A date is only one part of the check. Compare the document with the work, then take the crew through any changes.

Compare the SWMS with the job as it is now. Check the review and keeping rules below. If the steps, hazards or controls change, edit the same job, explain the changes to your crew and collect fresh signatures on the new version. Send the updated PDF and keep the version history together.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

Do SWMS expire?

What are the review and keeping rules?

Use your state’s wording below when checking an existing SWMS.

The SWMS must be reviewed, and revised as needed, when the relevant control measures are revised.

NSW s302Qld s302WA r302SA r302Tas r302ACT s302NT r302read 21 Oct 2026

Review and, if needed, revise the SWMS whenever the high-risk construction work changes, or when there is a sign the controls are not working, including after an incident.

Vic r328read 21 Oct 2026

Keep a copy of the SWMS until the high-risk construction work is finished, or for at least 2 years after a notifiable incident connected with the work.

NSW s303Qld s303WA r303SA r303Tas r303ACT s303NT r303read 21 Oct 2026

Keep a copy of the SWMS for the duration of the high-risk construction work.

Vic r329read 21 Oct 2026

What should I compare with the job?

  • The scope and methodCheck whether the crew is still doing the steps described, using the equipment listed.
  • The site around the workLook at access, weather, nearby trades and any newly identified hazards.
  • The controls in useAsk the crew whether the planned controls work here and what has changed.
  • The version everyone hasCompare the PDF held by the builder and crew with the latest version in your register.

How do I change and re-sign it?

  1. 1

    Open the existing job

    Edit the same SWMS for changes to that job. Note what changed and why so the crew can follow the update.

  2. 2

    Check the affected steps and controls

    Work through the changes on site. Check that the revised method fits the equipment, access and people available.

  3. 3

    Take the crew through the update

    Explain the changes and invite questions. In OneClickSWMS, each worker can open the current version by link or QR, read it and sign without an account.

  4. 4

    Send the updated PDF

    Share the new version with the builder and crew. Point out the changes so everyone can find the current plan.

  5. 5

    Keep the versions together

    The register keeps both versions. Use the keeping rules above to check your records for the job.

Does changing the same job cost extra?

You pay once for each job

Corrections to the same job are free. Edit and re-issue it, then collect fresh signatures for the new version.

Start here

Starting a new job?

Describe the new work for a free preview, then check the draft on site with your crew.

Describe the job

Which state is the site in?

Free preview from a reviewed example. No account needed.

Sources

Where this guide's information comes from

  1. 1.Safe Work Australia · Model Code of Practice: Construction work · accessed 21 Oct 2026
Last reviewed
21 October 2026
How
Practical guidance for preparing the job document. The legal wording on this page is quoted with its source and the version read.
Next review
January 2027, or sooner when a regulation changes

Questions

Questions people ask

Do SWMS expire?

Before reusing one, compare it with the work you plan to do. Check your state’s review and keeping wording above, along with any review arrangements for the site.

Who signs a SWMS after I change it?

For the OneClickSWMS signing flow, take the crew doing the work through the changes and have them read and re-sign the new version. Ask the builder about any separate site review process.