Document Library

Flooring SWMS documents

Explore every template covering hazards, controls, and step-by-step procedures for flooring operations.

No credit card required • Customise for every crew • Instant PDF export

Category overview

Flooring work encompasses a diverse range of installation and surface preparation activities that are fundamental to completing construction projects. From carpet and vinyl laying to timber floor installation, tiling and concrete grinding, flooring trades involve exposure to manual handling hazards, chemical exposures, dust generation, noise and repetitive strain injuries. A comprehensive Safe Work Method Statement (SWMS) is essential for managing these occupational health and safety risks whilst ensuring quality outcomes and compliance with Australian WHS legislation.

Available documents

13 fully structured SWMS templates ready to customise for your project.

Updated automatically
SWMS Document

Bedding-Screeding Floor Safe Work Method Statement

Safe Work Method Statement for floor substrate preparation, bedding and screeding work covering hazard identification, control measures and safe work procedures.

5
Hazards
5
Controls
6
Steps
Open document
SWMS Document

Carpet - Hard Floors Restoration Safe Work Method Statement

Safe Work Method Statement for carpet and hard floor restoration covering deep cleaning, repair, chemical safety and biological hazard management.

5
Hazards
5
Controls
6
Steps
Open document
SWMS Document

Carpet Laying Safe Work Method Statement

Safe work procedures for professional carpet installation including broadloom and tile carpets

5
Hazards
5
Controls
7
Steps
Open document
SWMS Document

Concrete Floor Preparation Safe Work Method Statement

Safe work procedures for concrete grinding, scarifying, and surface preparation with silica dust and vibration controls

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Concrete Grinding and Polishing Safe Work Method Statement

Safe work procedures for concrete grinding and polishing with silica dust and vibration controls

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Floating Floor Laying Safe Work Method Statement

Safe work procedures for floating floor installation including laminate, vinyl plank, and engineered wood flooring

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Floor Covering Removal Safe Work Method Statement

Safe work procedures for removal of floor coverings including carpet, vinyl, tiles, and adhesives

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Stone Sealing Safe Work Method Statement

Safe work procedures for stone sealing including chemical exposure control and ventilation for granite, marble, and natural stone surfaces

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Tiling Safe Work Method Statement

Safe work procedures for tiling including ceramic, porcelain, and stone tile installation with manual handling and cutting controls

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Timber Floor Laying Safe Work Method Statement

Safe work procedures for timber floor installation including hardwood, engineered wood, and bamboo flooring with manual handling and dust controls

6
Hazards
6
Controls
6
Steps
Open document
SWMS Document

Timber Floor Sanding and Finishing Safe Work Method Statement

Safe work procedures for timber floor sanding and finishing including silica dust control and chemical exposure prevention

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Vinyl Floor Laying Safe Work Method Statement

Safe work procedures for vinyl floor installation including chemical exposure controls and manual handling for vinyl plank and sheet flooring

6
Hazards
6
Controls
7
Steps
Open document
SWMS Document

Vinyl Floor Stripping Sealing Safe Work Method Statement

Safe work procedures for vinyl floor stripping and sealing including chemical exposure controls and ventilation for floor maintenance and refinishing

6
Hazards
6
Controls
8
Steps
Open document

Need tailored SWMS for your crew?

OneClickSWMS builds industry-specific procedures that stay compliant as regulations evolve. Generate, assign, and track SWMS in minutes.