Comprehensive safety procedures for sediment fence installation and maintenance, protecting workers and the environment during civil works and construction projects.

Sediment Fencing Safe Work Method Statement

2,000+ Australian Businesses Trust OneClickSWMS

No credit card required • Instant access • 100% compliant in every Australian state

5 sec
Creation Time
100%
Compliant
2,000+
Companies
$3.6K
Fines Avoided

Avoid WHS penalties up to $3.6M—issue compliant SWMS to every crew before work starts.

Sediment fencing is a critical erosion and sediment control measure used on construction sites to prevent soil particles from entering waterways, stormwater drains, and surrounding areas. This Safe Work Method Statement provides comprehensive safety procedures for the installation, maintenance, and removal of sediment fences across civil works projects. Workers installing sediment fencing face unique hazards including working on steep slopes, manual handling of heavy materials, exposure to environmental contaminants, and working near water bodies. This SWMS addresses these specific risks with practical control measures that comply with Australian Work Health and Safety regulations, environmental protection requirements, and industry best practices for erosion and sediment control.

Unlimited drafts • Built-in WHS compliance • Works across every Australian state

Overview

What this SWMS covers

Sediment fencing is an essential temporary erosion and sediment control measure deployed on construction and civil works sites to prevent soil particles from migrating into waterways, drainage systems, and adjoining properties. These permeable barriers filter sediment-laden runoff while allowing water to pass through at controlled rates. Installation typically occurs at the perimeter of disturbed areas, along contour lines, or at strategic locations where stormwater runoff concentrates. The work involves site assessment, trench excavation, post installation, fabric deployment, and ongoing maintenance throughout the construction period. Typical applications include residential and commercial developments, road construction, subdivision works, pipeline corridors, mining operations, and any earthworks where soil disturbance creates erosion risk. Projects may range from small residential sites with 50 metres of fencing to large infrastructure projects requiring several kilometres of sediment barriers. Installation crews typically comprise 2-4 workers using hand tools, post drivers, and occasionally light machinery for trench excavation on larger projects. The duration of sediment fence installations varies from a few hours for small sites to several days for extensive barrier systems. Fences remain in place throughout construction, requiring regular inspection and maintenance, typically for periods ranging from weeks to many months. Environmental conditions significantly influence installation methods, with wet weather, steep terrain, and proximity to waterways creating additional complexity and safety considerations. This SWMS applies to all sediment fence installation, maintenance, inspection, and removal activities. It covers geotextile fabric barriers supported by timber or steel posts, including standard sediment fences, super sediment fences for high-risk areas, and modified designs for specific site conditions. The scope encompasses work on flat, sloped, and steep terrain, in various weather conditions, and near sensitive environmental areas including creeks, wetlands, and stormwater infrastructure.

Fully editable, audit-ready, and aligned to Australian WHS standards.

Why this SWMS matters

Sediment fencing installation presents significant safety challenges that require careful risk management and adherence to Australian Work Health and Safety legislation. The Work Health and Safety Act 2011 places duties on persons conducting a business or undertaking (PCBUs) to eliminate risks so far as is reasonably practicable, or if elimination is not possible, to minimise risks through appropriate control measures. For sediment fencing work, this includes managing fall hazards on slopes, manual handling risks, environmental exposures, and proximity to water. Workers face serious injury risks from slips, trips, and falls on steep, uneven, or wet terrain. Statistics from Safe Work Australia indicate that slips, trips, and falls account for approximately 20% of serious workers' compensation claims in construction, with ground-level falls and falls on slopes being particularly common in civil works activities. Manual handling of fence materials, posts, and installation equipment creates risk of musculoskeletal injuries, particularly to the back, shoulders, and knees. These injuries can result in long-term disability and extended time away from work. Environmental hazards compound safety risks. Working near waterways introduces drowning risks, exposure to contaminated water, and potential contact with dangerous fauna including snakes, spiders, and biting insects common in Australian riparian environments. Chemical exposure from contaminated soils, particularly on remediation sites or former industrial land, can cause acute health effects or long-term illness. Heat stress during summer months, particularly in northern Australia, creates additional physiological demands on workers performing physical labour outdoors. Beyond direct worker safety, proper sediment control is an environmental and legal imperative. Environmental Protection legislation in all Australian states and territories requires construction sites to implement effective erosion and sediment control measures. Sediment discharge to waterways can result in significant environmental harm, damage to aquatic ecosystems, regulatory prosecution, stop-work orders, and substantial financial penalties. A comprehensive SWMS ensures both worker safety and environmental compliance, protecting workers, the environment, and the business from preventable harm and legal consequences.

Reinforce licensing, insurance, and regulator expectations for Sediment Fencing Safe Work Method Statement crews before they mobilise.

Hazard identification

Surface the critical risks tied to this work scope and communicate them to every worker.

