Coffee machine installation and repair SWMS, drafted for your job
Coffee machines combine stored boiler pressure, hot water and electrical parts beneath removable covers, often on a crowded service bench. Tell us the machine and site: your SWMS is drafted around installation or repair, and you check it on site before work starts.
A$39per job
However many high-risk activities it covers.
- However many high-risk activities it covers.
- 3 for A$99
- 10 for A$249
- Yearly A$129 for 120
- Monthly A$60 for 10
You review it on site before work starts.
Your Business
Safe Work Method Statement
Version 1
Draft
Coffee machine installation and repair
Site Your site address
Law Your state
High-risk construction work
Job steps, hazards and controls
| 1 | Inspect bench and isolate machine | Crowded access and connected services | High | Clear the bench and disconnect water and electrical supplies |
| 2 | Move and position machine | Heavy machine and weak bench support | Medium | Use lifting aids and check mounting stability |
| 3 | Open and service components | Stored steam and electrical energy | High | Cool depressurise and verify isolation before opening |
| 4 | Reconnect water and power | Leaks near electrical components | High | Secure water connections before electrical recommissioning |
| 5 | Test and hand back | Hot outlets and customer access | High | Control the test area and check covers and leaks |
Illustrative first page. Yours carries your business name only.
What you get
What your coffee machine installation and repair SWMS will contain
An A4 document your crew can read on site, a PDF for the builder and a sign-on register.
- Job and site detailsYour business, the site, the principal contractor, the dates.
- High-risk construction workThe categories your job involves, ticked.
- Step-by-step methodEach step with its hazards, risk rating and controls.
- How controls are checkedWho puts each control in place, monitors and reviews it.
- PPE, plant and permitsEquipment and training the job needs.
- Emergency planAssembly point, first aid, nearest hospital to confirm on site.
- Consultation and reviewWho was consulted, when it is reviewed.
- Sign-on registerYour crew signs by QR or on paper.
High-risk construction work
High-risk work on this job
This task is not usually high-risk construction work. If your job involves any category, tick it when you start and the SWMS covers it.
State notes
Rules depend on your state
Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.
Hazards and controls
What goes wrong on a coffee machine installation and repair job, and how the SWMS controls it
These rows are written for this task. Your draft adds the ones your site and method need.
- 1
Steam burns opening coffee machine boilers and pressurised fittings
High- Shut down and let the boiler cool before opening fittings
- Release pressure using the machine maker’s method and verify it is relieved
- 2
Electric shock behind coffee machine covers during repairs
Extreme- Disconnect and secure every electrical supply before removing covers
- Have an electrician verify isolation and complete electrical repairs
- 3
Strains lifting coffee machines onto narrow service benches
Medium- Use a lifting aid and check the bench supports the machine
- Clear the landing area and coordinate any team handling
- 4
Hot water spray from loose coffee machine supply connections
High- Isolate the water supply before disconnecting hoses or filters
- Secure connections and check for leaks during controlled recommissioning
- 5
Chemical burns from coffee machine descaler and cleaning solutions
High- Use controlled dosing and containers suited to the cleaning product
- Keep chemicals away from drinks and rinse using the product instructions
- 6
Customers reaching exposed coffee machine parts during test runs
High- Close the service area and refit covers before routine operation
- Control test access and keep hands clear of hot outlets
How the job usually runs
- 1Inspect bench and isolate machineCrowded access and connected services → Clear the bench and disconnect water and electrical supplies
- 2Move and position machineHeavy machine and weak bench support → Use lifting aids and check mounting stability
- 3Open and service componentsStored steam and electrical energy → Cool depressurise and verify isolation before opening
- 4Reconnect water and powerLeaks near electrical components → Secure water connections before electrical recommissioning
- 5Test and hand backHot outlets and customer access → Control the test area and check covers and leaks
PPE for this job
- Safety glasses
- Chemical-resistant gloves for cleaners
- Heat-resistant gloves for hot components
- Safety boots
- Protective apron
Your draft lists the PPE your site and method need.
After you finalise
Brief your crew and send it to your builder
Crew signs by QR
Send to my builder
PDF and register
Builder sent it back?
Make their changes and re-issue the same job free. Workers re-sign the new version.
Questions
Coffee machine installation and repair SWMS questions
- Last reviewed
- 21 October 2026
- How
- Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
- Next review
- Every six months, or when the method or rules change
Does it cover opening the boiler during coffee machine repairs?
Yes. Describe the boiler and the repair. The draft includes shutdown, cooling and pressure release before fittings are opened, alongside isolation of electrical supplies beneath the covers.
Can it cover installing a machine in an operating café?
Yes. Tell us the bench access and trading arrangements. The draft covers separating customers from the work, lifting the machine and checking water connections before controlled testing.
How much does a coffee machine installation and repair SWMS cost?
One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.
Is this a template?
No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.
Who checks the SWMS?
You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.
My builder sent it back. What now?
Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.
How does my crew sign it?
Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.
Does it work in my state?
Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.
Related
Related SWMS





