Skip to content
OneClickSWMS
CommunicationsHigh-risk work

Antenna and satellite dish installation SWMS, drafted for your job

Start with your job

Which state is the site in?

Preview from a reviewed example. No account needed.

Antenna masts and satellite dishes catch wind during lifting and can reach electrical lines beyond the installer’s immediate work position. Tell us the mounting point, equipment and site: your SWMS is drafted around access, cable routes and fixing, and you check it on site before starting.

A$39per job

However many high-risk activities it covers.

  • 3 for A$99
  • 10 for A$249
  • Yearly A$129 for 120
  • Monthly A$60 for 10

You review it on site before work starts.

The draft is a starting point. You check every step against the site, your crew and the builder's rules, then finalise.
YB

Your Business

Safe Work Method Statement

Version 1
Draft

Antenna and satellite dish installation

Site Your site address

Law Your state

High-risk construction work

  • Work where someone could fall from height

Job steps, hazards and controls

1Inspect mounting point and cable routeWeak supports and hidden electrical servicesHighCheck the structure and locate services before drilling
2Protect roof access and lifting routeFalls and overhead electrical linesExtremeInstall protected access and keep the lifting route clear of lines
3Lift and secure communications equipmentWind caught dishes and loose bracketsHighControl the lift and secure equipment before removing support
4Run cables and align the dishDrilling hazards and roof edge exposureHighUse checked entry routes and maintain protected working positions
5Test and clear installation areaLoose roof components and open entriesMediumCheck fixings weatherproof entries and lower all loose materials
Illustrative example

Illustrative first page. Yours carries your business name only.

What you get

What your antenna and satellite dish installation SWMS will contain

An A4 document your crew can read on site, a PDF for the builder and a sign-on register.

  • Job and site detailsYour business, the site, the principal contractor, the dates.
  • High-risk construction workThe categories your job involves, ticked.
  • Step-by-step methodEach step with its hazards, risk rating and controls.
  • How controls are checkedWho puts each control in place, monitors and reviews it.
  • PPE, plant and permitsEquipment and training the job needs.
  • Emergency planAssembly point, first aid, nearest hospital to confirm on site.
  • Consultation and reviewWho was consulted, when it is reviewed.
  • Sign-on registerYour crew signs by QR or on paper.

High-risk construction work

Categories this task often involves

You tick the ones your job involves. Each ticked category gets its own steps and controls, in your state's wording.

  • Work where someone could fall from height
All high-risk construction work categories

State notes

Rules depend on your state

Pick your state when you start. Your state's regulator publishes the rules and guidance for this work.

Hazards and controls

What goes wrong on a antenna and satellite dish installation job, and how the SWMS controls it

These rows are written for this task. Your draft adds the ones your site and method need.

  1. 1

    Falls at roof edges while aligning antennas and satellite dishes

    Extreme
    • Use protected access and edge protection around the mounting and alignment positions
    • Plan fall equipment and rescue where the selected access method needs them
  2. 2

    Antenna masts or access ladders contacting overhead electrical lines

    Extreme
    • Choose a lifting and access route away from overhead lines
    • Arrange service controls when separation is uncertain and keep masts inside the planned route
  3. 3

    Satellite dishes swinging in wind while being lifted onto roof brackets

    High
    • Assemble at ground level where practical and use a controlled lifting method
    • Stop lifting when wind prevents control and secure the dish before releasing support
  4. 4

    Antenna bracket fixings pulling out of weak roof or wall material

    High
    • Check the supporting structure and select mounting details for the equipment and wind exposure
    • Keep the mast supported until fixings and stays have been checked
  5. 5

    Drill penetration into hidden wiring along antenna cable entry routes

    Extreme
    • Locate services before drilling cable entries or mounting brackets
    • Arrange isolation where drilling could reach wiring and stop at unidentified services
  6. 6

    Tools or dish components falling into occupied areas below the roof

    High
    • Separate the area beneath installation and secure tools and loose components
    • Lower packaging and offcuts in contained loads rather than leaving them on the roof
  7. 7

    Exposure near active transmitting antennas on shared roof installations

    High
    • Identify transmitting equipment and arrange shutdown or controlled access with its operator before approaching
    • Keep the work outside restricted equipment areas until the arrangements are confirmed

How the job usually runs

  1. 1Inspect mounting point and cable routeWeak supports and hidden electrical services → Check the structure and locate services before drilling
  2. 2Protect roof access and lifting routeFalls and overhead electrical lines → Install protected access and keep the lifting route clear of lines
  3. 3Lift and secure communications equipmentWind caught dishes and loose brackets → Control the lift and secure equipment before removing support
  4. 4Run cables and align the dishDrilling hazards and roof edge exposure → Use checked entry routes and maintain protected working positions
  5. 5Test and clear installation areaLoose roof components and open entries → Check fixings weatherproof entries and lower all loose materials

PPE for this job

  • Non-slip safety footwear
  • Safety helmet with chin strap
  • Safety glasses
  • Handling gloves
  • Sun protective clothing
  • Fall protection equipment selected for roof access

Your draft lists the PPE your site and method need.

After you finalise

Brief your crew and send it to your builder

Crew signs by QR

Pass your phone around or print the A4 sign-on sheet. Workers read and sign on their own phones, no account.

Send to my builder

One tap emails the PDF and the version to your builder, or upload it to their inbox link.

PDF and register

A clean A4 PDF with your business name, and a register of who signed which version.

Builder sent it back?

Make their changes and re-issue the same job free. Workers re-sign the new version.

What builders check

Questions

Antenna and satellite dish installation SWMS questions

Last reviewed
21 October 2026
How
Hazard rows checked against the task; no legal line is stated unless it is logged from primary text.
Next review
Every six months, or when the method or rules change
Does it cover mounting a satellite dish on an existing roof?

Yes. Describe the roof, dish size and bracket arrangement. The draft covers supporting structure checks, wind during lifting, protected access and keeping people clear beneath the installation.

What if there are transmitting antennas on the same roof?

Arrange access with the equipment operator before approaching them. The draft covers identifying transmitting equipment and keeping installation work outside restricted areas until shutdown or other access controls have been confirmed.

How much does a antenna and satellite dish installation SWMS cost?

One job uses 1 SWMS when you finalise: A$39 for one, however many high-risk activities it covers. AI drafting needs a SWMS pack or plan. Packs and Yearly cost less per SWMS.

Is this a template?

No. You describe the job and the site, and the SWMS is drafted for them. You edit anything, then finalise it.

Who checks the SWMS?

You do, with your crew, on site before work starts. The draft gives you a strong starting point; the person running the work makes sure it matches the site.

My builder sent it back. What now?

Open it, make the changes they asked for and re-issue it. Corrections to the same job are free.

How does my crew sign it?

Show the QR code on your phone or print the A4 sign-on sheet. Workers read and sign on their own phones without an account.

Does it work in my state?

Yes. You choose the state before drafting, and the document names the law that applies there. Victoria uses its OHS Regulations.

A$39 a job · you review it on site
Start my SWMS