Risk register

High

Workers installing sediment fencing often operate on steep slopes, embankments, and unstable terrain where loss of footing can result in serious falls. Slopes may be freshly disturbed with loose soil, wet from recent rainfall, or vegetated with slippery grass. Installation work requires workers to carry materials, operate tools, and maintain balance while working across slope faces, particularly when excavating anchor trenches, driving posts, or tensioning fabric. The risk increases significantly in wet conditions, on slopes exceeding 1:3 (V:H) gradient, and when working above drop-offs or near water bodies. Falls can result in fractures, head injuries, spinal damage, or drowning if workers fall into water. The physical nature of the work, combined with fatigue from working in awkward positions on slopes, further elevates fall risk throughout the work shift.

Consequence: Serious injuries including bone fractures, head trauma, spinal injuries, or drowning; potential for permanent disability or fatality from falls on steep terrain or into water bodies.

High

Sediment fencing installation involves repetitive manual handling of heavy and awkward materials including geotextile fabric rolls (typically 15-25kg per 50m roll), timber or steel posts (2-8kg each), post drivers (8-15kg), and installation tools. Workers must lift, carry, position, and install these materials across uneven terrain, often working in bent or twisted postures when excavating trenches, driving posts, or attaching fabric. Geotextile rolls are particularly problematic due to their length and tendency to unroll unexpectedly. Post driving requires repetitive overhead striking with heavy post drivers, creating cumulative stress on shoulders, back, and arms. The work often occurs in remote locations requiring materials to be manually transported considerable distances from access points. These factors combine to create high risk of acute injuries such as back strain, shoulder damage, and knee injuries, as well as cumulative musculoskeletal disorders from sustained manual handling activities over project duration.

Consequence: Acute back injuries, shoulder and knee damage, muscle strains, or chronic musculoskeletal disorders requiring extended recovery and potentially causing long-term disability.

High

Sediment fencing is frequently installed along waterway boundaries, adjacent to dams, near creek lines, and around stormwater detention basins to prevent sediment discharge to water. Workers may need to access banks, work on unstable edges, or position fencing in locations where a slip or fall could result in entry to water. Australian waterways present multiple drowning hazards including unexpectedly deep water, fast-moving currents after rainfall, submerged objects, unstable banks that can collapse, and cold water that rapidly saps strength. Many workers lack swimming ability or may be encumbered by work boots, tool belts, and clothing that restrict movement in water. Rescue can be difficult in remote locations or during wet weather when water levels rise quickly. The risk is heightened when working alone or in small crews without rescue equipment or emergency response capability. Even shallow creeks become dangerous during flood events, which may occur with limited warning in some catchments.

Consequence: Drowning resulting in fatality; serious injuries from impact with submerged objects, hypothermia, or panic responses; long-term psychological trauma for workers and rescue personnel.

Medium

Construction sites, particularly brownfield developments, may contain contaminated soil from previous industrial use, agricultural chemicals, asbestos, heavy metals, or other hazardous substances. Sediment fencing installation disturbs soil through trench excavation and post driving, potentially exposing workers to contaminants through skin contact, inhalation of dust, or inadvertent ingestion. Geotextile fabric can concentrate contaminants as sediment accumulates, increasing exposure during maintenance activities when workers must remove accumulated sediment. Some sites have known contamination requiring specific management, while others may have undisclosed or unknown contamination. Workers handling soil and materials without appropriate personal protective equipment risk dermatitis, chemical burns, poisoning, or long-term health effects from exposure to carcinogens or toxic substances. The risk increases in dry, windy conditions that mobilise contaminated dust, and during extended periods of work where cumulative exposure occurs.

Consequence: Chemical burns, dermatitis, respiratory irritation, poisoning from toxic substance exposure, or long-term health effects including cancer from prolonged exposure to contaminated materials.

Medium

Sediment fencing installation often occurs in vegetated areas, long grass, bushland edges, and riparian zones that provide habitat for venomous snakes and spiders common throughout Australia. Work activities disturb ground cover, rocks, and vegetation where these creatures shelter, increasing encounter risk. Snakes are particularly active during warmer months and may be aggressive if surprised or threatened. Workers focused on installation tasks may inadvertently place hands or feet near snakes or spiders concealed in vegetation or under materials. Bites can occur when moving timber posts, lifting stored materials, reaching into overgrown areas, or working in dim conditions. Remote work locations and limited mobile phone reception can delay emergency response, allowing venom to cause more serious effects. Some Australian snake species including brown snakes, tiger snakes, and taipans have potentially lethal venom requiring urgent medical treatment. Spider bites from funnel-webs or redbacks, while rarely fatal, cause severe pain and systemic effects requiring hospital treatment.

Consequence: Severe pain, systemic envenomation, tissue necrosis, breathing difficulties, or death from venomous snake or spider bites; delays in treatment due to remote locations may worsen outcomes.

Control measures

Deploy layered controls aligned to the hierarchy of hazard management.

