitation systems, and diesel engines powering truck-mounted units. Operators positioned at equipment controls for hours during continuous application operations experience cumulative exposures well exceeding daily limits. Hearing protection including Class 4 or 5 earplugs or earmuffs providing minimum 20 dB noise reduction is mandatory within 5 metres of operating equipment. Proper earplug insertion technique is critical as incorrect insertion reduces effectiveness by 50-75%; workers require training in insertion technique with fit-testing to verify adequate sealing. Job rotation limiting individual operator time to maximum 4-hour blocks reduces exposure duration, with rotation to quieter tasks including ground crew duties. Equipment maintenance focusing on pump bearings, belt drives, and mounting systems prevents noise increases from worn components. Baseline and periodic hearing tests (audiograms) identify early hearing damage allowing intervention before permanent severe loss develops. Chronic noise exposure causing noise-induced hearing loss is irreversible, making prevention through proper hearing protection essential.

How should hydro seeding operations protect environmentally sensitive areas from chemical contamination?

Environmental protection begins with identifying sensitive receptors during site assessment including waterways, wetlands, stormwater inlets requiring protection from contaminated runoff. Physical controls include sediment fencing or silt barriers positioned downstream from seeding areas capturing runoff before entering drainage systems, maintaining minimum 50-metre buffers between mixing/loading operations and waterways, and using bunded mixing areas collecting spills rather than allowing ground infiltration. Operational controls include applying chemicals at specification rates avoiding over-application, timing operations to avoid periods immediately before forecast rainfall when washoff risk is highest, washing equipment at designated areas with proper drainage rather than field washing, and disposing of excess mixed slurry appropriately rather than dumping into drains. Chemical selection favouring products with lower environmental persistence and toxicity reduces potential harm if contamination occurs. Some projects prohibit chemical treatments entirely in highly sensitive areas, using mechanical surface stabilisation instead of chemical treatments. All chemical spills exceeding 25 litres or any waterway discharges must be reported immediately to environmental authorities with containment and cleanup actions implemented. Regular inspection of sediment controls ensures they remain functional throughout establishment period which may be weeks or months depending on growing conditions.

Related SWMS documents

Browse all documents
Trusted by 1,500+ Australian construction teams

Hydro Seeding SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.

Continue exploring

Hand-picked SWMS resources

Ready to deliver professional SWMS in minutes?

OneClickSWMS powers thousands of compliant projects every week. Join them today.