Implementation guide

Engineering Controls

Engineering controls modify the work area to reduce fall hazards through physical changes to the terrain and provision of safe access. This includes establishing formed walkways, temporary steps, or benched access paths on steep slopes where workers must transit repeatedly. Strategic positioning of material stockpiles at appropriate intervals reduces carrying distances on slopes and creates level working areas. Where slopes exceed safe working gradients, rope anchor systems or temporary handrails may be installed to provide stability points for workers.

Implementation

1. Conduct detailed terrain assessment before commencing work, identifying slopes exceeding 1:4 gradient, unstable areas, and fall hazards 2. Establish safe access routes along contour lines where possible, avoiding direct ascent/descent on steep slopes 3. Create temporary level platforms at regular intervals on long slopes for material staging and worker rest areas 4. Install rope anchors or temporary handrails on slopes steeper than 1:3 or where wet conditions increase slip risk 5. Position geotextile rolls and posts at intervals along fence line to eliminate carrying heavy materials long distances across slopes 6. Consider mechanical assistance such as all-terrain vehicles with trailers for material transport on very steep or long sites 7. Bench cut temporary access paths on steep embankments if workers must make multiple trips to same locations 8. Document all terrain hazards on site map and communicate to all workers during daily prestart briefings

Engineering Controls

Mechanical aids and specialised equipment reduce manual handling demands by transferring load from workers to machinery or devices. For sediment fencing, this includes wheeled geotextile dispensers that allow fabric to be unrolled without lifting, mechanical post drivers mounted on mini-excavators or skid steers, material trolleys for transporting posts and equipment, and small tracked vehicles for accessing steep terrain with materials.

Implementation

1. Utilise wheeled geotextile fabric dispensers that allow controlled unrolling along fence line without lifting rolls 2. Deploy mechanical post drivers (hydraulic or pneumatic) mounted on mini-excavators where site access permits 3. Provide material transport trolleys with large pneumatic wheels suitable for rough terrain 4. Consider tracked all-terrain vehicles with material trays for transporting equipment and posts to remote locations 5. Use hydraulic augers mounted on compact machinery for post hole boring in difficult soil conditions 6. Deploy portable trench excavators or small trenchers where large fence lengths justify equipment mobilisation 7. Provide lightweight aluminium extension handles for post drivers to reduce overhead work and improve leverage 8. Ensure all mechanical aids are maintained, operators are trained and competent, and equipment is appropriate for site conditions

Engineering Controls

Physical barriers and exclusion zones prevent workers from entering areas where drowning risk exists. This engineering approach establishes temporary fencing, barrier tape, or bunting at safe distances from water edges, creates designated crossing points with stable access, and may include temporary bridges or platforms where work near water is unavoidable. Engineered solutions provide visible, physical boundaries that cannot be inadvertently crossed.

Implementation

1. Establish exclusion zones marked with high-visibility barrier fencing at minimum 3 metres from creek banks, dam edges, and water bodies 2. Install temporary fencing or bunting along unstable banks or areas with potential for bank collapse 3. Create designated safe crossing points with stable footing, handrails, or temporary bridging where workers must cross drainage lines 4. Deploy personal flotation devices (PFDs) rated to AS 4758 for any workers required to work within 2 metres of open water 5. Position throw bags or rescue poles at 50-metre intervals along waterways where work occurs adjacent to water 6. Implement buddy system requiring workers near water to maintain visual contact with partner at all times 7. Install highly visible signage at water hazard locations warning of drowning risk and identifying exclusion zones 8. Restrict all work near water during flood warnings, high flow conditions, or when water levels obscure banks

Administrative Controls

Administrative controls establish systematic processes for identifying contamination risks and implementing appropriate personal protective equipment regimes. This includes reviewing site environmental reports, conducting soil testing where contamination is suspected, implementing hygiene procedures, and mandating specific PPE based on identified contaminants. These controls rely on worker compliance and supervision to be effective.

Implementation

1. Review site environmental assessment reports and contamination statements before commencing any excavation or soil disturbance 2. Conduct soil testing for suspected contaminants if no environmental reports exist, particularly on former industrial sites 3. Implement contaminated sites procedures including no eating/drinking/smoking in work areas and mandatory hand washing before breaks 4. Provide chemical-resistant gloves rated for identified contaminants when handling soil or accumulated sediment 5. Mandate use of P2 dust masks when working in dry, dusty conditions or when disturbing potentially contaminated soil 6. Supply disposable coveralls for work in areas with confirmed contamination, ensuring contaminated clothing is appropriately disposed 7. Establish decontamination stations with hand washing facilities, eye wash, and changing areas separate from clean zones 8. Train all workers on contamination risks, symptoms of exposure, and emergency response procedures for chemical contact 9. Implement waste segregation protocols ensuring contaminated soil and materials are contained and disposed appropriately 10. Maintain Material Safety Data Sheets (SDS) for all known contaminants on site and make readily accessible to workers

Administrative Controls

Systematic procedures reduce encounter risks with dangerous fauna through environmental management, awareness training, and defensive work practices. These administrative controls focus on preventing bites through vigilance, proper work techniques, and appropriate emergency response rather than eliminating the hazard itself, as venomous creatures are endemic to Australian environments.

Implementation

1. Conduct snake and spider awareness training for all workers, covering identification of dangerous species, avoidance behaviours, and bite response 2. Clear vegetation and grass to 300mm height along fence installation alignment before commencing work to improve visibility 3. Implement 'look before placing hands or feet' protocol, particularly when lifting materials, moving timber, or reaching into vegetation 4. Stamp feet and make noise when moving through long grass or vegetated areas to alert snakes to presence 5. Avoid working during dawn and dusk when snakes are most active; schedule work for middle of day where possible 6. Store timber posts and materials on pallets or racks off ground to prevent snakes sheltering underneath 7. Provide long-handled tools and extension poles to allow workers to maintain distance when working near potential snake habitats 8. Equip all work crews with snake bite first aid kits containing pressure immobilisation bandages, markers, and instructions 9. Ensure mobile phone coverage or two-way radio communication for emergency contact from all work locations 10. Establish emergency response procedures including helicopter evacuation protocols for remote locations 11. Train designated workers in pressure immobilisation technique and location of nearest hospitals with antivenom supplies 12. Report all snake and spider sightings, photographing species where safe to do so for identification and risk assessment

Personal Protective Equipment

PPE provides the final layer of protection against residual risks that cannot be eliminated through higher-order controls. For sediment fencing work, PPE must address multiple hazards including impact injuries, cuts and abrasions, environmental exposure, and contamination. PPE selection must be specific to identified site hazards and appropriate for the work tasks and environmental conditions.

Implementation

1. Provide steel-capped safety boots rated to AS/NZS 2210.3 with deep tread and ankle support for uneven terrain and slope work 2. Mandate long-sleeved shirts and long trousers in heavy cotton or cotton-blend fabric for protection against sun, vegetation cuts, and insect bites 3. Supply leather or synthetic work gloves rated to AS/NZS 2161.2 for handling posts, tools, and general materials 4. Provide cut-resistant gloves rated to AS/NZS 2161.4 Level 5 when working with geotextile fabric that can cause friction injuries 5. Issue safety glasses or goggles rated to AS/NZS 1336 when using post drivers, cutting posts, or working in dusty conditions 6. Supply broad-brimmed hard hats or sun hats with neck flaps for sun protection; upgrade to hard hats near mobile plant or overhead hazards 7. Provide high-visibility vests rated to AS/NZS 4602.1 Day/Night class when working near operational areas or vehicle movement zones 8. Issue hearing protection rated to AS/NZS 1270 when using mechanical post drivers or power tools for extended periods 9. Supply insect repellent containing minimum 20% DEET or picaridin for application before entering vegetated areas 10. Provide sunscreen rated SPF 50+ for all exposed skin during outdoor work, with reapplication every 2 hours 11. Issue gaiters or snake-proof leggings for workers operating in high-risk snake areas or thick vegetation 12. Ensure all PPE is correctly fitted, workers are trained in proper use and limitations, and PPE is inspected and replaced when damaged

Personal protective equipment

Requirement: Mandatory for all workers on site at all times

When: Required throughout all sediment fencing installation, maintenance, and removal activities; ankle support essential when working on slopes and uneven terrain

Requirement: Mandatory for all workers; light-coloured in hot weather

When: Required at all times during outdoor work to protect against sun exposure, insect bites, vegetation cuts and scratches, and contaminated soil contact

Requirement: Mandatory when handling materials and equipment

When: General work gloves required for handling posts, tools, and equipment; cut-resistant gloves mandatory when handling geotextile fabric which can cause friction burns and cuts

Requirement: Mandatory when using striking tools or working in dusty conditions

When: Required when using post drivers, cutting posts, excavating in dry soil, working in windy dusty conditions, or when splinters and debris hazards exist

Requirement: Mandatory during all outdoor work in daylight hours

When: Required continuously during outdoor work; broad-brimmed hat or hard hat with brim mandatory; sunscreen to be applied before work commences and reapplied every 2 hours

Requirement: Mandatory when working near operational areas or mobile plant

When: Required when working within 20 metres of mobile plant operations, vehicle movement areas, operational construction zones, or public interfaces; may be omitted in isolated areas with no machinery

Requirement: Mandatory when working with contaminated soil or dry dusty conditions

When: P2 rated masks required when excavating in contaminated areas, working in dry dusty conditions, or when environmental reports identify airborne contamination risks

Inspections & checks

Before work starts

  • Review site environmental reports and contamination assessments for identified hazards affecting work area
  • Inspect terrain and slope conditions along proposed fence alignment; identify areas steeper than 1:3 requiring special access controls
  • Verify all underground services located and marked; obtain relevant service authority clearances and permits
  • Check weather forecast for rainfall predictions affecting site access and water body flow rates
  • Inspect all geotextile fabric rolls for damage, verify specifications meet design requirements and environmental approvals
  • Check timber or steel posts for defects including splits, excessive knots, rust, or manufacturing damage
  • Test all hand tools and mechanical equipment for proper operation; verify post drivers, augers, and handles are undamaged
  • Confirm all required PPE is available, correctly sized, and in serviceable condition for all crew members
  • Verify first aid kit fully stocked including snake bite pressure bandages, eye wash, and current supplies
  • Confirm emergency communication systems operational with mobile coverage tested or two-way radios functioning
  • Brief all workers on site-specific hazards, exclusion zones around water, contaminated areas, and emergency procedures
  • Establish and clearly mark material staging areas, access routes, and exclusion zones before commencing installation

During work

  • Monitor weather conditions continuously; cease work on slopes if rain creates slippery hazards or if water body levels rising
  • Inspect anchor trenches for adequate depth (minimum 150mm) and proper location on downslope side of support posts
  • Verify posts are driven to required depth, properly aligned, and adequately spaced according to design specifications
  • Check fabric installation for correct orientation (fuzzy side upstream), adequate tension without over-tensioning, and proper overlaps at joins
  • Monitor workers for signs of heat stress including excessive sweating, fatigue, dizziness, or confusion; implement work/rest cycles in hot weather
  • Ensure workers maintain safe distances from water bodies and exclusion zones are not breached during installation activities
  • Observe manual handling techniques; correct poor lifting postures and ensure mechanical aids are used where provided
  • Verify workers are using appropriate PPE correctly including gloves when handling fabric, eye protection during post driving, and sun protection
  • Watch for snakes and spiders disturbed by work activities; stop work and allow creatures to move away before continuing
  • Inspect completed sections of fence for quality issues including inadequate anchoring, gaps under fabric, or damaged geotextile
  • Monitor accumulation of sediment behind fence; remove sediment before reaching one-third fence height to maintain effectiveness
  • Check exclusion zones and safety barriers remain in place and visible throughout work period

After work

  • Conduct final inspection of completed fence installation against design drawings and environmental management plan requirements
  • Verify all posts are secure, adequately embedded, and properly aligned with no lean or movement
  • Check geotextile fabric is correctly tensioned, securely attached to posts, properly anchored in trenches, and has no tears or gaps
  • Confirm anchor trenches are completely backfilled and compacted with no gaps that would allow water to bypass fence
  • Inspect all joins and overlaps meet specifications with adequate overlap length (minimum 300mm) and proper direction (upstream over downstream)
  • Document fence location with photographs and GPS coordinates for inclusion in environmental compliance records
  • Clear all waste materials including fabric offcuts, packaging, damaged posts, and installation debris from site
  • Restore any areas outside fence installation footprint that were disturbed during access or material staging
  • Establish maintenance and inspection schedule; assign responsibility for ongoing monitoring and sediment removal
  • Brief site management on fence location, maintenance requirements, expected performance, and conditions requiring repair or modification
  • Record any variations from design or installation challenges encountered for continuous improvement and future planning
  • Ensure all tools and equipment cleaned, maintained, and stored appropriately; report any damage requiring repair before next use

Step-by-step work procedure

Give supervisors and crews a clear, auditable sequence for the task.

Field ready

Site Assessment and Preparation

Commence with comprehensive site assessment identifying all hazards and constraints affecting sediment fence installation. Review site environmental management plan, contamination reports, and design drawings. Walk proposed fence alignment observing terrain conditions, slope gradients, vegetation, proximity to water bodies, and potential access challenges. Identify underground services through plans, service location, and physical inspection. Mark fence alignment with survey pegs or spray paint at regular intervals following design specifications. Establish exclusion zones around water bodies, contaminated areas, and unstable terrain using barrier tape or temporary fencing. Position material staging areas on stable, level ground close to installation locations but not in areas that will interfere with construction activities. Set up site amenities including first aid station, emergency contact information display, and drinking water supply. Conduct toolbox meeting with all workers covering site-specific hazards, emergency procedures, work sequence, and individual responsibilities. Ensure all workers have appropriate PPE and understand its correct use for site conditions. Verify weather forecast is suitable for planned work; postpone if heavy rain or extreme heat predicted.

Safety considerations

Thorough site assessment identifies hazards before workers are exposed; proper planning prevents improvisation that often leads to incidents. Ensure workers understand terrain hazards, water exclusion zones, and contamination risks before commencing physical work.

Material Delivery and Staging

Coordinate delivery of geotextile fabric rolls, support posts, fixings, and installation equipment to designated staging areas. Geotextile is typically supplied in 50 or 100-metre rolls of varying heights (usually 600mm to 900mm). Inspect all materials upon delivery checking fabric for tears, posts for splits or damage, and verifying quantities match delivery documentation. Store geotextile rolls under cover or wrapped in protective sheeting to prevent UV degradation and water saturation. Stack timber posts on level ground supported on bearers to prevent contact with soil and moisture uptake. Steel posts should be stored to prevent rust formation. Position materials strategically along fence alignment at intervals that minimise carrying distances, particularly on sloped terrain. Use mechanical aids such as tractors, all-terrain vehicles, or small excavators to transport materials to remote locations where site access permits. Distribute installation tools including post drivers, shovels, star pickets, tie wire, and fixings to work areas. For projects with steep terrain or long fence runs, establish multiple staging points rather than one central location to reduce manual handling and worker fatigue. Ensure all material storage areas are stable and materials secured to prevent unexpected movement or falling hazards.

Safety considerations

Strategic material positioning substantially reduces manual handling demands and worker fatigue. Inspect materials before use to identify defects that could cause installation failures or worker injuries. Proper storage prevents material degradation and maintains product specifications.

Trench Excavation for Fabric Anchoring

Excavate anchor trench along marked fence alignment to specifications detailed in design drawings. Typical trench dimensions are 150-300mm deep by 150-200mm wide, though specifications vary based on soil type, slope, and design requirements. Trench must be positioned on the downslope side of the fence line to ensure fabric is properly embedded. Use appropriate excavation tools based on soil conditions: shovels and mattocks for soft soils, mechanical trenchers or augers for hard soils or rocky ground. Excavate to consistent depth maintaining trench bottom at relatively constant elevation to ensure even fabric burial. Stockpile excavated soil immediately adjacent to trench on uphill side for subsequent backfilling. Inspect trench for adequate depth, proper location, and absence of rocks or sharp objects that could puncture geotextile fabric. Where trenches intersect tree roots, cut roots cleanly rather than tearing to reduce soil disturbance and maintain bank stability. On steep slopes, excavate trench in short sections (5-10 metres) rather than entire length to prevent erosion in trenches before fabric is installed. In contaminated areas, segregate excavated soil for appropriate handling and disposal according to site contamination management plan. Check for underground services one final time before excavating, using hand tools for initial penetration in areas where services may be present. Take particular care near stormwater lines, communication cables, and irrigation systems common in urban and suburban developments.

Safety considerations

Verify service locations before excavating to prevent strikes. Use correct excavation tools for soil type to reduce manual handling strain. On slopes, workers should position themselves uphill of trench to prevent falls into excavation if they lose balance. Watch for disturbed fauna when excavating.

Support Post Installation

Install support posts at specified centres along fence alignment, typically at 2 to 3-metre intervals depending on design. Posts may be timber (typically 50x50mm or 75x75mm hardwood), steel star pickets, or proprietary sediment fence posts. Drive or auger posts to required depth ensuring adequate embedment for stability; minimum 500mm for standard applications, deeper in soft soils or where high sediment loads are anticipated. Use mechanical post drivers, sledgehammers, or hydraulic rams depending on soil conditions, post type, and equipment availability. Ensure posts are installed vertically (plumb) using a spirit level or visual alignment. Posts should be positioned on the downslope side of the anchor trench, forming a continuous line without significant deviation. In rocky ground where driving is difficult, pre-drill holes using augers or excavate post holes with shovels. For very hard ground, consider mechanical augers mounted on mini-excavators or skid steers. Space posts consistently maintaining design spacing to ensure proper fabric support and even load distribution. Mark post tops with bright tape or paint to improve visibility for fabric attachment. Where fence lines change direction, install corner posts with additional bracing or deeper embedment to resist lateral loads. On steep slopes, ensure posts are driven perpendicular to ground surface, not vertically, to provide proper fabric support along slope face. Inspect each post after installation checking it is firm without rocking or movement when force applied. Document any areas where rock prevented full embedment for engineering assessment and potential remedial measures.

Safety considerations

Use mechanical post drivers where available to reduce manual handling and repetitive strain injuries. When using sledgehammers or manual post drivers, maintain stable footing and use smooth, controlled strikes. Workers should wear safety glasses to protect against splinters and debris. Avoid overhead striking that places shoulders and back under excessive strain; use extension handles to improve leverage and reduce overhead work.

Geotextile Fabric Installation and Anchoring

Unroll geotextile fabric along fence line ensuring correct orientation with fuzzy (upstream) side facing upslope and smooth (downstream) side facing downslope. This orientation maximises filtration efficiency. Position leading edge of fabric in excavated anchor trench allowing sufficient fabric (typically 300-500mm) to be buried. Commence backfilling trench immediately securing fabric in place using excavated soil. Compact backfill thoroughly using feet, hand tampers, or mechanical compactors to prevent water from bypassing fence through trench. As fabric is progressively unrolled, attach it to support posts using appropriate fixings: wire ties for steel posts, large-headed nails or staples for timber posts. Maintain fabric tension to eliminate sagging between posts while avoiding over-tensioning that could tear fabric or pull posts. Fabric should have slight belly between posts allowing some deflection under sediment load without overstressing. At fabric joins (every 50 or 100 metres depending on roll length), create overlaps of minimum 300mm with upstream roll overlapping downstream roll in shingle fashion to prevent sediment migration through joins. Secure overlaps with additional posts or extensive wire ties. Where fence terminates or meets structures, bury fabric ends in anchor trenches or secure tightly to prevent flanking of sediment around fence ends. Inspect installed fabric for tears, inadequate anchoring, or gaps under bottom edge that would allow sediment bypass. Repair any defects immediately before moving to next section. On very long installations, work in manageable sections completing installation including inspection before progressing.

Safety considerations

Geotextile fabric handling creates cut and friction burn hazards requiring cut-resistant gloves. Fabric can be unwieldy in windy conditions; cease fabric installation if wind speeds make control difficult or create flying debris hazards. Workers should maintain stable footing when tensioning fabric on slopes. Two-person minimum crew required for safe fabric handling and installation.

Quality Inspection and Acceptance Testing

Conduct comprehensive quality inspection of completed fence installation systematically checking all aspects against design requirements and installation specifications. Verify fence location matches design alignment and is positioned correctly relative to disturbed areas and drainage flows. Inspect every post confirming adequate embedment depth, vertical alignment, and firmness without movement. Check post spacing is consistent and within specified tolerances. Examine geotextile fabric for correct orientation, adequate tension without sagging or over-tensioning, and absence of tears or damage. Verify anchor trench is completely backfilled and compacted with no gaps or voids allowing water bypass. Inspect fabric attachment to posts ensuring secure fixing at appropriate intervals (typically 300mm vertical spacing for wire ties). Check all joins have adequate overlap length, correct orientation (upstream over downstream), and secure attachment. Confirm fence height above ground meets specifications, typically allowing no more than 50mm gap under fabric bottom edge. Examine fence ends and terminations ensuring proper anchoring or connection to structures preventing sediment flanking. Document installation with photographs showing overall fence alignment, construction details, and any variations from standard installation. Record GPS coordinates of fence start, end, and significant intermediate points for future reference and maintenance planning. For large projects, implement staged inspections with independent verification at key milestones. Address any deficiencies identified during inspection immediately through repair or reinstallation before considering work complete. Obtain approval from environmental or engineering personnel where specified in project requirements.

Safety considerations

Quality inspection should be conducted systematically from stable positions. Inspectors walking along completed fence should maintain awareness of terrain hazards, trip hazards from posts and fabric, and proximity to exclusion zones. Photo documentation should not require workers to enter unsafe positions or exclusion areas.

Ongoing Maintenance and Monitoring

Establish systematic maintenance and monitoring programme ensuring sediment fence continues functioning effectively throughout construction period. Inspect fence after every significant rainfall event (typically >10mm) checking for damage, sediment accumulation, and performance issues. Regular inspections should also occur at weekly intervals as minimum, with increased frequency during wet weather periods. Remove accumulated sediment when it reaches one-third of fence height to maintain filtering capacity and prevent overtopping or fence failure. Sediment removal requires careful excavation from upslope side of fence without disturbing fabric or posts. Removed sediment must be placed in stable locations where it will not re-enter drainage systems. Repair any damage to fabric promptly by patching tears with overlapping fabric pieces secured with extensive ties, or replacing entire damaged sections if tears are extensive. Reset leaning posts and reinforce with additional bracing if required. Clear vegetation growing through fence that could compromise integrity or create bypass paths. Recompact anchor trenches if subsidence creates gaps allowing water bypass. Monitor fence for overtopping which indicates insufficient capacity, ponding upstream indicating blockage, or piping (water erosion under fence) indicating inadequate anchoring. These conditions require immediate remedial action potentially including installation of additional fences or modifications to drainage management. Document all maintenance activities including dates, work performed, materials used, and observed conditions. Photograph fence condition during inspections providing visual record of performance and maintenance needs. Maintain inspection log as evidence of proactive maintenance for regulatory compliance and liability protection.

Safety considerations

Maintenance work often occurs in muddy, wet conditions creating enhanced slip and fall hazards. Workers removing sediment should be alert for contamination, snakes sheltering in accumulated sediment, and unstable working surfaces. Maintenance may occur in isolated areas requiring buddy system and reliable communications. Weather conditions may be challenging during inspections after rainfall events.

Fence Decommissioning and Site Restoration

Remove sediment fence only after site is fully stabilised with effective vegetation cover or permanent drainage structures installed. Premature removal can result in significant erosion and sediment discharge. Obtain approval from environmental personnel before commencing decommissioning. Begin removal by carefully detaching geotextile fabric from support posts using wire cutters or removing fixings. Roll fabric loosely for disposal; contaminated fabric must be disposed as contaminated waste according to site waste management plan. Extract support posts using post pullers, leverage bars, or mechanical extraction where posts are deeply embedded. Backfill post holes with excavated soil compacting to prevent subsidence. Excavate and remove fabric from anchor trenches; backfill trenches completely restoring original ground contours. Collect all wire ties, fixings, and installation debris ensuring site is left free of metal and plastic waste. Inspect areas where fence was installed confirming no residual materials remain and ground is stable. Restore vegetation in disturbed areas by spreading topsoil, applying erosion control matting if necessary, and seeding with appropriate species. Dispose of all materials responsibly: clean fabric may go to general waste, contaminated fabric requires disposal at licensed facility, timber posts can potentially be reused or disposed as green waste, steel posts can be cleaned and reused or recycled. Document removal with photographs showing restored site conditions. Conduct final site inspection confirming fence removal has not created new erosion issues and drainage functions properly. On large sites, fence removal may be staged with sections removed progressively as areas stabilise rather than removing entire installation simultaneously. This staged approach reduces risk of erosion during the transition period between temporary and permanent sediment controls.

Safety considerations

Fabric removal can release accumulated sediment creating dust hazards requiring respiratory protection. Posts may be difficult to extract after extended installation periods potentially causing manual handling injuries or tool failures. Contaminated materials handling requires appropriate PPE and hygiene procedures. Work should not proceed in wet weather that creates unstable, slippery conditions during removal activities.

Frequently asked questions

How long should sediment fencing remain in place on a construction site?

Sediment fencing must remain in place until the site is fully stabilised through established vegetation cover or permanent drainage structures. This typically means vegetation achieving 70% ground cover capable of preventing erosion, or completion of permanent paving, kerbing, and drainage systems. Removal timeframes vary from several weeks for small residential projects to many months or even years for large infrastructure developments. Australian environmental regulations and local council erosion and sediment control requirements prohibit premature removal of sediment controls. Best practice is to maintain sediment fencing until approved by environmental personnel who confirm site stabilisation. Some projects require sediment fencing to remain through establishment of vegetation during first growing season ensuring plants survive and provide effective erosion protection.

What should workers do if they encounter a snake while installing sediment fencing?

If a snake is encountered, workers should immediately stop work and slowly move away from the snake without sudden movements or attempts to capture or kill it. Australian law protects all native snakes and deliberate harm is illegal. Allow the snake to move away naturally; most snakes retreat when vibrations and noise indicate human presence. If the snake does not move and is blocking work area, contact a licensed snake catcher for removal. Never attempt to identify snake species by approaching closely; assume all snakes are dangerous. If a bite occurs, immediately apply pressure immobilisation bandage over bite site, immobilise affected limb with splint, mark bite location on bandage, keep patient calm and still, and arrange urgent medical evacuation. Do not wash bite site, cut wound, or apply tourniquet. Contact emergency services (000) immediately. All workers should receive snake awareness training before working in areas where snake encounters are possible.

Can sediment fencing be installed in wet weather or should work be postponed?

Installation of sediment fencing during light rain is generally acceptable and sometimes necessary to install controls before predicted heavy rainfall. However, work should be postponed if conditions create unsafe working environments including slippery slopes where fall risk is unacceptable, rising water levels in waterways where drowning risk exists, lightning activity creating electrocution risk, or soil conditions too wet for effective trench excavation and compaction. Installation during wet weather requires additional precautions including enhanced PPE (waterproof clothing, improved grip footwear), reduced work pace to account for difficult conditions, shortened work periods to prevent fatigue, and continuous monitoring of weather forecasts for deteriorating conditions. Some maintenance activities such as sediment removal must occur during or immediately after rain events when accumulated sediment is evident. These activities require careful risk assessment and may necessitate additional controls including buddy systems, improved communication systems, and emergency response planning.

What are the legal requirements for sediment control on construction sites in Australia?

Australian construction sites are subject to comprehensive environmental protection legislation at both state/territory and local government levels. Environmental Protection Acts in all jurisdictions prohibit discharge of sediment-laden water to natural waterways, stormwater systems, or adjoining properties. Construction Environmental Management Plans (CEMPs) are required for most developments detailing erosion and sediment control measures including sediment fencing specifications, installation standards, and maintenance protocols. Non-compliance can result in significant penalties including prosecution, fines exceeding $1 million for corporations, stop-work orders, and requirements for environmental remediation. Development approvals typically impose specific conditions regarding sediment control and monitoring. Local councils enforce erosion and sediment control requirements through inspection regimes and can issue notices requiring immediate action. The Managing Urban Stormwater: Soils and Construction (the 'Blue Book' in NSW and similar documents in other states) provides technical guidance that is often mandated in approvals. Compliance with these requirements is not only a legal obligation but also protects waterways, prevents downstream property damage, and maintains the construction industry's social licence to operate.

Related SWMS documents

Browse all documents
Trusted by 1,500+ Australian construction teams

Sediment Fencing SWMS Sample

Professional SWMS created in 5 seconds with OneClickSWMS

  • Instant PDF & shareable link
  • Auto-filled risk matrix
  • Editable Word download
  • State-specific compliance
  • Digital signature ready
  • Version history preserved
Manual creation2-3 hours
OneClickSWMS5 seconds
Save 99% of admin time and eliminate manual errors.

No credit card required • Instant access • Unlimited drafts included in every plan

PDF Sample

Risk Rating

BeforeHigh
After ControlsLow

Key Controls

  • • Pre-start briefing covering hazards
  • • PPE: hard hats, eye protection, gloves
  • • Emergency plan communicated to crew

Signature Ready

Capture digital signatures onsite and store revisions with automatic timestamps.